Loading...
HomeMy WebLinkAboutTract Map 8369 Soils ReportOF APR 14 1994 • CFY o -r= - ',TA Geotechnical • Geologic • Environmental 24890 Jefferson Avenue • Murrieta, California 92564 • (909) 677-9651 • FAX(909)677-9301 Mailing Address: P.O. BOX 490 • Murrieta, California 92564 April 11, 1994 Alta Vista Community Association P.O. Box 890143 Temecula. California 92589-0143 Attention: Mr. Jack Leathers and Ms. Jo. Ann Lamb W.O. 626 -B -RC Subject: Compaction Report of Grading, Pipe and Board Repair of Slope Failures, Tracts 8369 and 8369-1, Alta Vista Project, Temecula, Riverside County, California Reference: "Geotechnical Investigation of Existing Slope Failures, Tracts 8369 and 8369-1, Alta Vista Project, Temecula, Riverside County, California," W.O. 626 -A -RC, by GeoSoils, Inc., August 31, 1993. In accordance with your request, this geotechnical report of grading is provided for the regrading of slope failures within tracts 8369 and 8369-1 in the city of Temecula. The grading within the subject slope failures began on December 24, 1993, and was completed on March 11, 1994. Unless superseded by recommendations presented herein, the recommendations contained in the referenced report remain pertinent and applicable. PURPOSE OF GRADING The purpose of the grading was to repair 11 slope failures within previously graded slopes located on the subject site. ENGINEERING GEOLOGY The geologic conditions exposed during the process of grading were frequently observed by a representative from our firm. The geologic conditions encountered generally were as anticipated as presented in the referenced report (GeoSoils, Inc., 1993). Unless specifically superseded in this report, the evaluations, recommendations, and conclusions in the referenced report for the site remain pertinent and applicable. GeoSoils, Inc. l Alta Vista Community Association W.O. 626 -B -RC Repair of Slope Failures April 11, 1994 Tracts 8369 and 8369-1, Temecula, California Page 2 SOILS ENGINEERING Preparation of Existing Ground 1. Prior to grading, the major surficial vegetation was stripped and hauled offsite. 2. Previously placed fill materials involved with the slope failures were removed to .expose competent fill and/or bedrock materials in areas to receive fills. 3. Subsequent to the above removals, the exposed subsoils were scarified to a depth of about 6 inches, brought to at least optimum moisture content, then compacted to a minimum relative compaction of 92 percent of the laboratory standard. Fill Placement 1. Fill consisted of native onsite soils and imported soils that were placed in 6- to 8 - inch lifts, watered, and mixed to achieve at least optimum moisture conditions, and compacted using hand tampers. 2. Fills placed on surfaces steeper than 5:1 (horizontal to vertical) were benched into competent material. Field Testing 1. Field density tests were performed using the sand cone method ASTM D 1556-90. 2. Field density tests were taken at periodic intervals and random locations to check the compactive effort provided by the contractor. Based upon the grading operations observed, the test taken are considered representative of the compacted fill. 3. Visual classification of the soils in the field was the basis for determining which maximum density value to use for a given density test. GeoSoils, Inc. Alta Vista Community Association W.O. 626 -B -RC Repair of Slope Failures April 11, 1994 Tracts 8369 and 8369-1, Temecula, California Page 3 Maximum Density Testing The laboratory maximum dry density and optimum moisture content for the major soil types within this construction phase were determined according to test method ASTM D-1557-91. REGULATORY COMPLIANCE Processing of original/existing ground and placement of compacted fills under the purview of this report have been completed under the observation of and with selective testing provided by representatives of GeoSoils, Inc. and are found to be in general compliance with our referenced report (GeoSoils, Inc., 1993). Our findings were made in conformance with generally accepted professional engineering practices, and no further warranty is implied or made. GeoSoils, Inc. assumes no responsibility or liability for work, testing, or recommendations performed or provided by others. This report is subject to review by the controlling authorities for this project. GeoSoils, Inc. Alta Vista Community Association W.O. 626 -B -RC ' Repair of Slope Failures April 11, 1994 Tracts 8369 and 8369-1, Temecula, California Page 4 We appreciate this opportunity to be of service. If you have any questions, please call us at (909) 677-9651. Respectfully submitted, gg1OFESS/o ��Q�O PN J. JFS.SgI�y GeoSoils, Inc. Q Go w No. 439 2 ^ Eo.6-30-97 �cS G�,OT fCHN�GPv�Q'* Alan SSUp glFOFCA`F Civil Engineer, RCE 18431 Geotechnical Engineer, GE 439 ?Jo l< i Xan ct Manager RGS/JPF/AJJ/rs Distribution: (3) Addressee (3) Mr. Jim Faul - City of Temecula GeoSoils, Inc. GeoSoils, Inc. Geotechnical 24890 Jefferson Avenue • P.O. Box 490 • Murrieta. California 92362 Alta Vista Community Association P. 0. Box 890143 Temecula, California 92589-0143 Attention: Mr. Jack Leathers RECEIVED Nov 771993 cITy OFF TEMECULA. Geology (714) 677-9651 • FAX (714) 677-9301 October 21, 1993 PR 626 -B -RC Subject: Proposal and Cost Estimate for Geotechnical Engineering Services During Slope Repairs, Tracts 8369 and 8369-1, Alta Vista Project, Temecula, Riverside County, California References: 1. "Geotechnical Investigation of Existing Slope Failures; Tracts 8369 and 8369-1, Alta Vista Project, Temecula, Riverside County, California," dated August 31, 1993, W. 0. 626 -A -RC, by GeoSoils, Inc. 2. "Cost Estimate for Geotechnical Services During Slope Restoration, Alta Vista Project, Temecula, California," dated September 30, 1993, PR 626 -B -RC, by GeoSoils, Inc. Dear Sir: In accordance with your request, we are pleased to submit this estimate of costs for geotechnical engineering services during slope repairs at the subject site. The purpose of our work would be to document that the repairs to the existing slope failures at the previously graded site are performed in accordance -with the recommendations and geotechnical design criteria outlinedin the referenced report. Based on conversations with the contractor, and as indicated previously in referenced document No. 2, the duration of the job span is estimated at 5 to 6 working weeks, and field technician time and nuclear densometer time is estimated at four hours per—day. We have furtherassumed four hours (two maximum dehsi y tests —of- laboratory technician time per week, two hours of staff time per week, and one-half hour of principal time per week. Los Angeles Co. (818J 785-2158 • Orange Co. (714J 647-0277 • San Diego Co. (619) 438-3155 Alta Vista Community Association Tracts 8369 and 8369-1 Alta Vista Project, Temecula SCOPE OF SERVICES October 21, 1993 PR 626 -B -RC Page 2 1. Compaction testing for the slope repair backfill within the limits of the project in groups of four tests or more. 2. Laboratory testing incidental to compaction testing. 3. One final -report (6 copies) summarizing the results of the testing and services provided above. ESTIMATED FEES The cost of these services depends mainly on the number of trips to the site that are required, the number of retests due to initially inadequate compaction and the time span required to complete the entire project. The duration of the job span is estimated at 5 to 6 working weeks, and field technician time and nuclear densometer time is estimated at four hours per day, for construction during normal work hours, Monday through Friday. No overtime has been anticipated. We have further assumed four hours (two maximum density tests) of laboratory technician time per week, two hours of staff time per week, and one-half hour of principal time per week. 1. Slope Repair Backfill Observation and Testing Principal Engineer/Geologist 0.5 Hrs/wk x 6 wks x 5100.00/Hr Staff Engineer/Geologist Field Technician 2 Hrs/wk x 6 wks x $75.00/Hr 20 Hrs/wk x 6 wks x $45.00/Hr Nuclear Densometer, 20 Hrs x 6 wks x 58.00/Hr GeoSoils, Inc. 300.00 5,400.00 Alta Vista Community Association October 21, 1993 Tracts 8369 and 8369-1 PR 626 -B -RC Alta Vista Project, Temecula Page 3 Laboratory Technician (2 maximum density tests/wk) 4 Hrs/wk x 6 wks x $52.00/Hr 1,248.00 Subtotal 8,808.00 2. Final Soils Compaction Report Principal Engineer/Geologist 1 Hrs x $100.00/Hr 100.00 Staff Engineer/Geologist 5 Hrs x$75.00/Hr 375.00 Technical Illustrator 8 Hrs x $45.00/Hr 360.00 Office Services/Reproduction 165.00 Subtotal 1000.00 TOTAL 9,808.00 As shown above, the overall cost for the engineering services for the subject site, as described, would be $9,808.00. Our charges for the above scope of services would not exceed the fees shown in our cost breakdown. We would invoice monthly on a time and materials basis. Any outstanding invoices and/or charges would be due and payable at the time our report is presented to you. If services are requested that are not included in our fee breakdown, they would be considered an extra cost item. All additional work beyond the scope and parameters of this proposal would be charged on a time -and -materials basis as shown on our attached Agreement and Work Order. You would be contacted for authorization of any additional work prior to commencement of this additional work. Charges for additional costs, incurred due to subcontractors' failing tests, unpreparedness or where work was not ready as indicated by the called -in request, GeoSoils, Inc. Alta Vista Community Association Tracts 8369 and 8369-1 Alta Vista Project, Temecula October 21, 1993 PR 626 -13 -RC Page 4 would be charged in addition to the proposed amounts. These charges would be itemized individually on the monthly invoice in order that the appropriate subcontractor may be backcharged. Enclosed are two copies of this proposal and our "Agreement and Work Order." Please sign, date, and return both original copies of the Agreement to us. An executed copy will be returned to you. If you have your own contract forms, we would be pleased to use them, subject to our review and provided that this proposal and its enclosures would be incorporated as part of your contract form. We appreciate the opportunity to submit this proposal. If there are any questions or if you need any clarifications, please contact the undersigned at (909) 677-9651. Respectfully submitted, GeoSoils, Inc. John P. Frank in Principal Geologist JPF/jmd Attachment: Agreement and Work Order (F-16) Distribution: (2) Addressee (1) Jack Leathers - home address GeoSoils, Inc. SLOPE REPAIR UPDATE Dear Property Owners, October 8, 1993 After the ballot was defeated 52 to 43 last June 15th, the Board contacted the City concerning our status. They indicated the slope failures constitute a public health and safety risk. The City indicated that if we don't repair the slopes they will cause the.repair to be made and bill us. They also Indicated that they have the power to lien our propertles If we failed to pay. The Board asked what was required In order to obtain a permit. They told us a report from a geologist would be necessary. We hired Geo Soils, Inc., to furnish us with a report. We just received it September 10th. It was immediately turned over to the City, with additional material, and a permit was issued. We used this report in asking four contractors to bid on the work. We asked our landscape maintenance company to furnish us with a plan and bid to landscape the areas and re-establish the irrigation system. We have added together the bid, known costs, and estimated costs. The sum amounts to almost $150,000. Borrowing this amount through the Small Business Administration, for thirty years at 4% Interest will require a monthly payment from each property owner of approximately $5.00, according to the SBA. We are not guaranteed at this time a 30 year term, but they feel reasonably sure our request would be approved. We have selected the most economical proposal (pipe and board method), among the proposals that the geologist recommended. We have changed the ballot so that it refers only to this particular disaster–not to any in the future. The cost will be the minimum, based on the geologist's report By doing the work we. do not legally accept the responsibility. It is the Board's feel- ing that the responsibility remains with the developer. We have made a demand on the developer, who has turned the matter over to their insurance carrier, who has agreed to consider the claim. We will further investigate and pursue this claim If we see that we have a legitimate and economical possibility of recovering money. Any money received would be used to reduce our debt. None of us had a choice how the problem would be fixed. The City requires the geologist report and the report tells us the methods of repair, of which we chose the most economical. Thank you for reading this—please refer to the ballot and please vote. Your Board of Directors recommend that this bylaw change be approved. ALTA VISTA BOARD OF DIRECTORS BALLOT AMENDMENT TO BYLAWS, ARTICLE V, SECTION I ALTA VISTA COMMUNITY ASSOCIATION SEPTEMBER, 1993 The Ouestion: Shall the last sentence of Article V, Section 1 of the Bylaws of the Alta Vista Community Association, which reads as follows: Notwithstanding any or all of the foregoing powers, the Board of Directors shall not enter into any contracts which bind it or the Association for a period in excess of one (1) year, unless reasonable cancellation provisions are included therein. be deleted and replaced with the following: Notwithstanding any or all of the foregoing powers, the Board of Directors shall not enter into any contracts which bind it or the Association for a period in excess of one (1) year, unless reasonable cancellation provisions are included therein. However, the Board of Directors shall have the authority, without a vote of the membership, to enter into a contract of any duration for the purpose of borrowing or otherwise obtaining government disaster relief funds from the U. S. Small Business Administration, or its designated representative(s), to repair nine slide areas that occurred in January/ February, 1993. The purpose of any such funds obtained by the Board of Directors shall be for investigating, analyzing and repairing the nine slope failures that lie within the Association's responsibility to maintain or repair. The Board of Directors shall be entitled to pass a special assessment in an amount necessary to repay this specific disaster loan obtained from the U. S. Small Business Administration, or its authorized representative(s). The amount of the special assessment shall be spread over the term of the loan. The special assessment may be assigned as collateral for the loan as required by the SBA. PLEASE NOTE: In order to approve the proposal, a minimum of 76 homeowners must vote "Yes" to approve the amendment to the Bylaws and to pass the special assessment as outlined above. (over) The Ballot YES, I/we APPROVE of the amendment to the Bylaws, Article V, Section 1 as stated above, which will allow us to pay for the cost of the repair over a period of time and allow us to pay quarterly instead of in a lump sum payment. El NO, I/we DISAPPROVE of the amendment to the Bylaws, Article V, Section 1 as stated above, understanding that there will possibly be a lump sum payment requirement when the work is done, as we could not then obtain a loan. (signature) (signature) (Alta Vista address) Please return the ballot to: Alta Vista Community Association P. O. Box 890143 Temecula, CA. 92589-0143 Return the ballots prior to October 22, 1993 alta Vista Community Association P.O. Box 890143 Temecula, Ca. 92589-0143 Board Of Directors: 5 November, 1993 42567 Remora St, Temecula, Ca, 92592 Ref: Slope erair Update octGoer '�, 1993 The referenced letter sent to associ-tion members to elicit approval of a huge government loan for geologic repair of slopes on private property contains mis-leadin- and incorrect informaation, 1. The letter states that the city has determined that the slope failures constitute a public health and Safety risk and if we don't repair the slope they will cause the repair to be made and bill us, duct: City officials have recently stated that NO determination has been made by the city for either slope status or actions for repair. 2. The letter !aso states that by doing, the 'r:ork we do not legally accept responsibility. Fact: The proposed change to the Association By-laws states "The purpose of any such funds obtained ------- sh_=.11 be for investivatin , analyzing and repairing the nine slope failures that lie within the associc:tions responsibility to maintain or repair". This is tantamount to accepting responsibility. 3. The ballot text is limited to repairing with a loan or repairir�E with lump sum payment. 1,10 provision is ms.de for not repairing until legal responsibility is established, The C.C.k.'s provide for member` vo a for repairing or not rer.•airini items thrit are .%ithin the %.ssco- iations responsibility with t e added provision thst any insurance proceeds can be distributed to members. In view of the foreEoin,; and the fact tho.t no common usage :.reas exist in the tract ie; all lots are sepaAely deeded with some having desig- nated easements for association maintenance of landscat.e and sz:ri_:kler s stems, Tease enz5ure that legal responsibility is esta.Q�ishe before committment of ssoci__tion f—un-•s to any repair activity and that formal requests from the city have been received based on th-t deter:in-tion, any city liens on property should be directed to the or:aers of the affected lots in the absence of le�.-al determination that the association is totally responsible. Further, some of the dema.ze has been reportedly caused by owners of up - slope lots which may or may not be in violation of provisions of the California Civil Code. Other possibilities include ;:re -exist- ing -eolo;;ic fe-tures, developer actions, responsible county depart- ments and possible community association contrc,ctor necligenoe. All of these should be addressed before lon.• term co mitt.:ent to a loan. Yost importantly,any current actions may set precedence for future calamities of larSe proportions. I/We respectfully request that the P,ov. 7 ballotting be set aside until all accurate information is made available to voting members. Burlie L. Cole e�. Cole w FIRST AMENDMENT TO BYLAWS OF ALTA VISTA COMMUNITY ASSOCIATION The following First Amendment to the Bylaws of Alta vista Community Association was adopted by the members of the Association pursuant to the terms of Article VIII, Amendments. 1. That portion of Article V, Section 1 of the Bylaws that reads: Notwithstanding any or all of the foregoing powers, the Board of Directors shall not enter into any contracts which bind it or the Association for a period in excess of one (1) year, unless reasonable cancellation provi- sions are included therein. is hereby amended to read as follows: Notwithstanding any or all of the foregoing powers, the Board of Directors shall not enter into any contracts which bind it or the Association for a period in excess of one (1) year, unless reasonable cancellation provisions are included therein. However, the Board of Directors shall have the authority, without a vote of the membership, to enter into a contract of any duration for the purpose of borrowing or otherwise obtaining govern- ment disaster relief funds from the U.S. Small Business Administration, or its designated representative(s), to repair nine slide areas that occurred in January/Febru- ary, 1993. The purpose of any such funds obtained by the Board of Directors shall be for investigating, analyzing and repairing the nine slide areas on the slope easement areas lot that lie within the Association's responsi- bility to maintain or repair. The Board of Directors shall be entitled to increase the homeowners assessment by the amount necessary to repay this specific disaster loan obtained from the U.S. Small Business Administra- tion, or its authorized representative (s) as an emergency assessment authorized by Civil Code Section 1366(b), without an additional vote of the membership. - 1 of 2 - C:\CLffWS4\2957.01\8YLAWAME.#1 Y Except as expressly amended herein, the provisions of the Bylaws of Alta Vista Community Association shall remain in full force and effect. I hereby certify that I am the duly elected and acting S,ecretary of the above Association and that the above First Amendment to Bylaws received the required approval of the Members of the above Association. DATED: 199-3 . STATE OF CALIFORNIA COUNTY OF ��% t�s IA f l S.S. On N 0 V l�N BL R 9 ijqq_� before me, 04'go J--X1,14-IRk a Notary T011c =foJ idLYLie, personally appeared personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) islp"ubscribed to the within instrument and acknowledged to me that /sheljAWexecuted the same in hWher/)bt authorized capacity(ies), and that byAtslhero" signature(s) on the instrument the person(s). or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal Signature F 249215-9r) (7 „ re ary FOR NOTARY SEAL OR STAMP Y tt-l►ri.-'J a� • . REDI-LETTER TO: t I,:,r ; .�.�rd, ZN-�: - FROM: SUBJECT: DATE: 1— MESSAGE: �i�. >,-1c� Z>='���rrcg Sug�vY.\1Tc`O Tr.t. EaPr7Cr-Ic=D r"1FC'� Z r0� rco L-Z� n x \'FF L rT'/ IJl SONY SAN. �a TH I"r yeCL"P r.� + a ` CVLO YCU \�L ErIS1U—�c,a" .3\� --II+E I4: CS -Tc ")T V/ ca; , i Cs I for ti�S SIG RkFORK, c% 4S468(4P468 POLYPAK (50 SETS) ❑ NO REPLY NECESSARY �r 0 REPLY RE9UESTED - USE REVERSE SIDE CARBONLESS SPEEDISEI FIELD TESTING REPORT CLIENT TRACT. SUPT. CONTR EQUIPMENT w.0._ DATE_ .0.— DATE_ NAME HOURS P FAE I 4L OF --c i cation Alo Moisture Content % 7 Relative Compaction =Evil MOM "JWJJGL:j 11MA Kati L7jM jU*4 MWEMWAAMOVABIRMW �—�FgV .dWAA HIM! �111M� COMMENTS: FIELD TESTING REPORT CLIENT l'f�. /i Gil ./� TRACT SUPT. W.O. bA6 -Q ' `` DATE NAME HOURI LOCATION OF 40 COMMENTS: is@O.SO1 S^I c��� By: rr Page of _ CL SUPT. EQU FIELD TESTING REPORT �C TRACT C Dry �- / CONTRACTOR— n DATE NAME L -}J/( HOURS LOCATIO:i_��_(�71 COMMENTS: G/, By: Page % of Moisture�i pill t/A�'1� rsri►m rWlm COMMENTS: G/, By: Page % of FIELD TESTING REP RT 7 ' l/ CLIENT �(-(' /A 'R"1 I o -k TRACT c/ / 1D SUPT w. o. ( 1' /—,eL DATE C 6— NAME HOURS LOCATION ::�2C 11 COMMENTS: By: Page of �•. Moisture • , ry p. COMMENTS: By: Page of FIELD TESTING REPORT CLIENT rjITRACT�U SUPT. /r _J CONTRACTOR W. 0. DATE NAME _// j - COMMENTS: nc. By: (— Page of •r •ttv Content1- 70'. 1 M , UMME "ll WMAPOWMA■-■1111111m, - 11=111111111111M, COMMENTS: nc. By: (— Page of FIELD CLIENT SUPT. EQUIPMIENT l TESTING REPORT TRACT n DATE aOURS LOCATION 11 COMENTS: 0-1L u. .'Ul GeoSoil/s, Inc- 3y: nc.ay: Page _�_ of •., mDen ity . . - u��i�S� i��/ �i .P. VIA ����I__ A r111M �L/��►��■■I�ii� J "AA _ , A nil 1. ■,_ err.+ laq AIM COMENTS: 0-1L u. .'Ul GeoSoil/s, Inc- 3y: nc.ay: Page _�_ of TestRe No. Location 1:t ive Compaction '.4 mlll,�.WlffilMIM."Imm, IWOO.M.0, WINFIS M#W�MAMMVM M�� AM� NAWIMPAMEPAW p -"O Wi�m� W I "ISPIA W. W" Al CM4ENTS: C. By: Page of CLIENT SUPT EQUIPMENT-' W.O. 6,Ac--&ec_ . FIELD TESTING REPORT DATE 3- � NAME HOURS �. l TRACT LOCATION _, TJ / CONTRACTOR COMMENTS: Geo S01 By: Page �_ of IS PA WNIIII w0m� COMMENTS: Geo S01 By: Page �_ of CLIENT_ SUPT._ EQUIPMENT FIELD TESTING REPORT TRACT CONTRACTOR_ W.0. DATE_ NAME_ HOURS LOCATION I —/U ® ®� Densitycti ��'. ► . -.. ,M � _•_rte � �I�rwr�■�i��� COMMENTS: �,ib Page / of FIELD TESTING REPORT CLIENT A I JA I/i5{y TRACT LOCATION SUPT. —SACK //rr w. o. 6z& - S- i2 -C DATE_ (Z 17-'11 j 3 NAME Pie kA,. c.( HOURS Z -C Test No. Elev. or Location Depth Moisture Content % YOFTTP . p.c.f. _CULA / QAP�te�ati a Test Compaction Type Soil Type ,4 /1 too, Pi is e le B 1 1 A4 a a- te e-1, i r e � 4 o gr,de M v cr - r:✓ % P iCH o l COMMENTS: GeoSoils,/Inc. By: pave of FIELD TESTING CLIENT V i5 TRACT W.0.i�A7(„ -13"IZ-C REPORT DATE lZ�2y�93 NAME L.GL! ArC,9 HOURS LOCATION SUPT.'f A c.1C_ CONTRACTOR e //r�� EQUIPMENT Test No. Location Elev. or Depth Moisture Content % Dry Density p.c.f. % Relative Compaction Test Soil Type Type 0 6-5r..✓ �G�/OC✓, 21 S O Z v lot f, 50,11 -SZ e a edQ tel lfo vv n e - v k C b ert ., - b e vrr.Q Ip b "J roll l etl rou"JI L j- r AC Z" A le o US 10 l w. -j -::S N+� �SAC'S NA01 Pt_ A 7,erlto .ee,10 /e & COMMENTS: Inc. By: Page T of Z FIELD TESTING REPORT CLIENT A I+Q VT I R TRACT SUPT. 1►rA &Z K- CONTRACTOR EQUIPMENT .d- LOCATION w.0._ -d-? e DATE IZ12,11 3 NAME I C .� HOURS - o Test No. Elev. Moisture Dry or Content Density Location Deptn % p.c.f. Relative Compaction Test Type Soil Type i; �, O 11 .) Ale - b. , v c % ^ � � , qr I l t r� , f a , c+, `v V2 —j e CL r e CAL COMMENTS: GeoCSoi , Inc. Ey: Page of PCIPM gall FIELD TESTING REPORT W. 0. Coa ca - a - Z.C- DATE rj}2_�aR� �c3 NAME K tc L w, rA HOURS 3.0 CLIENT _41-� Oq TRACT LOCATION 7C:v. e ¢ w %(3l SUPT. 3ACL-' CONTRACTOR Net 1\,e r EQUIPMENT Test No. - Location Elev. or Deptn Moisture Content % Dry Density p.c.f. Relative Compaction Test Type I Soil Type N e- CA S, uG5iem 7 4 1 RK� rV L /+ /� A) iI UV i '; / ocv b HA 11 C/ �, r 0, " Goo -510,14, l.1`Fpi r14Y IJ t.- — 1 1 Y, lepec, a re k V19 ,2.0e— /V e -01 IC &/0 cv S ape. ;1 r E h boa S/ a /1 leg A e r kn 4' l cive- 10 Sewe ` Ze %YAM awr S w.¢toet Q 3r 1-e-Cfi3•f%O 0 0&-f .S' e- Or- / el.eH C3reoctt l;,c.r4 a, ed k o �Q _'mak •� �Io ti eros _� F ,5 ar e. F -S clu 2 e �.EF,;- e- o e• Sbaulbe Lai- oci F - r os' 1 � COMMENTS: ��►1CI E �ArIGiQ � OUe.:- �:.fo J ecr C3.r'eQ �o ;Z¢�O tL •L n G' u Ino r: V e 5 FORM 89/1 L J0 SLc.T �o GeoSoils, Inc. By: Page of FIELD TESTING REPORT CLIENT A46\, N/iS [Q TRACT W.O. cp:72(D-a-iZe- DATE NAME �12 t -W A : Cf HOURS 6 _0 LOCATION �Pw�ec.rle SUPT. SQCI4- CONTRACTOR J�e; /I eT EQUIPMENT 3IoPE 1_ 3 ",�;1 ire �l,ar"✓ ' i/✓ �rocc'--�5 IAC e m COMMENTS: g/1lV.y tri( .Sierl O;OG JffH.I0rc4ffrrJ 01 IfAl T- i• below rieyis Rfou ,.A S' 4,4ce. .2X J?" %/fAird luc�a�� Iro , IACe- f Sn;L Cm,,e i2 %O per 6-S-7 3 ea; Ls i2eo2r, GeoSoils, Inc. P✓cc-es,< f'Ae By: II rr .5e� F �hFPI 2.- (2ec1r1.2ii. c. Page F MA ►a t�ni5 vu P� Mz-WmIIIIIM- WIMP IWAIFJ�: WIN WN rod IIIMo- • r - G swi #LI _ g.1! _ •'TSS----- _ L ",�;1 ire �l,ar"✓ ' i/✓ �rocc'--�5 IAC e m COMMENTS: g/1lV.y tri( .Sierl O;OG JffH.I0rc4ffrrJ 01 IfAl T- i• below rieyis Rfou ,.A S' 4,4ce. .2X J?" %/fAird luc�a�� Iro , IACe- f Sn;L Cm,,e i2 %O per 6-S-7 3 ea; Ls i2eo2r, GeoSoils, Inc. P✓cc-es,< f'Ae By: II rr .5e� F �hFPI 2.- (2ec1r1.2ii. c. Page of ►a t�ni5 vu P� FIELD TESTING REPORT CLIENT AIF V Sha TRACT SUPT. -T4cL<- CONTRACTOR M DATE ►Z/3�IQ3 NAME Ry:,y .,.tee HOURS Ca -O LOCATION I ew�GC-�► COMMENTS: COMMENTS: GeoSoils Inc. By: Page of Elev. Moisture Dry Test or Content Density Relative Test Soil No. Location Deptn % p.c.f. Compaction Type Type //-V //8.9 93- N 0 ffl C /40 S o /V ID L /11-1 cl 7- fud 111.2�- /0 3 /o- //3.� 88•z NO D F es Q f e y r n el f ArVr& r O q r'd r n/ <ACk 0 La ! O t `- doe A e , Y00 r C' 0AG V: O J rti P d J. r� ES e - S C: iPL bJ I e t5 r e- f oa C w uc %o loe ` e- u Lr;C0- COMMENTS: COMMENTS: GeoSoils Inc. By: Page of FIELD TESTING REPORT CLIENT_ 411A 111sk TRACT SUPT. EQUIPMENT CONTRACTOR w.0. _ �Z DATE iZIZI (�{� NAME r HOURS c O LOCATION j e,n,,, /Q Test No. / Location_ c 3 Elev. or Deptn c3.3 Moisture Content % /o q Dry Density p.c.f. Relative Compaction Test Type S` Soil Type C Zi A f ue35 o CIt ew, o 0 e r. N 3 �7 —40/fd el Ll rim ^7 he P ,- COMMENTS: GeoSo" , c. By: Page o FORM 89/1 FIELD TESTING REPORT CLIENT 4114 w's fri TRACT SUPT. SACle- CONTRACTOR EQUIPMENT QP. ¢U� W. 0. DATE 17-13CII93 NAME LE I40y-rl HOURS AW .3 LOCATION Test No. Location Elev. or Depth Moisture Content % Dry Density p.c.f. % Relative Compaction Test Type Soil Type /e e '� 3 Z 99- 1 C- ew,c. COMMENTS: GeoSo-il�s, Inc. Ey: �l Page of cnou Yo/1 FIELD TESTING REPORT CLIENT A41A, W5 �Q TRACT W.O. cnoC(p'C3-?-c- DATE_j�I NAME �12 XA4 A . a HOURS & - 0 LOCATION Pw-r GvIG SUPT. 16 ClC CONTRACTOR fie;//eT a,Relative 1 Conten t 7 compaction WA _ • r l� f G �ifLl�_ � ♦ .� �= MON M-WRITAP �RffJffl 01M. � sl icJ'e ?/Aril "./ Y�Ac e m Pn o r- oL C-..„ . COMMENTS: gAlV,,v•rre( -$r6C1 0; (- CA beddrei at lPA�T 7' I - belo.. F owNsk �rou cA -' .trace. �X I?, ffAirCl w"CJcj I/J ,i%/ACL C'm,..17ACfni J��h v� Ctn,�%ei r-S.i so;LS i2e r J3 SfAndRI S I It -,-5 f See. A r ttni5 ! w. P / �%Ff �' Z IZ ec•p /c/r ..0 GeoSoils, Inc. By: of Page of FIELD TESTING REPORT CLIENTgW.-I � • SUPT. i,=lr,c- CONTRACTOR /; J EQUIPMENT LOCATI W. 0. DATE NAME HOURS 34 0 Test No. Location Elev. or Depth Moisture Content % Dry Density p.c.f. Relative Compaction Test Type Soil Type / rs B' 3 /v7Z-I >C- C // F C_�i Q r, �: C i i I _, r- �' �• v. j r (1,7, l gcl'r e v\ t r "A 0 Al 1 I J,} [K�l�iy7��Y�F`F GeeSeils, Inc. By: Page of W.O. (.0Z (a - R -p-c- FIELD TESTING REPORT DATE - -kms NAME %C-11geC( HOURS �,,, . O CLIENT ANA .vis�A TRACT LOCATIONTv- eCvlCA, SUPT. JACK I CONTRACTOR {gall n-4' EQUIPMENT Test No. Elev. Moisture or Content Location Depth Y, Dry Density p.c.f. Relative Compaction Test Type Soil Type 1z -V C s12A IIL- 5, 9z -C, - c O - r o/ ! o J Ik 14 L / 01A e4 ,2° 141,.l r L (3W -le- d - ca (C; 00 COMMENTS: Geos C. c. By: Page of ensu ee.. FIELD TESTING REPORT CLIENT At FA lIr�n¢A TRACT SUPT. TA lt<- CONTRACTOR 4 P , / j -e-f— EQUIPMENT w.0. 62( - 3 - fz c_ DATE /- 5 j NAME A,&( HOURS 2_L,, � LOCATION j Test No. A Location Elev. or Deptn Moisture Content % Dry Density Relative p.c.f. Compaction Test Type Soil Type 16 544e 1' 3 13 126. - S C- /&,j o f Pel.1 .41 t , Jla , Oar C%r �+ « ✓ for (.0 14 D.er eI ery z - aK A s'-7c,led COMMENTS: Ge Is, Inc. By: Page of W.O. Gzc- FIELD _ REPORT DATE, -!-33 /�iCHA.z/ HOURS — CLIENT/1NA 1/iS1A TRACT LOCATION'i2S°)(p �2emc7w SUPT. .l /4 rK CONTRACTOR IV,?/lel? SN6i rc: i L6� Test No. Location[[ Elev. or Deptn Moisture Content % Dry Density p.c.f. Relative Compaction Test Type Soil Type li len . fo; i v [ o !'vires1uef' ' suE�� e2eyrec 5�n e_ �n� Ze'e a -' s be&N It" r 3 t' c G✓ 1. ;n ,., S 4 ki S 6 S o e Co s e1r` ke- Z qAi V'/v t rk s I n 10 Gn24 e t lea OA C t6w .% nk 1 Z C K `• ,1 Cr ar Ve ..all Z:t-ct r• r .1 0. e✓r "o j,.L ',Oe - 3 'Tr ea d 3 rdrekj i. c e s• r1.1 Gaa� b we cue e ua n aF r c re e • COMMENTS: L :ti COL•? - L, Id ^ L,Id be inn0/P!H rl1 �Ycl %) So�ti iq5 )70 Srbl e e°nY;. FORM 99/1 GeoSoils, Inc. By: Page of FIELD TESTING REPORT CLIENT A I A (/j:s (r} TRACT SUPT EQUIPMENT ae„eu A CONTRACTOR H e, k\ tr LOCATION W.O. DATE NAME HOURS y - O Test No. Location Elev. or Depth Moisture Content % Dry Density p.c.f. % Relative Compaction Test Type Soil Type S/o f r3=2,Ce iZ•5 //Y.1 JZ -1 SC n sZ0 3 Ca- 13./ //rr-3 'i3-4 5( .0 02 3 Ca ;Z.co /;1-2 2-3 SG C - tOc C;vt If 5 eCPss At, I r l )� )AC -P a t /A' P� 7'` "o A c t9 r. =l r7 t -� L.✓ ' t - s r J . I V P!'f r B' COMMENTS: Geo s, c. Ey: Page of FIELD TESTING REPORT CLIENT /114 V151Af TRACT SUPT. J AC/G CONTRACTOR /i; r//t.r EQUIPMENT W.0.(n2u,- 8 -2.e - DATE 1 - jLga3 NAME ` /n�y ..,� c� HOURS -5.0 LOCATION lr/yI Pc/c� Teat No. Location Elev. or Deptn Moisture Content % Dry Density p.c.f. Relative Compaction Test Type Soil Type 3 Pig� ue r qLC % p i dr 4 IRS64VTSi fvc. T & 9o a r H ./ ery to/XC to- .4w G -H f" er C/ 6 / P ✓/ COMMENTS: GeoSoiInc. Ey: <�- 24 Page w.0. (-,76 ;n FIELD TESTING REPORT DATES NAME HOURS CLIENT 14 ///A TRACT���� LOCATION 7r-,y.re�� Soil Type SUPT. Jq C/< -'CONTRACTOR /3-0 111�c'/l« EQUIPMENT Test No. Elev. or Location Depth Moisture Content % Dry E Density Relative Test p.c.f. Compaction Type Soil Type a5 S/0 e -'d- 3 i3l ,o /3-0 /Z -3 y-0 L ON e s a o- ,�— M A f ey :o'A 0 rc Yir L c LC er COMMENTS: Goils Inc. Ey: l/ Page of FIELD TESTING REPORT CLIENT A 14 Y%5Lr4 TRACT SUPT. �1K1 e- <-- I CONTRACTOR Ale- //c/ - EQUIPMENT W.O. DATE 4 //- NAME 1�Ac- HOURS y-0 LOCATION % t�A" e -e- u 4 Test No. Location Elev. or Deptn Moisture Content % Dry Density p.c.f. % Relative Compaction Test Type Soil Type a C C- -� io �� 2 / `�S•6 Sc SL17 On S. p n c �0"kqfrr,0 &11A v e— c 1 Q T C &+,C %&,D o -c Ck I -- \ U CSS H o De e i e Q D t c� COMMENTS: GeoSoils, Inc. By: Page o C^0.. ao„ CLIENT A (k tnsiA TRACT W.O.�nZb REPORT DA"TE�,-iz-g3 NAM %CIS W, -A HOURS LOCATION `eyv eavlq SUPT. JAeic CONTRACTOR e;\l e,( C'ay.S` EQUIPMENT L e� a 9 C A C r\ce CoU4ry- 3dZdJ-/ l'ADriGe COb.rT COMMENTS: 20SJ'&AJ (�eT�ro� F Ci reu.. // reyr✓' 5Aevlel be /rn0%erK&A4 Geo nc. By: Page of FORM .80/1 - - Moisture ii Dry % OF- Content Density Relative Location % P.C.f. Compaction .. 4 r _4i .t lig W. WA .4"IR1� JJ :� ♦' 1 - � r r � W® _® •t• ow."W". wile W. Imp - ME Nw.90MNOR I _ rum '' +. �._/d �.•• ��� COMMENTS: 20SJ'&AJ (�eT�ro� F Ci reu.. // reyr✓' 5Aevlel be /rn0%erK&A4 Geo nc. By: Page of FORM .80/1 FIELD TESTING REPORT CLIENT AiIA TRACT LOCATION W. 0. (PZ& -'P, -�- DATE (— i L. 93 NAME HOURS SUPT. - wCJC- CONTRACTOR 11 >,T Cyn�S�✓ x' ( c EQUIPMENT z-7 3ozz-z Cw+2•. e -e Test No. Location Elev. or Depth Moisture Content % Dry Density p.c.f. Relative Compaction Test Type Soil Type Orv .0 B ✓ O Sud, a.T 31e e eCM iS - Y F k, IL locv r - OtJ� d Z AIV nJi2_P Fenbedtl !' en/ pn e •; > e ik'..w• r,n4olly P r � Z i 8 ✓ a �/ d e - /Y i ren u( oils -e vrr/ P COMMENTS: sl�� PB.a„I� Fi7 r Srt,✓ �sr 1i n / F 1G me w� ocr <J 5'L�a*vie( IL.J Q ( VVl I ld Nn PNf PL� S J� LPA%li...d VA/V& LQ bvt,e C'o�r `i Ti✓C><rfi FORM 88/1 GeoSoils, Inc. By: l Page of 13 FIELD TESTING REPORT w.o. ( - \ C DATES NAME HOURS Z . O CLIENT ,q/fa I�)5 7fi TRACT LOCATIO�r—j (f �eevl� SUPT. �{QL°lC_ CONTRACTOR 2 n/Uj�/ J CIC Ulm EQUIPMENT 3= 3eYNCL, ® ,• , 'olm MIMI— �' � � cacti � �_..f / -!��tl �i � i� _ moi-=`•1J� .., ' W ' �FME0 COMMENTS: GeoSoii33�t�. By: h Page of W. 0. _. LC. r FIELD TESTING REPORT DATE ZZ . - NAME r1-yi ;;i CLIENT a/ f; k 11i Im TRACT r� 3 (, "� SUPT. .;Act: CONTRACTOR EQUIPMENT 7 /3 LOCATION HOURS Test No. Location Elev. or Depth Moisture Content % Dry Density p.c.f. Relative Compaction Test Type Soil I Type leAl /v,- 307 Z /( "('C A- le, be" C•o C t'Y O .� jz !41 el G✓J l.� t7 ✓'PA <9� ,CK. �+ VAi V 7- .`J 1,l /(..' !/V/ ir.- to -14 I "6& r{, '/C!1' :� e!' •;� � ( Iia c ;-�,t o 'z� Du a— Ev i 2 5/ _Q ,iC. ;/ zF - �, o S- ✓ r„Y� COMMENTS: GeoSoils, Ipe. By: Page 0f FIELD TESTING REPORT CLIENT �7! j�i� , ;�j 1jQ TRACT W. 0. -2 -Z — DATE NAME HOURS 3.S LOCATION e1v�eCylCa SUPT. :7-4 C!14�— 1 CONTRACTOR 4�1 // t r CO�'IL� EQUIPMENT Test No. Location Elev. or Deptn Moisture Content % Dry Density p.c.f. % Relative Compaction Test Type Soil Type io e /y z I ►Z-- c Z /Z -Cc- 11b -Z ��\_ SL l ZZ -Z 91/,-7 SC- lu L iev. e e 6 e o! 2� o A e- e �\ COMMENTS: GeoSoils, i ay Page of FIELD TESTING REPORT w.0._j�2.y DATE_ Irl— NAME_L? iC-j Arcl HOURS CLIENT Alb; 051z1 TRACT LOCATION j Y vv` ef-,ll4 SUPT. J AC C- CONTRACTOR EQUIPMENT L,:f Z1 3o zZ2 Cap,-,ce CoyrT COMMENTS: u �� nl e w e i..D Q` saoni AS ok4 � Geo Inc. Ey: - Page FORM 89/1 Moisture Contentor 1 _ nsity .• Will m �. • u�Yl.Li�Ias�ll�__'i .IIIINI��� . L_ IM ` ; COMMENTS: u �� nl e w e i..D Q` saoni AS ok4 � Geo Inc. Ey: - Page FORM 89/1 W.O. -8-Rc- FIELD TESTING REPORT DATE, -,Ll -L NAME f` �7 iC-gAJc1 HOURS CLIENT Alfa Vi5I-y1 TRACT LOCATION_ j-rV,,,rf-,i1Q SUPT. ZAC4e— CONTRACTOR Z.4/ Z7 3o 222 CA?r%C2 CourT- _Content % Relative Compaction Test Type �I iu rMIIIIIIIII�_� ��J717�. •.: a r_ W -1,1111W ME 9M. COMMENTS: GeoAeUs. Inc. By: Page FORM 99/1 e FIELD TESTING REPORT CLIENT } .I+A 0 115 A:::: TRACT W.0. L13 , DATE ����� t^� NAME HOURS -7"0 LOCATION` 7'*--\ ,. e c x _ c SUPT. TALC CONTRACTOR A2kgd&;:Uz EQUIPMENT -�Ye � L1 e r - COMMENTS: rs�D,� f C. sy :\\ Page Location�� Dry �- 7 Compaction mo • V - 7 �A .# mI R.. _ 1 '[Tii�1'.� mZI�%7qq__ �� • • �IMWI 3 _ M-0 3 1 ��-�IMMI__ COMMENTS: rs�D,� f C. sy :\\ Page FIELD TESTING REPORT CLIENT Aj(tj V/S!M TRACT SUPT. J r9 Cr-- CONTRACTOR 14 e—; \t. it, EQUIPMENT W.O. CZco-3—ZL DATE .1 Z , NAME icµ µ.� HOURS___3 LOCATION T� Test No. Location Elev. or Depth Moisture Content % Dry Density p.c.f. % Relative Compaction Test Type Soil Type 11.1 l 1.1 1 �- It) � t'C� OG � E 1 r I1[' v- J C G �"- � 5- f-!i'ti w � nc� i —�/A ICC e- Fv. COMMENTS: GeoSpils, Inc. By: Page FIELD TESTING REPORT CLIENT b {Gi �/ISff3 SUPT._ TALx W. O. . 7,& — :!; DATE -%-fir -Q�j NAME (K ICS 4,,41 HOURS TRACT LOCATION j -e CONTRACTOR T i I I e_.r- EQUIPMENT (' 0 VSA D I e- i± uvA 30z.04 C v>��;� CI_ n� V-" 6/ COMMENTS: f SAS, t.Ai"/ i 9 •'3 Lj' GeoSaW,, Inc. ,,.y. I •nom..Jl ,k. .. By: Page of Elev. Moisture Dry Test or Content Density Relative Test Soil No. Location Deptn % p.c.f. Compaction Type Type :onik -ter I urhih, w� �•� la• '{ri �iIQ'LN ` ePi tPr ..nu .:jrJ Ce ler nn, . w.0 � Ise w :G! iJ COMMENTS: f SAS, t.Ai"/ i 9 •'3 Lj' GeoSaW,, Inc. ,,.y. I •nom..Jl ,k. .. By: Page of FIELD TESTING CLIENT A l�^ V i s ,µ TRACT w.0. 6 LF %z - iZ REPORT DATE Ll�gl ���f NAME F •cNn HOURS G -y LOCATION SUPT. 3 A CiL CONTRACTOR K C -i11 - EQUIPMENT Test No. Location Elev. or Deptn Moisture Content % Dry Density p.c.f. Relative Compaction Test Type Soil Type OhJ I2 t . I I a-lJ f r COMMENTS: Ge i1s, I C. y By: - Page of- FIELD TESTING REPORT CLIENT 411,1 ;/IS14 TRACT w.o._6zt,- r3 -4e DATE_ lnZp - c/ NAME K / C ,-/,lJ� HOURS LOCATION % PMPCti jr� SUPT. Z4cI<, CONTRACTOR Afie- Ile J' EQUIPMENT /oOT, Z Test No. Location Elev. Moisture Dry or Content Density Depth % p.c.f. Relative Compaction Test Type Soil Type $k' rZ-q 1`I o 92. -V 1i3 s a /L -o 4WOi 1-5 Sr �ia9!;�i+ A 4 fe-q3f- CV CK e7e Lo-(00,v'e— e L; e Pnf C'6sc-siromek 0,rooe-j-e ' ; :l/ j2 7 COMMENTS: GeoSoils, Inc. By: ZR Page of FIELD TESTING REPORT CLIENT Ia/fA V/ 5%4 TRACT W -O- Gzc,-3--.z(7 DATE tL, / - Zj NAME HOURS 2--0 LOCATION'S L i,,.. P p_,_, t q SUPT._ JACCL CONTRACTOR EQUIPMENT COMMENTS: t isQ�S� Ti sy: C> Page of •Density , r1l�Jii�•�__ COMMENTS: t isQ�S� Ti sy: C> Page of FIELD TESTING REPORT CLIENT Alto 117slA TRACT SUPT. Tq CONTRACTOR 9, e/!ri- EQUIPMENT w.0. 6z(;, -8 izL DATE_Z:: NAME HOURS LOCATION 'TtrnFc✓% COMMENTS: GeoSoils, Inc. By: --.. Page of _�s'i/Y yM it -iG//la��L33iiQ _EN 540 COMMENTS: GeoSoils, Inc. By: --.. Page of FIELD TESTING REPORT W.O. r.jG t3-2 C_ DATE_ l -z5- -q `/ NAME Z G/iq�Q HOURS Z 10 CLIENT 4 j11A I/�SfA TRACT LOCATION SUPT. V�1e-(e— CONTRACTOR Mi c//e✓ EQUIPMENT Test No. Elev. Moisture or Content Location Deptn % Dry Density p.c.f. % Relative Test Compaction I Type Soil Type o og $'L / /7.3 / Z,3 -9 qz.o 5 L B y 8 Me/ 13 0 —b 16elo foDer t %� C°A e G4, c -v m7 A ; 6 r CK�hi31�l�M�`ll GeoSoils, Inc. By: Paee of FIELD TESTING REPORT DATE �7 NAME KiCHAr- 1k HOURS 3-0 CLIENT_A/f/a Elev. Moisture or Content Location Deptn % J/�Siii TRACT LOCATION T �w�•r_c lG Test Type Soil Type SUPT. S/s r.� S Z -_ j qC CONTRACTOR EQUIPMENT Teat No. Elev. Moisture or Content Location Deptn % Dry Density p.C.f. % Relative Compaction Test Type Soil Type OV 7 S/s r.� S Z -_ LJ -1c J 13 e. IO L 61 O v O l A uc WNL IN V4- e , %Inu LCq Iq ce L'o 1 L, ` 1 L ✓ p.. i \.` \ \ �.�. COMMENTS: GeoSoiis, Inc. By: Page of W.O. 4n, j3 lzc FIELD TESTING REPORT DATE_,-zs-�y NAMEE2i Gh/eq✓tP 1 HOURS 5 _ p CLIENT Alfa V(S7�/+ TRACT LOCATION_EL SUPT. .lAc (- CONTRACTOR EQUIPMENT Test No. Location Elev. or Depth Moisture Content % Dry Density p.c.f. Relative Compaction Test Type Soil Type 3 e-/ 120 7 9Y- 5 c �-Z of /ZZ -O V3,1 54C 5O A=-`� /Z 1,7-L S a esv "e e- 574 r 5 v a icA << 2 A v -e_ V e h n1 QC: ; / v,r Z o / COMMENTS: GeoSofls, IC. By: By: Page of FIELD TESTING REPORT W. 0. DATE NAME y HOURS .� CLIENT_ F` 114, \/, s /, i TRACT LOCATION "' • ' ' '" SUPT „ C. CONTRACTOR EQUIPMENT CnnnDI&fitV" 'I z 14C Q r� r7 l c C- /e0 cxt Test No. y, Location Elev. Moisture Dry or Content Density Deptn % p.c.f. % Relative Test Compaction Type Soil Type P 10 , t.,^ alj �rtft J %7') I 1 U J Ahl� P ��"" 41 a. -J, C1 '' O%► ivO / OP ' ti Peen;I r y6 LkP r - & 't M t, s- e to 1/M1� r P f -A A AP tee ; �`� 1 •I Y•i ey�0 ti o4 iw N I • r I ;21 LOA /I 09 �(_Q r Imo • N � t t COMMENTS: GeoSoi is By: Page of FIELD TESTING REPORT CLIENT A11-4 —V, -SIA TRACT SUPT. TAC« CONTRACTOR /-/i P//rr EQUIPMENT W.0. 60,& –B–,QC DATE � - 9 % NAMEt4,q HOURS Z.O LOCATION j ,emNc%,AIc3 ® 'RelativeCompaction ram ! .Z _M COMMENTS: GeoSafis Inc. By: Page of FIELD TESTING REPORT �a.O. 61?6 -S -JC_ DATE 7-1 - y y NAME !GdA;eckl HOURS < CLIENT_ 1tA TRACT LOCATION j--;we-r;✓jCt SUPT. CONTRACTOR EQUIPMENT Test No. Location Elev. or Depth Moisture Content % Dry Density Relative p.c.f. Compaction Test Type Soil Type sz ye �g� -� -s /Z Ss i 1Z- sc �$ B"� Z- y / L-7 i c a r fin,. i �4 i OTS U —C�ic� S i^ iC157 i I COMMENTS: Soils, Jnc. Byc , Page FIELD TESTING REPORT CLIENT li , 1.1 !V01,1 TRACT DATE Z- j - a y NAME /L ,e114yu' HOURS LOCATION r//�• r/rfoj SUPT. �j/4c/L CONTRACTOR /1 er ler- EQUIPMENT -,U ! 41-:7 S�0 5— v e //V 4.:) ,z , 7 Test No. Location Elev. or Deptn Moisture Dry Content Density % p.c.f. Relative Compaction Test Type Soil Type t (O firtC'.ri/ v:,e(oc• E+ssY��� rJr GaeA,r q , ^-yPIC'e O ..vsn� .$/0 2 r•y ,'•f _ r �1J �, ...,. avc�fr�ei/'A je el�cl U Pr If/ C, �o C/ c oCJ / 1,C1 r / !Q 6 a ::, aCi t 4, .Na ow t / �r4 r t� 1 '.p1.51f 7 "'m r C CO?fMENTS : GeoSnils,,I c. By. I — Page of FIELD TESTING REPORT CLIENT J/fPI I//SIKA TRACT w.o.i ZG i> -2e- DATE Z-2 cJ NAME HOURS �- LOCATIO\' SUPT. jf Ph Dry Density Relative p.c.f. Compaction CONTRACTOR rjfr/ AC c� EQUIPMENT �ZsO ;- AN')e n �/"qcc Test No. Elev. Moisture or Content Location Depth % Dry Density Relative p.c.f. Compaction Test Type Soil Type AC c� 3' 5 si ' v -P C • 4 j . Z� brd SCve f r Yi n4 4t S evTre.d L2 IX,4 L+1 O > T— /A, &rZala , Do ,,. rte. ' o - e•c o e S LCO) a '�' ' r% // •� P ��S P to e- e - 'P_ . J l O % ' c•I -J l G i�. ''� L. 12,2 1 C1 COMMENTS: (071 C'e,,- i- n � rL •ate �,: � 0 [✓ i-1„ � � t ,,. ,ci r i � t p E L I VL, I, _ ��1�qe L(' 1. a GeoSoi ls, Inc. f sy: Page of C/,G,l all FIELD TESTING REPORT CLIENT A1TA Vt5�d TRACT W.O. 60c'-3-pc- DATE zc'-i3-pc DATE Z�Z��`j NAME j:/CAA,1-: HOURS LOCATION SUPT. SA C!L CONTRACTOR ?W—f e//� r EQUIPMENT s /a to e -go-- 8 Test No. Location Elev. or Depth Moisture Content % Dry Density P.c.f. Relative Compaction Test Type Soil Type Sv .si e4 L- iz- /ZZ.7 `?3- ss- 43 - s� i r5� 45 rAcor t c• Se S i` P dui l3vrcl.. o e erg COMMENTS: ils, Inc. By: �— Page of FIELD TESTING REPORT w.0. 6Z/G -'5 mac, DATE Z -3-q4 NAME_2, tAt,A:,A HOURS y- p CLIENT A lffi V/S {A TRACT LOCATION SUPT..4 G/< CONTRACTOR (z EQUIPMENT Test No. Elev. Moisture or Content Location Deptn % Dry Density p.c.f. Relative Compaction Test Type Soil Type clu de T cJAie- rv-e- FP37qnd Cm 5 ir✓ C LChA f L, 1 HT ee5 � SI (v `JS e V e 5 K C1 e (5 ee- t, COMMENTS: Geo`Soils, Inc. By: \� - Page of FIELD TESTING REPORT CLIENT A 1414 Vfl 5/,+ TRACT SUPT. J W CLC- CONTRACTOR j-} L et i j r, EQUIPMENT ':. 0. 6Z6 -,3 DATE �7AME :OURS Z LOCATION i cf i" . (., icj Test No. Location Elev. Moisture or Content Depth % Dry Density p.c.f. Relative Compaction Test Type Soil Type T ; ut c r r 0- e �v LAJ e'_S Ll�' rrAtc' rc Vee- fA .� P^ 1 r7' uu (,cJct� ks 33 (: ! I COMMENTS: GeoSoils, Inc. sy\� Page _42=tL—�- FIELD TESTING REPORT CLIENT A I fm V1.4,4 TRACT SUPT. S Q CSL CONTRACTOR ?.o. GZG , -/?C- DATE Z - -f"!- -Qy NAME ��CC.ar� HOURS/.v LOCATION j Ll. r(,y(Q Test No. Location Elev. or Depth Moisture Content % Dry Density p.c.f. Relative Compaction Test Type Soil Type 5-4' .5/0 * I 13_ Z /,/-Y 92 0 g (� r� 67 cw 'L A4 .0 to 42 COMMENTS: I ic. By: Page FIELD TESTING REPORT CLIENT A l �A VIS S T A TRACT LOCATION LOCATION SUPT. aACx- CONTRACTOR kAI>=jV Y 6r EQUIPMENT w.o. ro2(c-a..•�ZL DATE _::Z- NAME Z NAME HOURS 7— Test No. Location Elev. or DJeptn Moisture Content % Dry Density Relative p.c.f. Compaction Test Type Soil Type C" L / 6 N S ,I:M 9-- V N ter(` C,9 e w" _ C v w (AU3 criAkv.0 v:c 'fAbi�5l1 � a � �vc•�et` .moi/ e� c' rcA r4 C e , efor ✓ o 04; e 5 f 14/01 tsL . A k.- 6 ennKe 11) e S4=9 COMMENTS: GiqSo- S, By: 7 Page of FIELD TESTING REPORT CLIENT _ A I fa V/SfR TRACT SUPT. :TAC.lL CONTRACTOR Ni eit �r EQUIPMENT LOCATION a.0. 491�-3-Z-L DATE Z-//-`jy NAME 2 xcA-Ar � HOURS `(-o Test No. Location Elev. Moisture or Content Deptn i Dry Density p.c.f. Relative Compaction Test Type Soil Type -Va19' 12-3 17-7 -0 C? ' -a Sc- 13 51a f! W9 3— /3"0 /Z3 `; -0 5t- I"7 5/0 ev` /0 s/o r /o -S 1Ig-9 C�Z-G Ste- O 5/o e -`/ /o- ,Z 13 -c? 5c- X- B k' c C CS -r 9 2 2 _C _ I.�c e e 1 �`P, li we Q,0 E _ � a' -✓.i w COMMENTS: GeoSoils, Inc. By: Page of FIELD TESTING REPORT CLIENT /i/)i4 Ej51.4 TRACT W.0. 6Z6 -R-R-L' DATE Z-� NAME j- C & eCY HOURS -'/- LOCATION SUPT. SACK CONTRACTOR EQUIPMENT Test No. Location Elev. or Depth Moisture Content % Dry Density p.c.f. Relative Compaction Test Type Soil Type Cz �Slo Q z 3-1 lis- s- 9z-? c l Z( -lo -I 3C /e 0&57 a eelCCU- - CA-,' e 9Z96, �-/,,, p b w COMMENTS: GeoSoils, Irc. Ey: Page of cnou eni. FIELD TESTING REPORT CLIENT A(i-A Vts�A TRACT SUPT. JJAcr- EQUIPMENT W.0.CIZ :1 $ —2C DATE NAME �lClnri•^c� HOURS LOCATION T'-4•,rwj@ CONTRACTOR l -A I eI t -e4— ® ®Moisture • % , $- ' ~-N _FIRM ml-, VAPM. �W_ COMMENTS: Geg90ils, Inc. Page of FORM RG11 FIELD TESTING REPORT W.O. DATE '-Z -/y- • q y NAME /< it/%4 • :./ HOURS CLIENT 1411A \115/A TRACT O3(b ~ I LOCATION ir,�rc ltd SUPT EQUIPMENT CONTRACTOR 10010 C-CVAKOE- Test No. ev. Moisture r Content Location % jDeptn Dry Density p.c.f. Relative Test Compaction Type Soil Type ref to IV*1 LS �07t s � E //e, A/ A/ - Y f -,-,A / E Z is ATr(`t34 IC n T- r. V r .L 1 - Q 2 r 14 19C cP C / - S -e S 1 COMMENTS: /a 12t�ya,Tiro05etl JIe 2 rr n,1 it LC'('Alet(' S • 1.1egj, 01 `i e ( ,' I PW � %A S (1 n {-r.CQ �n . (•P - r6'fd(�I i S �. i v f) nz S l u P� f.'3 rc+ C".y. l Aelr•I IA<'lnai/ l �"- bout c'!1 n+1•./ (i `' eneu en,r GeoIn • . By: Page o FIELD TESTING REPORT CLIENT Al t,i V/sus TRACT SUPT. Z-AC.II-'- CONTRACTOR (i;II�.J EQUIPMENT W.O. DATE Z -/!o - Y 4 NAME Z.tL .,.- _ HOURS �-i -O LOCATION Te e Test No. Location Elev. Moisture or Content Depth % Dry Density p.c.f. % Relative Compaction Test Type Soil Type S o eµ Z 13 —`I12zSo - 1 06 r ,Q 1- o v.., iv. Ya e • 92% . COMMENTS: Gea�Sm�s,�It By. Page FIELD TESTING REPORT CLIENT AV l Vi5�n TRACT SUPT. CONTRACTOR a, eil e. EQUIPMENT w.0. 6-z6 3-tz P -- DATE -L NAME L l KA HOURS /'0 LOCATION i p V-er i a, Test No. Elev. or Location Deptn Moisture Content % Dry Density p.c.f. Relative Compaction Test I Type Soil Type 2 k�aw., , ICIM Ic� o •, (f a I I - C-1472,'< o /.(27,�UC0 ;r,-z;GE Com- (11 i2, s H ieiI�, rI . +e (2 \ _ s 5 i- 11,R C c S E CovLSiVv��'i COMMENTS: GeoSoils, Inc. Ey: Page of FIELD FIELD TESTING REPORT W. 0. 6 Zc - ; —Z. (,— DATE Z /7 -i NAME :L HOURS CLIENT P.` iC TRACT LOCATION SUPT. JAC.1e-- CONTRACTOR R,r-o , EQUIPMENT Test No. - Location Elev. or Deptn Moisture Content % Dry Density p.c.f. Relative Compaction Test Type Soil Type flq Co A CX, 31c E. � n �. e✓ bSr: r UN.Su, 013� ,Is ` COMMENTS : GeoSoils, Inc. By: Page FIELD TESTING REPORT CLIENT AIL, h5L; TRACT SUPT. J ,q C �-- CONTRACTOR EQUIPMENT W.O. 624o -R -rZL DATE 2,3/1111 NAME I va.-r HOURS `f LOCATION r, 7-c., _j G Test No. Location Elev. or Deptn Moisture Dry Content Density % p.c.f. Relative Compaction Test Type Soil Type .ci t Z - 19 - G OF- z -C- .,a L Z) a i e_. z - / i. c S C- L q C GOA cJ' COMMENTS: GeoSo, iills„ilnc. By: Page �t FIELD TESTING REPORT DATE E_� Z -�7 CLIENT NAME ,ct SUPT. TRACT HOURS — Z , . �--� < LOCATION Tc CONTRACTOR EQUIPMENT C•'n� r , Test Elev. Moisture No. Location or Content Dry Depth Density Relat %e o e Z P•c.f. Compaction Test Soil Type Type a 7 r3 Z d ,L) /3c � I 93-.N v �Al A,.,! n`. Es: GeoSoils, Inc. FIELD TESTING REPORT CLIENT ` —�'�' " -/L( T SUPT EQUIPMENT CONTRACTOR I LOCATI V w.0. Imo, '�7Ci DATE Jif NAME HOURS ® ®® •• ►Relative ►Compaction Test Type Soil T _---__ COMMENTS: FORM 89/1 GeoSoils, Inc. By: /I .i: Page of / 5Fr I�+v�,. '��Q`' ,• �.rrr �'7� 'd, "J 1'..yf r,: r j i::x 1 k yr,C' i, ,ty�,tyLlrWF'�#, (Fs de trr rrx re"�' i til ^i L. ia� S �'tega i:. sl< ii rr' h t t�Nm.,,�A Zs yTa T 71 1'••,q v RIVIE 1 yt j6691 LILLJBRIDGE�Cw.., KAY " OLESM POM DOW' January 8,- 1979 .T Hogan 6 Roy Associates 1027 N. Coast Highway Suite F .. Laguna Beach CA 92651 PATRICIA NEMETH - A.I.P. - PL. ANNING DIRECTOR - fffO LlMON 8l Rffi.ftF/IUOR, RIVIRY•bt: l'All/ORNIA NffI-' - Buena: Trac*t._y _1 6 0369-2 Landscaping and Irrigation Plans Gentlemen: fs . review with respect to the above refevenplans the Pld subject pto hecfollowi 8. s now complete. The plans are . approvedBe su te conditions: 1) All above grade irrigation lines shall be galvanized. This approval shall apply only, to the -.review required by the Planning Department. )) All applicable Courtv Ordinances and codes 9, be campliad with in the design and construction of the plans. A signed copy of your ,submitted plan.. is returned to you herewith. Should you have any questions please give us a call. -- Very truly yours, RIVERSIDE COUNTY PLANNING DEPARTMENT . Patricia Nemeth, AIP r Planning Director 5,. Conrad'Guzkoski, AIP — Senin- Planner " a.._ cc:.. .Building 6 Satety 1 sea - - - - - - - - - - - The above referenced map, having: been. approvedby;--the Bonrd of Supervisors will not require your signature.. itow"ever, yon may have conditions to comply irith before -this map may record. Please notify this 0fficewhen you.are satisfied the MapAS completed to your natfifaction. A copy of the.final map was submitted Lee O. Flint SKALLER; & LOHR' ASSOCIATES,: INC.. '* 868?SAN MIUUBI. I)81Y8 SUIT 811 N>fWPOSI HR�ON, 04 95860 ,ry '7r14.6f1.f899r, -- ' 'ti Y r �fepteisber�9 r 1977'• 4!k" Riverside -County' Planning Dep'artment treat, 9th Floor 4080 Lemon,S Riverside,,Californiai92501 William Pa3avick' fr' Attentiop tit r . ' r ' F 'Subject ,. Tract• 8.3694l, Tract <8369, 2I Tract 8.369 arf pear Mr.,Padavick: r' tints of the revised phur:ing map - Attached are seven (7) p for Tentative Tract 8369: '4" t Originally, a phasing plan was submitted and approved by your department withTracts 8369-1 and'8369-2 reversed from t:bat nieun ently_showron the attached map- are requesting that you approve'this new phasing plan ,. r;. wince the final map for what will now"Oe Tract 8369-1 is close to recordation,.`' k If you have any .,questions ortc�mments. please contact me. ;- -Very truly you ih YINC. SttALLEP &' LOHR ASSOCIAYr S, M1 ,000 i" nalcl ohr President Executive Vice ({71 DOi c3 } Att�chn}enbs 1 �, rf�R � '`ik } � J r, t ✓ ¢ r�^`�.erTd ', u :tom r RI��7Jrr PIAN � VI` t ( j -3 :n � lY r l`Y 4 :p1W�4 1 ,tt .. A 7�•' Y1. "SURvey'NG ; LAN .PIV .I Nl3tNFF.RiN(� COUNTY OF RIVERSIDE OFF161AL RECWTa 6586 . i/�.le, itownd MUMS eat le 4 i i i •^ikmoi rvoo JAL sees whom ST""T . JOHN W. 6/WANT *pllMOMt (111) �0►.wf► CN1W 10f01M1a a RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT 3 Ow11100L CAL1►011M1. 110"' 5 July 1977 1rJeRs1ne COON I"t MANNING COMM!'! tbJN Riverside county Planning Commission County Administrative center Riverside, California Re: Tract 8369-1 Gentlemen:. (Improvement Plans) roval for tentati�'e In accordance with the condittoY ou dated 19 August 1976, ions o app Tract 831,9 set forth in our letter the following plans have been submitted to the District for review: -- 9-1 1. Improvement Plans by ct Shaper & Lohr1Associates, 5 sheets prepared by; Inc., -dated 7 February 1977received by the District 30 March 1977•. 2. Grading Plan Tract pared y Shali4reet f&:LohreAssociates. e Doccmber 197E prepared by inc., received by the Distriet,3�,B:.March 1977. The District.has reviewed. the plan`b11101.1- ritted ant, finds them ect to flood to�itiol. satisfactory w>th..resp r,3 V. STONE ``'•'' j 1nx ' Smbdivisibn Engineer D cc Road ePt n yxSafety? Dept :,o��Buildi 9 5 Z _ Y.'i7f ;i i. L' "PI �u� rQ+rassior 'a 4080';l;Dtwn Street RiverelAe, CaliT0 is JOWAM7 3t 14R 0. RIveraide Coant7 Surveyor's Office; Riv"Videp Cali}breia y Subdi in!on Unit ^].*&rams lideion Ordinance No. 460, _ —._ ticn 5.18 of the BuLd (Subdivider'n Ueae) tua ).•+stinion e' ee to D=tp�P or 7 ons Unit of approved PentnLi:. :Yrurt ae indleated IntrAd:on:the attached tentwt.ive mno. truly yours, RjyBlsyUE 'C� )JAI NIM; Ct)R41;59I071 w ;4,t,''(,. A.�E.:]ievcpteb - plannlnit:Plr'ctor e I t C Josep A w ! 1 � r s � r F 'UNIT OF_�, 6urveyor.'e` Cff1C• eeL -. Resl*h Dept psggt.',ot' Fire protection >FLood Control E... E'leon S .,¢ Coa},'(2*rNr ? 'So, Ca11f t. t Y 4 } u ! 4 1Rd:eb I t C Josep A 1 dards • .ac AT' } s � r F SHALLER 8c LOHR ASSOCIATES, INC. t Nxwpowr BEACB, CA- 92600 860 SAN MIGuIM DRIVE a SUM 8U * 714.644-4808, December 29, 1976 County Of Riverside RECERED ,e BOX logo Post Office Riverside, CA 92502 JAN 3 1977 11 Attention: Elfron swigart, RIVERSIDE GOUNW PLANNING CO"SSM Subject' Tentative I.;ract NO- 13369: Dear MS. Swig&rt* . .1 —'. ..MOunt of $100.00 and Attached are two checks . one n he the amount of $4 oo, which ,we a inadvertently omitted one in U for issuance of Tract from our transmittal Of this morning, Numbers 8369-1, 83691-2, and 8369. Very truly yours, /SRALLERLOHR ASSOCl INC. L. Hugh. iter PrCject Manager i OCtATES INC. SHALLER & LQIIR AS: 92960 ae6 SAN M GuEL DRIVE 71MA6��. t: Vy .29 r^ 1976' j. )(3 Riverside County - Planning Department 4080 Lemon Street p.iveraide,.CA,92501,; Subject: Tentatitro%Tract''�1o• 8369' rr gentleman On behalf of our; client. Kaiser tna 6awe respectfully seg�` ,. that Tract Number`* be iaaued'tbr Trethe subject Tentative Map in three mits� ?tact No. 8369�1r' at No. 8369-1, and Tract No. 8369. Enclosed are seven (7) copies of the Subject Tentative Map, reduced to.a Scale of 1"•1001, for each of tof he three gratland units and two i1) checks00 e i the tlireetractnumbers- one in the. he amount of $ pe artment aIe have Previously cnicated with the Planning p rslative . to this matter re a nded inter datletter dated lDece7mber 6 , , . The Planning Department rasps 1976._ 1 t would,,like'o IY'at all possible: we obtain the Tract Numbers c, by at &]e p°11, ,1976:' please- cIall' If additional data or clarification is needed ' truly_yaurs, � ,Very ' 1tiS2 n_S�IS,� )I�TyTES, INC. ' r )ER gh S Pro3ect.Manager -`.f •' . - LHStC3`; Sncloeurea Neelsen k cc: Mr Gilbert O CIVIL LiNGINEERIN(i SIMVETINU LAND pLANNiNG i tcuU.TV 4 VT PL A N HiNG cou"ISSION ; IL^Y 5, cancs"00. %Ww M-4M1a. Jew 6, KAV 11.01.00x: Aad p"nows DCRECTOM September W, 19% eM.1041"W" "Mom r "let uw 5089=630 Board of supwrosse" Onety A&kt&Utt*CLVC Caotar 400 Laws 14%b Floor; River"", CA 92MI TMA" 90-1 8369 T.T� XAM SAMW utas OFM oinstass ftugaaa TM zoom AxqM - *WOW caLiftrala StggNMWMUL WATR=i First sun or sow"AM ad atte&ad am"SU"' a" , Li -W 11M abovw-rufs'"M Beim at Ila "SOLM WOZL" at ftptoow for approval bT 15" plawAns cooldl the C"UMAG llkV&=MWlWMt4 'fte SOP CMt her C*mwiiad With the 7MVM;Aw of amity Act of 1970 MA. so. 1. No vim tooloAtout With &be u1slowts plalm"s caefflasion Iowa C1,; CAvmty Gyral JIM' be most (of publAA bearucs at 10200 49-01- 611� luo 104, 2ble usttOr "'Ot the Board meet 4wrve". embditiAnauy sn"w"m pvtowbar 2xt 197C cc vkickL ti-LIL, extended by MLMl ons to tcatoo4va 1AMP, Majoea the ttgo Llqdt tS or 418MV99" the mod Board. of t3a S'AdAv'"r. stue"ced, A■ jecwl" D to RaeJCw%=mm ac; superoto Applf Its state Liar b: gfety'.t2 uV b I , , :.4R sfl • x i suD(t�47e6.� 1atn±m�rxc� �. 39� TRACT W. 8369 the require+ y' " �7'tli.:stO�e bbu, gchr�u,l. the LentativB mtbd?vlai.on @hull confora to' . eadlSie4 by thAFr: ccmcitione. tmlese the fntodiaider siml.l subs me :!•pr!sGr+cL b'i.e or. if y grading i6 prc'pcded, 1. m • to the rti mrelda i!vlwty 9nrTcY*r°" irts of R Ccau�e+ s.cc er �.de Caapte:^ ru, ss @,eroded four pr •�, -r_th the Utllfoia R ld ' Cant'Y'! the 7 t wpali assply to thr Flood ra eul'vr cv Gfflca sAwll.. i;'r' ap9mPnL Ordummee 057. The ^ . •pArt,.tent e. gnllding A. r Dlettlttt and the s� Su:m-i R ncil@ �pprt:�t tb<-tilceteide t:O1M°.'� !3,IT7'ryClr Phe 1 M:3f6e8 J,. .{1.•. ,71.xeT ahA}� Q• -ghB e7b�i: d eafst x/1Te1-'Wr, The ^fp`.•�. pvtlding an .., i016fis veived by the pf',tbs p,t^.. stability and t1w provide Issemnts for Tcydv»v ali�pec. :r' -mks^ '"`ri.lxtirr. by ice '.'oa�l r' The subdiatder sbal' 3. to shall be dledim.•.ted m M^t.'o'C�• eucl QR@;!tbQ utilitles r ate - c'^ i 'c ee appr etnll Be sub.lect t�iiw y, Strive Dome formP COMINSIoaer. j .ball be i^tt�lel It �c`vtertCr NLt` x*1'facititiee Yater and w@aRa di �� . 8@elth lJ!5;•(QIdB" ilttdT 'lad' '� 5' CgaaeY 4 11cm got forth to the Rive r�ido 19f�r a Copy of vhf ch is etcln@ed.. - h ttn Lccal '3rrcY c •t t.•, E¢ei@ed :throuB rt: er i 6. An appl.xcatine B`+dl . ee o foi `ar�miirh r„n nn brie c!.r.6 i n :en7 oer CCnmtp gena^r 4'an c_ 1; tt r t lighting i+ to be i vt-�. bed tti ;:vytxliel oc ISp�po q"m etaftot i •, ;,ting PJv et r' t tr• {'. ntc : i use.. - is or will be-dei:l::atad .c ps:'.'� 1n@talLet:!+:t of 7G391 dn:, fix' J•.... CrnmtS !iowd I)wyeri neOt. ptlfr t0 shal.}; prcil�le, t5@ ?ollet.'.uB sett �,..T�..'r sul,dlxider 'llicaral.de ^Aunt` goe<i 1,qa^ ..: .. vita: )(�{ i ! �' 4A pl p', ;. COCa`•yitC } t- - to < } a. Bents Cecel_a..lkSce th@ is , 8-66 foos d<:--' died right, o.” vev• CoaCrete curb and gutter v.t4n 'atTeetee '^Sr.yroced u b... Cul de -sac ana11 to t tl �1 �+ vs,", -1t atr a SG' `+• . s ounc ete cuab.and 6v t.3 r �tt^rcr I:': we' tte I^., r• 1 4,.:ir�-'+v� All'Cthe�: viStE anc� er ;-Scott - c �.+..-�q?tvs.•-y.�. .>...e�y r t ':',f'` a "T - p y . f .. ... '9tc -: 1. :Banc' r 1 4c3y 'S width deil'.ca gi 4 r�va Ls s 81911 f/+ ' t'. t B Aq Re '=T'1t 1 r,; n 15i t�OG --d' . .-. - .n:.. sFPr 1�r1 -f1`.N ,� •� . or 0 nasaaeo. •-------- • ?OJZZ a pottiaa of Slotiks 16 6 IA Of thaphe 1 6 ana 8369, ds lator on. 8obdivision b� bme eboao b7 aaP on file in s- ep 11, p ot,8® Dipsaat7..gtate of Caiiforml#i 7f9 Lets. qmt of ftblie lMath hes rsdaved Taat&CJVa ite-.8369LCM4 i5a p r+e ting to Plano sad epsoifi- a wear a7sto9 ahsll be Installed the Saoltb Depaztmmt. Dations m apPra"°ed b! the Amt eaapany tna aha31 I.R evDnitted pat�tat prints of [fir p)-sna of the water s7b. , orx+ inch ogaaL in triplicate, With a a3nfseea scale not ).sea them Sbe :•: 200 foot. alone �•itb tbo o,.-1Qi.aa1 drpiag, to the tioato goalveip . yriota sball smow tbs intoznal PSPe diamatar, loowtloa et of tba �_ te: T!Po ffi'9 30 int apecifitatieas end t' alms of pLsea 'T;nra �� otes to the oeieting at tba joaatio.-. of Vw a►N ay C tar 7 0. Lha shall eoaply In ell raapaata Wish Div. 5. Part lrmt!v+ Cade. Callforots gaeltb a-.d safnt7 rbde;'Callfornia Ad: Titfa 17. Chspler i. and go"Tc1 Order We-o- ap of fibs . Th OLSliteh p�soiaaiea of On Stsie of Csll.fa:nia. UbeaPPl7cahla. TM Pa:' eba11 a ragiateeea eo'„!nuer and anter a�,on;+ Wit! !bs :In Tract c�arditi�� "I mrrif7 that Che diem of film %wcar e±stew in tract Be. 8769 is !n ateer&mca r.•ilL tfx water a�ntom e�S+sesion pL�e of tM r Same Ronabv Calitoraia Wniar DL�tr!ci sal that ibex Eivereldo aC'Mmt'y s� t~ 'die myat� cru Rdagvato to cxgp 9 _ OSdinauee` V-469." Th!-1 Co!iiff_exta, *hall Yiane��mntbeauvMrittt4 of the p=aler ton4i i + . ?r ?tba Covnty 9�eyot'atJffic:: to.revthe fi AVm cne aeeka 7r1oL he,ragaaat for t?:a tarn=rotStw of Lhe-linal;"mP- wt. otr+a SRrar UL+tt a fRf. tdia paPc=trrvtt�bsA a stafiexant from tba.Q"*�ahe ��auhdivief.00 en easaad pros!diep,: aaaga prttic astnr_t� naah mcg aFnrl'�lona the �- .. tial us r..y¢.efI" are wwPlmtad, with ibe rddlvr3ot. It will ba 4' :=-► ?' ?.a �prlCr. to the 'racer of Y.. f0!'-t fS'u+C�iri G _Sn(�C nia;'W `hn _ 3,. _ the final ti'm .M t3aaain[. ;;naabaaton frost Ne. 8969' !later aiatrict awTw=a8 This 4tat4 s £ e Oarx at to the swats of 'the 6lesiiat. rM Parer totem otmeeasll be lartellsa eeeoMiopt end the naalth�if t' eatiosa ea apptoaed by the dintrfct, the County SetoayoS' t Pilate o[ the Place of the nater ayat. sball be stimitted !a triplicate. with the eriwiaal dwolog. to tbO Cowty 9or°a'" p ,Pilots ■ha11 oho+ the fntarsal P diameters location of meobolsa• aamFlate ptatilas. Sipa and ifiwtiodiaax, and the air+ e! thn esvrre at tho jmatlnn of t1» rse V" �nS ryrtem. A aiawlo Piet fndiaatinw lotetfoa of eaeat linos sad •rotor ].icer shall be a TeitiOa of the seem*; sad Profile,&. She p1ege shall be y��ed sF a tsiietw°A eattu"r sad the..aeeer district with tba fo1U» ", 9 ceitifi- f "I 4,*USy that. the doPiwa of the @",I eyaea® f.a Sraa< tio. 9?64 !s eetia0 with the am•sx cyetea arPSOA. aaa Pio of the Barters lhntiafP"' Doter aaartasaad' tw:Ls sdagaato at thie OrA to tsast Morriet ns4� that the snare disposal afn tract. This eartlfication sball be the antiEfpstod wastes from the ProPaoed a' y�I p poasfblo officialOfthe esror diasriat. Tha:ola+e mast be salted �'< tlw Cotanty gu mayor a nffica to review at . leant •two easke Viiei 60 itneat fat Eha tnaordetioo of the finmap•. It will be neaew"UT for abs ®�e�eota to Da aNs Prior to the rocar"t"a of the final aW- i t '- wyrtaa - .,Qnl. S�R:ar 7a2y tialy:yours• jXMLD L. @int pyreetor'af:fn Richard L ;[Ya pdodaiatr�civ+ waa7.ih " k'Y-{ F !9 v Y� 1. 1 t ^' y t I F !9 Riverside Cour y i 11 ',i�ai 1:. ".7i Sfd1IM planning Commission _. County Administrative center Rivetside, California Osntltiaen: Re: 'Tract. 8369 n Reference is made to `located on, northerlg tentative•Tiact.8369 aide of Rancho Vista Drive in the Rancho'California area. Our review indicates the proposed 'tract is suhJect. to local offsite atom runoff along portions'of its northerly boundary•. The developer proposes carrying these flows along with onsite ruaoff within the interior street system. In acme cases these flows will be outlsttod frog, the streets into drainage facilities located between, et It is noted that eeDtte westerly aendeoes � indicate an Outlet for flo)+s.tributary •I' street. Following are thS,District- s.recommendations: 1. The drainage facility located on lot ,116 and any other drainage faci3.it.ies that may:be'located between lots must be concrete lined. 2. 'Improvement plans and &,grading plan showing all drainage facilities should be sul;n,itted to the District for review r to recordation of the final map. and approval prio ;', All. drainage facilities.should.be,located in drainage;. easements. 1Hese•d-ainage easements ,must be shown on the.. final m::p along wiih'a note,estati.ng that drainage 'easement§: must hc`3-ept.£rae of',all buYlduxga, .obstructions and:enrroact�munt;.bY=Iand';ifills.:+;� r . 4 A copy of the firla map Should be submitted to, the r). strict for:.review' as .l. appLoral' iirior- tn, irecordation a„ a Very.truly:Moura L t�1 JV�L BfYYANT �. Chief £r5inee IM SON ROBERT A pl:inn) ug i.,tyauuar CC: ltoad Dept. ' Dept. of Bldg ;hgate'y _ — (4, w, eaznvr.: �. M, was, e. a aoa wa 7fLOPOM 4*1&)>N14WW er•n n,clrW ::COAND` FLOODNTROL 1 RIVER3im:COUNTY 'WATER :.CONSERVATION DISTRICT :h 19 Augµst, 5i Riverside Cour y i 11 ',i�ai 1:. ".7i Sfd1IM planning Commission _. County Administrative center Rivetside, California Osntltiaen: Re: 'Tract. 8369 n Reference is made to `located on, northerlg tentative•Tiact.8369 aide of Rancho Vista Drive in the Rancho'California area. Our review indicates the proposed 'tract is suhJect. to local offsite atom runoff along portions'of its northerly boundary•. The developer proposes carrying these flows along with onsite ruaoff within the interior street system. In acme cases these flows will be outlsttod frog, the streets into drainage facilities located between, et It is noted that eeDtte westerly aendeoes � indicate an Outlet for flo)+s.tributary •I' street. Following are thS,District- s.recommendations: 1. The drainage facility located on lot ,116 and any other drainage faci3.it.ies that may:be'located between lots must be concrete lined. 2. 'Improvement plans and &,grading plan showing all drainage facilities should be sul;n,itted to the District for review r to recordation of the final map. and approval prio ;', All. drainage facilities.should.be,located in drainage;. easements. 1Hese•d-ainage easements ,must be shown on the.. final m::p along wiih'a note,estati.ng that drainage 'easement§: must hc`3-ept.£rae of',all buYlduxga, .obstructions and:enrroact�munt;.bY=Iand';ifills.:+;� r . 4 A copy of the firla map Should be submitted to, the r). strict for:.review' as .l. appLoral' iirior- tn, irecordation a„ a Very.truly:Moura L t�1 JV�L BfYYANT �. Chief £r5inee IM SON ROBERT A pl:inn) ug i.,tyauuar CC: ltoad Dept. ' Dept. of Bldg ;hgate'y _ —