HomeMy WebLinkAboutTract Map 8369 Soils ReportOF
APR 14 1994
• CFY o -r= - ',TA
Geotechnical • Geologic • Environmental
24890 Jefferson Avenue • Murrieta, California 92564 • (909) 677-9651 • FAX(909)677-9301
Mailing Address: P.O. BOX 490 • Murrieta, California 92564
April 11, 1994
Alta Vista Community Association
P.O. Box 890143
Temecula. California 92589-0143
Attention: Mr. Jack Leathers and Ms. Jo. Ann Lamb
W.O. 626 -B -RC
Subject: Compaction Report of Grading, Pipe and Board Repair of Slope Failures,
Tracts 8369 and 8369-1, Alta Vista Project, Temecula, Riverside County,
California
Reference: "Geotechnical Investigation of Existing Slope Failures, Tracts 8369 and
8369-1, Alta Vista Project, Temecula, Riverside County, California," W.O.
626 -A -RC, by GeoSoils, Inc., August 31, 1993.
In accordance with your request, this geotechnical report of grading is provided for the
regrading of slope failures within tracts 8369 and 8369-1 in the city of Temecula. The
grading within the subject slope failures began on December 24, 1993, and was
completed on March 11, 1994. Unless superseded by recommendations presented
herein, the recommendations contained in the referenced report remain pertinent and
applicable.
PURPOSE OF GRADING
The purpose of the grading was to repair 11 slope failures within previously graded
slopes located on the subject site.
ENGINEERING GEOLOGY
The geologic conditions exposed during the process of grading were frequently observed
by a representative from our firm. The geologic conditions encountered generally were
as anticipated as presented in the referenced report (GeoSoils, Inc., 1993). Unless
specifically superseded in this report, the evaluations, recommendations, and
conclusions in the referenced report for the site remain pertinent and applicable.
GeoSoils, Inc.
l
Alta Vista Community Association W.O. 626 -B -RC
Repair of Slope Failures April 11, 1994
Tracts 8369 and 8369-1, Temecula, California Page 2
SOILS ENGINEERING
Preparation of Existing Ground
1. Prior to grading, the major surficial vegetation was stripped and hauled offsite.
2. Previously placed fill materials involved with the slope failures were removed to
.expose competent fill and/or bedrock materials in areas to receive fills.
3. Subsequent to the above removals, the exposed subsoils were scarified to a depth
of about 6 inches, brought to at least optimum moisture content, then compacted
to a minimum relative compaction of 92 percent of the laboratory standard.
Fill Placement
1. Fill consisted of native onsite soils and imported soils that were placed in 6- to 8 -
inch lifts, watered, and mixed to achieve at least optimum moisture conditions, and
compacted using hand tampers.
2. Fills placed on surfaces steeper than 5:1 (horizontal to vertical) were benched into
competent material.
Field Testing
1. Field density tests were performed using the sand cone method ASTM D 1556-90.
2. Field density tests were taken at periodic intervals and random locations to check
the compactive effort provided by the contractor. Based upon the grading
operations observed, the test taken are considered representative of the
compacted fill.
3. Visual classification of the soils in the field was the basis for determining which
maximum density value to use for a given density test.
GeoSoils, Inc.
Alta Vista Community Association W.O. 626 -B -RC
Repair of Slope Failures April 11, 1994
Tracts 8369 and 8369-1, Temecula, California Page 3
Maximum Density Testing
The laboratory maximum dry density and optimum moisture content for the major soil
types within this construction phase were determined according to test method ASTM
D-1557-91.
REGULATORY COMPLIANCE
Processing of original/existing ground and placement of compacted fills under the
purview of this report have been completed under the observation of and with selective
testing provided by representatives of GeoSoils, Inc. and are found to be in general
compliance with our referenced report (GeoSoils, Inc., 1993).
Our findings were made in conformance with generally accepted professional
engineering practices, and no further warranty is implied or made. GeoSoils, Inc.
assumes no responsibility or liability for work, testing, or recommendations performed
or provided by others. This report is subject to review by the controlling authorities for
this project.
GeoSoils, Inc.
Alta Vista Community Association W.O. 626 -B -RC '
Repair of Slope Failures April 11, 1994
Tracts 8369 and 8369-1, Temecula, California Page 4
We appreciate this opportunity to be of service. If you have any questions, please call
us at (909) 677-9651.
Respectfully submitted, gg1OFESS/o
��Q�O PN J. JFS.SgI�y
GeoSoils, Inc. Q Go
w No. 439 2
^
Eo.6-30-97
�cS G�,OT fCHN�GPv�Q'*
Alan SSUp glFOFCA`F
Civil Engineer, RCE 18431
Geotechnical Engineer, GE 439
?Jo l< i
Xan ct Manager
RGS/JPF/AJJ/rs
Distribution: (3) Addressee
(3) Mr. Jim Faul - City of Temecula
GeoSoils, Inc.
GeoSoils, Inc.
Geotechnical
24890 Jefferson Avenue • P.O. Box 490 • Murrieta. California 92362
Alta Vista Community Association
P. 0. Box 890143
Temecula, California 92589-0143
Attention: Mr. Jack Leathers
RECEIVED
Nov 771993
cITy OFF TEMECULA.
Geology
(714) 677-9651 • FAX (714) 677-9301
October 21, 1993
PR 626 -B -RC
Subject: Proposal and Cost Estimate for Geotechnical Engineering Services
During Slope Repairs, Tracts 8369 and 8369-1, Alta Vista Project,
Temecula, Riverside County, California
References: 1. "Geotechnical Investigation of Existing Slope Failures; Tracts 8369
and 8369-1, Alta Vista Project, Temecula, Riverside County, California,"
dated August 31, 1993, W. 0. 626 -A -RC, by GeoSoils, Inc.
2. "Cost Estimate for Geotechnical Services During Slope Restoration,
Alta Vista Project, Temecula, California," dated September 30, 1993, PR
626 -B -RC, by GeoSoils, Inc.
Dear Sir:
In accordance with your request, we are pleased to submit this estimate of costs for
geotechnical engineering services during slope repairs at the subject site. The purpose
of our work would be to document that the repairs to the existing slope failures at the
previously graded site are performed in accordance -with the recommendations and
geotechnical design criteria outlinedin the referenced report.
Based on conversations with the contractor, and as indicated previously in referenced
document No. 2, the duration of the job span is estimated at 5 to 6 working weeks, and
field technician time and nuclear densometer time is estimated at four hours per—day.
We have furtherassumed four hours (two maximum dehsi y tests —of- laboratory
technician time per week, two hours of staff time per week, and one-half hour of principal
time per week.
Los Angeles Co. (818J 785-2158 • Orange Co. (714J 647-0277 • San Diego Co. (619) 438-3155
Alta Vista Community Association
Tracts 8369 and 8369-1
Alta Vista Project, Temecula
SCOPE OF SERVICES
October 21, 1993
PR 626 -B -RC
Page 2
1. Compaction testing for the slope repair backfill within the limits of the project in
groups of four tests or more.
2. Laboratory testing incidental to compaction testing.
3. One final -report (6 copies) summarizing the results of the testing and services
provided above.
ESTIMATED FEES
The cost of these services depends mainly on the number of trips to the site that are
required, the number of retests due to initially inadequate compaction and the time span
required to complete the entire project. The duration of the job span is estimated at 5
to 6 working weeks, and field technician time and nuclear densometer time is estimated
at four hours per day, for construction during normal work hours, Monday through
Friday. No overtime has been anticipated. We have further assumed four hours (two
maximum density tests) of laboratory technician time per week, two hours of staff time
per week, and one-half hour of principal time per week.
1. Slope Repair Backfill Observation and Testing
Principal Engineer/Geologist
0.5 Hrs/wk x 6 wks x 5100.00/Hr
Staff Engineer/Geologist
Field Technician
2 Hrs/wk x 6 wks x $75.00/Hr
20 Hrs/wk x 6 wks x $45.00/Hr
Nuclear Densometer,
20 Hrs x 6 wks x 58.00/Hr
GeoSoils, Inc.
300.00
5,400.00
Alta Vista Community Association October 21, 1993
Tracts 8369 and 8369-1 PR 626 -B -RC
Alta Vista Project, Temecula Page 3
Laboratory Technician (2 maximum density tests/wk)
4 Hrs/wk x 6 wks x $52.00/Hr 1,248.00
Subtotal 8,808.00
2. Final Soils Compaction Report
Principal Engineer/Geologist
1 Hrs x $100.00/Hr 100.00
Staff Engineer/Geologist
5 Hrs x$75.00/Hr 375.00
Technical Illustrator
8 Hrs x $45.00/Hr 360.00
Office Services/Reproduction 165.00
Subtotal 1000.00
TOTAL 9,808.00
As shown above, the overall cost for the engineering services for the subject site, as
described, would be $9,808.00. Our charges for the above scope of services would not
exceed the fees shown in our cost breakdown. We would invoice monthly on a time and
materials basis. Any outstanding invoices and/or charges would be due and payable at
the time our report is presented to you.
If services are requested that are not included in our fee breakdown, they would be
considered an extra cost item. All additional work beyond the scope and parameters of
this proposal would be charged on a time -and -materials basis as shown on our attached
Agreement and Work Order. You would be contacted for authorization of any additional
work prior to commencement of this additional work.
Charges for additional costs, incurred due to subcontractors' failing tests,
unpreparedness or where work was not ready as indicated by the called -in request,
GeoSoils, Inc.
Alta Vista Community Association
Tracts 8369 and 8369-1
Alta Vista Project, Temecula
October 21, 1993
PR 626 -13 -RC
Page 4
would be charged in addition to the proposed amounts. These charges would be
itemized individually on the monthly invoice in order that the appropriate subcontractor
may be backcharged.
Enclosed are two copies of this proposal and our "Agreement and Work Order." Please
sign, date, and return both original copies of the Agreement to us. An executed copy
will be returned to you. If you have your own contract forms, we would be pleased to
use them, subject to our review and provided that this proposal and its enclosures would
be incorporated as part of your contract form.
We appreciate the opportunity to submit this proposal. If there are any questions or if
you need any clarifications, please contact the undersigned at (909) 677-9651.
Respectfully submitted,
GeoSoils, Inc.
John P. Frank in
Principal Geologist
JPF/jmd
Attachment: Agreement and Work Order (F-16)
Distribution: (2) Addressee
(1) Jack Leathers - home address
GeoSoils, Inc.
SLOPE REPAIR UPDATE
Dear Property Owners,
October 8, 1993
After the ballot was defeated 52 to 43 last June 15th, the Board contacted the City
concerning our status. They indicated the slope failures constitute a public health and
safety risk. The City indicated that if we don't repair the slopes they will cause the.repair to
be made and bill us. They also Indicated that they have the power to lien our propertles If
we failed to pay.
The Board asked what was required In order to obtain a permit. They told us a
report from a geologist would be necessary. We hired Geo Soils, Inc., to furnish us with a
report. We just received it September 10th. It was immediately turned over to the City, with
additional material, and a permit was issued. We used this report in asking four
contractors to bid on the work. We asked our landscape maintenance company to furnish
us with a plan and bid to landscape the areas and re-establish the irrigation system.
We have added together the bid, known costs, and estimated costs. The sum
amounts to almost $150,000. Borrowing this amount through the Small Business
Administration, for thirty years at 4% Interest will require a monthly payment from each
property owner of approximately $5.00, according to the SBA. We are not guaranteed at
this time a 30 year term, but they feel reasonably sure our request would be approved.
We have selected the most economical proposal (pipe and board method), among
the proposals that the geologist recommended.
We have changed the ballot so that it refers only to this particular disaster–not to
any in the future.
The cost will be the minimum, based on the geologist's report
By doing the work we. do not legally accept the responsibility. It is the Board's feel-
ing that the responsibility remains with the developer. We have made a demand on the
developer, who has turned the matter over to their insurance carrier, who has agreed to
consider the claim. We will further investigate and pursue this claim If we see that we have
a legitimate and economical possibility of recovering money. Any money received would
be used to reduce our debt.
None of us had a choice how the problem would be fixed. The City requires the
geologist report and the report tells us the methods of repair, of which we chose the most
economical.
Thank you for reading this—please refer to the ballot and please vote. Your Board
of Directors recommend that this bylaw change be approved.
ALTA VISTA BOARD OF DIRECTORS
BALLOT
AMENDMENT TO BYLAWS, ARTICLE V, SECTION I
ALTA VISTA COMMUNITY ASSOCIATION
SEPTEMBER, 1993
The Ouestion: Shall the last sentence of Article V, Section 1 of
the Bylaws of the Alta Vista Community Association, which reads as
follows:
Notwithstanding any or all of the foregoing powers, the Board
of Directors shall not enter into any contracts which bind it
or the Association for a period in excess of one (1) year,
unless reasonable cancellation provisions are included
therein.
be deleted and replaced with the following:
Notwithstanding any or all of the foregoing powers, the Board
of Directors shall not enter into any contracts which bind it
or the Association for a period in excess of one (1) year,
unless reasonable cancellation provisions are included
therein. However, the Board of Directors shall have the
authority, without a vote of the membership, to enter into a
contract of any duration for the purpose of borrowing or
otherwise obtaining government disaster relief funds from the
U. S. Small Business Administration, or its designated
representative(s), to repair nine slide areas that occurred in
January/ February, 1993. The purpose of any such funds obtained
by the Board of Directors shall be for investigating,
analyzing and repairing the nine slope failures that lie
within the Association's responsibility to maintain or repair.
The Board of Directors shall be entitled to pass a special
assessment in an amount necessary to repay this specific
disaster loan obtained from the U. S. Small Business
Administration, or its authorized representative(s). The
amount of the special assessment shall be spread over the term
of the loan. The special assessment may be assigned as
collateral for the loan as required by the SBA.
PLEASE NOTE: In order to approve the proposal, a minimum of
76 homeowners must vote "Yes" to approve the amendment to the
Bylaws and to pass the special assessment as outlined above.
(over)
The Ballot
YES, I/we APPROVE of the amendment to the Bylaws, Article
V, Section 1 as stated above, which will allow us to pay
for the cost of the repair over a period of time and
allow us to pay quarterly instead of in a lump sum
payment.
El NO, I/we DISAPPROVE of the amendment to the Bylaws,
Article V, Section 1 as stated above, understanding that
there will possibly be a lump sum payment requirement
when the work is done, as we could not then obtain a
loan.
(signature) (signature)
(Alta Vista address)
Please return the ballot to:
Alta Vista Community Association
P. O. Box 890143
Temecula, CA. 92589-0143
Return the ballots prior to October 22, 1993
alta Vista Community Association
P.O. Box 890143
Temecula, Ca. 92589-0143
Board Of Directors:
5 November, 1993
42567 Remora St,
Temecula, Ca,
92592
Ref: Slope erair Update
octGoer '�, 1993
The referenced letter sent to associ-tion members to elicit approval
of a huge government loan for geologic repair of slopes on private
property contains mis-leadin- and incorrect informaation,
1. The letter states that the city has determined that the slope
failures constitute a public health and Safety risk and if we don't
repair the slope they will cause the repair to be made and bill us,
duct: City officials have recently stated that NO determination
has been made by the city for either slope status or actions
for repair.
2. The letter !aso states that by doing, the 'r:ork we do not legally
accept responsibility.
Fact: The proposed change to the Association By-laws states
"The purpose of any such funds obtained ------- sh_=.11 be for
investivatin , analyzing and repairing the nine slope failures
that lie within the associc:tions responsibility to maintain or
repair". This is tantamount to accepting responsibility.
3. The ballot text is limited to repairing with a loan or repairir�E
with lump sum payment. 1,10 provision is ms.de for not repairing until
legal responsibility is established, The C.C.k.'s provide for member`
vo a for repairing or not rer.•airini items thrit are .%ithin the %.ssco-
iations responsibility with t e added provision thst any insurance
proceeds can be distributed to members.
In view of the foreEoin,; and the fact tho.t no common usage :.reas exist
in the tract ie; all lots are sepaAely deeded with some having desig-
nated easements for association maintenance of landscat.e and sz:ri_:kler
s stems, Tease enz5ure that legal responsibility is esta.Q�ishe before
committment of ssoci__tion f—un-•s to any repair activity and that formal
requests from the city have been received based on th-t deter:in-tion,
any city liens on property should be directed to the or:aers of the
affected lots in the absence of le�.-al determination that the association
is totally responsible.
Further, some of the dema.ze has been reportedly caused by owners
of up - slope lots which may or may not be in violation of provisions
of the California Civil Code. Other possibilities include ;:re -exist-
ing -eolo;;ic fe-tures, developer actions, responsible county depart-
ments and possible community association contrc,ctor necligenoe. All
of these should be addressed before lon.• term co mitt.:ent to a loan.
Yost importantly,any current actions may set precedence for future
calamities of larSe proportions.
I/We respectfully request that the P,ov. 7 ballotting be set aside until
all accurate information is made available to voting members.
Burlie L. Cole
e�. Cole
w
FIRST AMENDMENT TO BYLAWS OF
ALTA VISTA COMMUNITY ASSOCIATION
The following First Amendment to the Bylaws of Alta vista
Community Association was adopted by the members of the Association
pursuant to the terms of Article VIII, Amendments.
1. That portion of Article V, Section 1 of the Bylaws that reads:
Notwithstanding any or all of the foregoing powers, the
Board of Directors shall not enter into any contracts
which bind it or the Association for a period in excess
of one (1) year, unless reasonable cancellation provi-
sions are included therein.
is hereby amended to read as follows:
Notwithstanding any or all of the foregoing powers, the
Board of Directors shall not enter into any contracts
which bind it or the Association for a period in excess
of one (1) year, unless reasonable cancellation
provisions are included therein. However, the Board of
Directors shall have the authority, without a vote of the
membership, to enter into a contract of any duration for
the purpose of borrowing or otherwise obtaining govern-
ment disaster relief funds from the U.S. Small Business
Administration, or its designated representative(s), to
repair nine slide areas that occurred in January/Febru-
ary, 1993. The purpose of any such funds obtained by the
Board of Directors shall be for investigating, analyzing
and repairing the nine slide areas on the slope easement
areas lot that lie within the Association's responsi-
bility to maintain or repair. The Board of Directors
shall be entitled to increase the homeowners assessment
by the amount necessary to repay this specific disaster
loan obtained from the U.S. Small Business Administra-
tion, or its authorized representative (s) as an
emergency assessment authorized by Civil Code Section
1366(b), without an additional vote of the membership.
- 1 of 2 - C:\CLffWS4\2957.01\8YLAWAME.#1
Y
Except as expressly amended herein, the provisions of the
Bylaws of Alta Vista Community Association shall remain in
full force and effect.
I hereby certify that I am the duly elected and acting
S,ecretary of the above Association and that the above First
Amendment to Bylaws received the required approval of the Members
of the above Association.
DATED: 199-3 .
STATE OF CALIFORNIA
COUNTY OF ��% t�s IA f l
S.S.
On N 0 V l�N BL R 9 ijqq_� before me,
04'go J--X1,14-IRk
a Notary T011c =foJ idLYLie, personally appeared
personally known to me (or proved to me on the basis of satisfactory
evidence) to be the person(s) whose name(s) islp"ubscribed to the
within instrument and acknowledged to me that /sheljAWexecuted
the same in hWher/)bt authorized capacity(ies), and that byAtslhero"
signature(s) on the instrument the person(s). or the entity upon behalf
of which the person(s) acted, executed the instrument.
WITNESS my hand and official seal
Signature
F 249215-9r)
(7 „
re ary
FOR NOTARY SEAL OR STAMP
Y tt-l►ri.-'J a� • .
REDI-LETTER
TO: t I,:,r ; .�.�rd, ZN-�: - FROM:
SUBJECT:
DATE: 1—
MESSAGE:
�i�. >,-1c� Z>='���rrcg Sug�vY.\1Tc`O Tr.t.
EaPr7Cr-Ic=D r"1FC'�
Z
r0�
rco L-Z�
n
x \'FF L rT'/
IJl SONY SAN. �a TH I"r yeCL"P r.� + a
` CVLO YCU
\�L ErIS1U—�c,a"
.3\� --II+E I4: CS -Tc ")T V/
ca; , i Cs
I for ti�S
SIG
RkFORK, c%
4S468(4P468 POLYPAK (50 SETS) ❑ NO REPLY NECESSARY �r 0 REPLY RE9UESTED - USE REVERSE SIDE CARBONLESS SPEEDISEI
FIELD TESTING REPORT
CLIENT TRACT.
SUPT. CONTR
EQUIPMENT
w.0._
DATE_
.0.—
DATE_
NAME
HOURS
P
FAE
I
4L
OF
--c
i cation
Alo
Moisture
Content
%
7
Relative
Compaction
=Evil
MOM
"JWJJGL:j
11MA
Kati
L7jM
jU*4
MWEMWAAMOVABIRMW
�—�FgV
.dWAA
HIM!
�111M�
COMMENTS:
FIELD TESTING REPORT
CLIENT l'f�. /i Gil ./� TRACT
SUPT.
W.O. bA6 -Q ' ``
DATE
NAME
HOURI
LOCATION
OF
40
COMMENTS:
is@O.SO1 S^I c���
By: rr
Page of _
CL
SUPT.
EQU
FIELD TESTING REPORT
�C TRACT
C
Dry
�-
/ CONTRACTOR—
n
DATE
NAME L -}J/(
HOURS
LOCATIO:i_��_(�71
COMMENTS:
G/,
By:
Page % of
Moisture�i
pill
t/A�'1�
rsri►m
rWlm
COMMENTS:
G/,
By:
Page % of
FIELD TESTING REP RT
7
' l/
CLIENT �(-(' /A 'R"1 I o -k TRACT c/ / 1D
SUPT
w. o. ( 1' /—,eL
DATE C
6—
NAME
HOURS
LOCATION ::�2C
11
COMMENTS:
By:
Page of
�•.
Moisture
•
, ry
p.
COMMENTS:
By:
Page of
FIELD TESTING REPORT
CLIENT rjITRACT�U
SUPT. /r _J CONTRACTOR
W. 0.
DATE
NAME
_// j -
COMMENTS:
nc.
By: (—
Page of
•r
•ttv
Content1-
70'.
1
M
, UMME
"ll
WMAPOWMA■-■1111111m,
-
11=111111111111M,
COMMENTS:
nc.
By: (—
Page of
FIELD
CLIENT
SUPT.
EQUIPMIENT l
TESTING REPORT
TRACT
n
DATE
aOURS
LOCATION
11
COMENTS:
0-1L u. .'Ul
GeoSoil/s, Inc-
3y:
nc.ay:
Page _�_ of
•.,
mDen
ity
. . -
u��i�S�
i��/ �i
.P.
VIA
����I__
A
r111M
�L/��►��■■I�ii�
J "AA
_
,
A
nil 1. ■,_
err.+
laq
AIM
COMENTS:
0-1L u. .'Ul
GeoSoil/s, Inc-
3y:
nc.ay:
Page _�_ of
TestRe
No.
Location
1:t ive
Compaction
'.4
mlll,�.WlffilMIM."Imm,
IWOO.M.0, WINFIS
M#W�MAMMVM
M��
AM�
NAWIMPAMEPAW
p -"O Wi�m�
W I "ISPIA
W. W" Al
CM4ENTS:
C.
By:
Page of
CLIENT
SUPT
EQUIPMENT-'
W.O. 6,Ac--&ec_ .
FIELD TESTING REPORT DATE 3- �
NAME
HOURS
�. l
TRACT LOCATION _,
TJ / CONTRACTOR
COMMENTS:
Geo S01
By:
Page �_ of
IS PA WNIIII
w0m�
COMMENTS:
Geo S01
By:
Page �_ of
CLIENT_
SUPT._
EQUIPMENT
FIELD TESTING REPORT
TRACT
CONTRACTOR_
W.0.
DATE_
NAME_
HOURS
LOCATION
I
—/U
®
®�
Densitycti
��'.
►
. -.. ,M
�
_•_rte
�
�I�rwr�■�i���
COMMENTS:
�,ib
Page / of
FIELD TESTING REPORT
CLIENT A I JA I/i5{y TRACT LOCATION
SUPT. —SACK
//rr
w. o. 6z& - S- i2 -C
DATE_ (Z 17-'11 j 3
NAME Pie kA,. c.(
HOURS Z -C
Test
No.
Elev.
or
Location Depth
Moisture
Content
%
YOFTTP
.
p.c.f.
_CULA /
QAP�te�ati a Test
Compaction Type
Soil
Type
,4
/1
too, Pi is
e le B
1
1 A4 a a- te e-1, i
r e
�
4
o gr,de
M
v cr
- r:✓ % P
iCH o
l
COMMENTS:
GeoSoils,/Inc.
By:
pave of
FIELD TESTING
CLIENT V i5 TRACT
W.0.i�A7(„ -13"IZ-C
REPORT DATE lZ�2y�93
NAME L.GL! ArC,9
HOURS
LOCATION
SUPT.'f A c.1C_ CONTRACTOR e //r��
EQUIPMENT
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
p.c.f.
%
Relative
Compaction
Test Soil
Type Type
0 6-5r..✓
�G�/OC✓,
21
S O
Z
v
lot f,
50,11 -SZ e
a edQ tel
lfo vv n
e
-
v
k
C
b ert
.,
-
b
e vrr.Q Ip
b "J
roll l etl
rou"JI L j-
r AC Z"
A le o
US
10 l
w. -j
-::S
N+�
�SAC'S
NA01
Pt_
A
7,erlto
.ee,10 /e
&
COMMENTS:
Inc.
By:
Page T of
Z
FIELD TESTING REPORT
CLIENT A I+Q VT I R TRACT
SUPT. 1►rA &Z K- CONTRACTOR
EQUIPMENT .d-
LOCATION
w.0._ -d-? e
DATE IZ12,11 3
NAME I C .�
HOURS - o
Test
No.
Elev. Moisture Dry
or Content Density
Location Deptn % p.c.f.
Relative
Compaction
Test
Type
Soil
Type
i; �,
O
11
.)
Ale - b. , v c % ^ �
�
, qr
I
l
t r�
,
f a , c+, `v V2 —j e CL r e CAL
COMMENTS:
GeoCSoi , Inc.
Ey:
Page of
PCIPM gall
FIELD TESTING REPORT
W. 0. Coa ca - a - Z.C-
DATE rj}2_�aR� �c3
NAME K tc L w, rA
HOURS 3.0
CLIENT _41-� Oq TRACT LOCATION 7C:v. e ¢ w %(3l
SUPT. 3ACL-' CONTRACTOR Net 1\,e r
EQUIPMENT
Test
No.
-
Location
Elev.
or
Deptn
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type I
Soil
Type
N e- CA
S,
uG5iem
7
4
1
RK� rV
L /+
/�
A)
iI
UV
i ';
/ ocv
b
HA 11 C/ �,
r
0, "
Goo -510,14,
l.1`Fpi r14Y
IJ t.-
—
1 1
Y, lepec,
a re k
V19 ,2.0e—
/V e
-01
IC
&/0 cv
S ape.
;1 r
E h boa S/
a
/1
leg A
e r
kn
4'
l cive- 10
Sewe
`
Ze
%YAM
awr
S w.¢toet
Q 3r
1-e-Cfi3•f%O
0
0&-f .S' e-
Or- /
el.eH
C3reoctt l;,c.r4
a,
ed
k
o
�Q
_'mak
•� �Io
ti eros
_� F
,5
ar e. F -S
clu
2 e �.EF,;-
e-
o e•
Sbaulbe
Lai-
oci
F
- r os'
1
�
COMMENTS:
��►1CI E �ArIGiQ � OUe.:- �:.fo J ecr C3.r'eQ �o ;Z¢�O tL •L
n
G' u Ino r: V e 5
FORM 89/1
L
J0 SLc.T �o
GeoSoils, Inc.
By:
Page of
FIELD TESTING REPORT
CLIENT A46\, N/iS [Q TRACT
W.O. cp:72(D-a-iZe-
DATE
NAME �12 t -W A : Cf
HOURS 6 _0
LOCATION �Pw�ec.rle
SUPT. SQCI4- CONTRACTOR J�e; /I eT
EQUIPMENT
3IoPE 1_ 3
",�;1 ire
�l,ar"✓
' i/✓ �rocc'--�5 IAC e m
COMMENTS: g/1lV.y
tri(
.Sierl O;OG JffH.I0rc4ffrrJ 01
IfAl T- i•
below
rieyis Rfou ,.A S' 4,4ce. .2X
J?" %/fAird
luc�a��
Iro , IACe-
f Sn;L Cm,,e
i2 %O
per
6-S-7
3 ea; Ls i2eo2r, GeoSoils,
Inc.
P✓cc-es,< f'Ae
By:
II rr .5e�
F �hFPI
2.-
(2ec1r1.2ii. c. Page
F MA
►a t�ni5 vu P�
Mz-WmIIIIIM-
WIMP
IWAIFJ�: WIN
WN rod IIIMo-
• r
- G swi #LI
_
g.1!
_
•'TSS-----
_
L
",�;1 ire
�l,ar"✓
' i/✓ �rocc'--�5 IAC e m
COMMENTS: g/1lV.y
tri(
.Sierl O;OG JffH.I0rc4ffrrJ 01
IfAl T- i•
below
rieyis Rfou ,.A S' 4,4ce. .2X
J?" %/fAird
luc�a��
Iro , IACe-
f Sn;L Cm,,e
i2 %O
per
6-S-7
3 ea; Ls i2eo2r, GeoSoils,
Inc.
P✓cc-es,< f'Ae
By:
II rr .5e�
F �hFPI
2.-
(2ec1r1.2ii. c. Page
of
►a t�ni5 vu P�
FIELD TESTING REPORT
CLIENT AIF V Sha TRACT
SUPT. -T4cL<- CONTRACTOR
M
DATE ►Z/3�IQ3
NAME Ry:,y .,.tee
HOURS Ca -O
LOCATION I ew�GC-�►
COMMENTS: COMMENTS:
GeoSoils Inc.
By:
Page of
Elev.
Moisture
Dry
Test
or
Content
Density
Relative
Test
Soil
No.
Location
Deptn
%
p.c.f.
Compaction
Type
Type
//-V
//8.9
93-
N 0
ffl C
/40 S
o
/V ID
L
/11-1
cl 7-
fud
111.2�-
/0
3
/o-
//3.�
88•z
NO
D
F es Q
f e
y r
n
el
f ArVr&
r
O
q
r'd r
n/ <ACk
0 La
!
O
t
`-
doe
A e ,
Y00 r
C'
0AG
V: O J rti P d
J. r�
ES
e - S
C: iPL
bJ I e
t5
r
e- f oa
C
w
uc
%o loe
`
e-
u
Lr;C0-
COMMENTS: COMMENTS:
GeoSoils Inc.
By:
Page of
FIELD TESTING REPORT
CLIENT_ 411A 111sk TRACT
SUPT.
EQUIPMENT
CONTRACTOR
w.0. _ �Z
DATE iZIZI (�{�
NAME r
HOURS c
O
LOCATION j e,n,,, /Q
Test
No.
/
Location_
c 3
Elev.
or
Deptn
c3.3
Moisture
Content
%
/o q
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
S`
Soil
Type
C
Zi
A f
ue35 o
CIt
ew,
o 0 e r.
N
3
�7
—40/fd
el Ll rim
^7
he
P ,-
COMMENTS:
GeoSo" , c.
By:
Page o
FORM 89/1
FIELD TESTING REPORT
CLIENT 4114 w's fri
TRACT
SUPT. SACle- CONTRACTOR
EQUIPMENT QP. ¢U�
W. 0.
DATE 17-13CII93
NAME LE I40y-rl
HOURS AW .3
LOCATION
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
p.c.f.
%
Relative
Compaction
Test
Type
Soil
Type
/e e '� 3
Z
99- 1
C-
ew,c.
COMMENTS:
GeoSo-il�s, Inc.
Ey: �l
Page of
cnou Yo/1
FIELD TESTING REPORT
CLIENT A41A, W5 �Q TRACT
W.O. cnoC(p'C3-?-c-
DATE_j�I
NAME �12 XA4 A . a
HOURS & - 0
LOCATION Pw-r GvIG
SUPT. 16 ClC CONTRACTOR fie;//eT
a,Relative
1
Conten t
7 compaction
WA
_
• r l�
f G �ifLl�_
� ♦ .�
�=
MON M-WRITAP �RffJffl
01M.
� sl icJ'e ?/Aril "./ Y�Ac e m Pn o r- oL C-..„ .
COMMENTS: gAlV,,v•rre( -$r6C1 0; (- CA beddrei at lPA�T 7'
I - belo.. F owNsk �rou cA -' .trace. �X I?, ffAirCl
w"CJcj I/J ,i%/ACL C'm,..17ACfni
J��h v� Ctn,�%ei r-S.i so;LS i2e r
J3 SfAndRI S
I It -,-5 f See.
A r ttni5 ! w. P / �%Ff �' Z IZ ec•p /c/r ..0
GeoSoils, Inc.
By:
of
Page of
FIELD TESTING REPORT
CLIENTgW.-I � •
SUPT. i,=lr,c- CONTRACTOR /; J
EQUIPMENT
LOCATI
W. 0.
DATE
NAME
HOURS 34 0
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
/
rs
B' 3
/v7Z-I
>C-
C
//
F C_�i
Q r, �: C i i
I
_, r- �' �• v.
j
r
(1,7, l
gcl'r
e v\
t r "A
0 Al
1
I
J,}
[K�l�iy7��Y�F`F
GeeSeils, Inc.
By:
Page of
W.O. (.0Z (a - R -p-c-
FIELD TESTING REPORT DATE - -kms
NAME %C-11geC(
HOURS �,,, . O
CLIENT ANA .vis�A TRACT LOCATIONTv- eCvlCA,
SUPT. JACK I CONTRACTOR {gall n-4'
EQUIPMENT
Test
No.
Elev. Moisture
or Content
Location Depth Y,
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
1z -V
C
s12A
IIL- 5,
9z -C,
-
c
O
-
r o/ !
o J Ik 14
L
/ 01A e4 ,2° 141,.l
r L (3W -le-
d -
ca
(C;
00
COMMENTS:
Geos C.
c.
By:
Page of
ensu ee..
FIELD TESTING REPORT
CLIENT At FA lIr�n¢A TRACT
SUPT. TA lt<- CONTRACTOR 4 P , / j -e-f—
EQUIPMENT
w.0. 62( - 3 - fz c_
DATE /- 5 j
NAME A,&(
HOURS 2_L,, �
LOCATION j
Test
No.
A
Location
Elev.
or
Deptn
Moisture
Content
%
Dry
Density Relative
p.c.f. Compaction
Test
Type
Soil
Type
16
544e
1' 3
13
126.
-
S C-
/&,j
o f
Pel.1
.41
t ,
Jla
, Oar
C%r
�+
«
✓
for (.0 14
D.er
eI ery z -
aK
A s'-7c,led
COMMENTS:
Ge Is, Inc.
By:
Page of
W.O. Gzc-
FIELD _ REPORT DATE, -!-33
/�iCHA.z/
HOURS —
CLIENT/1NA 1/iS1A TRACT LOCATION'i2S°)(p �2emc7w
SUPT. .l /4 rK CONTRACTOR IV,?/lel?
SN6i rc: i
L6�
Test
No.
Location[[
Elev.
or
Deptn
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
li len . fo; i
v [ o
!'vires1uef'
'
suE��
e2eyrec
5�n e_
�n�
Ze'e
a
-'
s be&N
It"
r 3
t'
c G✓
1. ;n
,., S 4
ki
S
6
S o e
Co s
e1r` ke-
Z
qAi V'/v t
rk
s
I n 10
Gn24 e t
lea
OA
C
t6w
.% nk 1
Z C K
`•
,1
Cr ar
Ve ..all
Z:t-ct
r•
r .1
0.
e✓r
"o j,.L
',Oe - 3
'Tr ea
d 3
rdrekj i.
c e
s•
r1.1
Gaa�
b we
cue
e
ua
n
aF r
c re
e •
COMMENTS:
L
:ti
COL•? -
L, Id
^
L,Id be inn0/P!H rl1 �Ycl %) So�ti iq5 )70 Srbl e
e°nY;.
FORM 99/1
GeoSoils, Inc.
By:
Page of
FIELD TESTING REPORT
CLIENT A I A (/j:s (r} TRACT
SUPT
EQUIPMENT
ae„eu A
CONTRACTOR H e, k\ tr
LOCATION
W.O.
DATE
NAME
HOURS y - O
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
p.c.f.
%
Relative
Compaction
Test
Type
Soil
Type
S/o f
r3=2,Ce
iZ•5
//Y.1
JZ -1
SC
n
sZ0
3
Ca-
13./
//rr-3
'i3-4
5(
.0
02
3
Ca
;Z.co
/;1-2
2-3
SG
C
-
tOc C;vt
If
5 eCPss
At, I
r l
)� )AC -P
a
t /A' P�
7'` "o A
c
t9 r. =l
r7 t -�
L.✓ '
t - s r
J .
I
V P!'f
r B'
COMMENTS:
Geo s, c.
Ey:
Page of
FIELD TESTING REPORT
CLIENT /114 V151Af TRACT
SUPT. J AC/G CONTRACTOR /i; r//t.r
EQUIPMENT
W.0.(n2u,- 8 -2.e -
DATE 1 - jLga3
NAME ` /n�y ..,� c�
HOURS -5.0
LOCATION lr/yI Pc/c�
Teat
No.
Location
Elev.
or
Deptn
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
3
Pig�
ue r qLC
% p
i
dr
4 IRS64VTSi
fvc.
T
& 9o
a r
H ./
ery
to/XC to- .4w G -H
f"
er
C/
6 /
P ✓/
COMMENTS:
GeoSoiInc.
Ey: <�- 24
Page
w.0. (-,76 ;n
FIELD TESTING REPORT DATES
NAME
HOURS
CLIENT 14
///A
TRACT����
LOCATION 7r-,y.re��
Soil
Type
SUPT.
Jq C/< -'CONTRACTOR
/3-0
111�c'/l«
EQUIPMENT
Test
No.
Elev.
or
Location Depth
Moisture
Content
%
Dry E
Density Relative Test
p.c.f. Compaction Type
Soil
Type
a5
S/0 e -'d- 3 i3l ,o
/3-0
/Z -3 y-0 L
ON
e s a o-
,�—
M A f ey :o'A 0
rc
Yir L
c LC
er
COMMENTS:
Goils Inc.
Ey: l/
Page of
FIELD TESTING REPORT
CLIENT A 14 Y%5Lr4
TRACT
SUPT. �1K1 e- <-- I CONTRACTOR Ale- //c/ -
EQUIPMENT
W.O.
DATE 4 //-
NAME 1�Ac-
HOURS y-0
LOCATION % t�A" e -e- u 4
Test
No.
Location
Elev.
or
Deptn
Moisture
Content
%
Dry
Density
p.c.f.
%
Relative
Compaction
Test
Type
Soil
Type
a
C C-
-�
io ��
2 /
`�S•6
Sc
SL17
On
S.
p
n c
�0"kqfrr,0
&11A
v e—
c
1 Q
T
C &+,C
%&,D o -c
Ck
I --
\
U CSS H
o De
e
i e
Q
D
t
c�
COMMENTS:
GeoSoils, Inc.
By:
Page o
C^0.. ao„
CLIENT A (k tnsiA TRACT
W.O.�nZb
REPORT DA"TE�,-iz-g3
NAM %CIS W, -A
HOURS
LOCATION `eyv eavlq
SUPT. JAeic CONTRACTOR e;\l e,( C'ay.S`
EQUIPMENT L e� a 9 C A C r\ce CoU4ry-
3dZdJ-/ l'ADriGe COb.rT
COMMENTS: 20SJ'&AJ (�eT�ro� F Ci reu.. // reyr✓' 5Aevlel be /rn0%erK&A4
Geo nc.
By:
Page of
FORM .80/1
- -
Moisture
ii
Dry
%
OF-
Content
Density
Relative
Location
%
P.C.f.
Compaction
..
4 r _4i .t
lig W.
WA
.4"IR1�
JJ :�
♦' 1 - �
r r
� W®
_®
•t•
ow."W".
wile
W.
Imp
- ME
Nw.90MNOR
I
_
rum
'' +. �._/d
�.•• ���
COMMENTS: 20SJ'&AJ (�eT�ro� F Ci reu.. // reyr✓' 5Aevlel be /rn0%erK&A4
Geo nc.
By:
Page of
FORM .80/1
FIELD TESTING REPORT
CLIENT AiIA TRACT LOCATION
W. 0. (PZ& -'P, -�-
DATE (— i L. 93
NAME
HOURS
SUPT. - wCJC- CONTRACTOR 11 >,T Cyn�S�✓ x' ( c
EQUIPMENT
z-7 3ozz-z Cw+2•. e -e
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
Orv
.0
B ✓ O
Sud,
a.T 31e
e
eCM iS - Y F
k, IL
locv r -
OtJ�
d
Z AIV
nJi2_P
Fenbedtl
!'
en/
pn
e •;
> e
ik'..w•
r,n4olly
P r
�
Z
i
8
✓
a �/
d
e
- /Y i
ren
u(
oils
-e
vrr/
P
COMMENTS: sl�� PB.a„I� Fi7 r Srt,✓ �sr 1i n / F 1G me w� ocr <J 5'L�a*vie(
IL.J Q ( VVl I ld Nn PNf PL� S
J� LPA%li...d VA/V& LQ bvt,e C'o�r `i Ti✓C><rfi
FORM 88/1
GeoSoils, Inc.
By: l
Page of
13
FIELD TESTING REPORT
w.o. ( - \ C
DATES
NAME
HOURS Z . O
CLIENT ,q/fa
I�)5 7fi
TRACT
LOCATIO�r—j (f �eevl�
SUPT.
�{QL°lC_
CONTRACTOR
2 n/Uj�/ J CIC Ulm
EQUIPMENT
3= 3eYNCL,
®
,•
, 'olm
MIMI—
�' � � cacti �
�_..f
/ -!��tl
�i � i� _
moi-=`•1J� ..,
' W
'
�FME0
COMMENTS:
GeoSoii33�t�.
By: h
Page of
W. 0. _. LC. r
FIELD TESTING REPORT DATE ZZ . -
NAME r1-yi ;;i
CLIENT a/ f; k 11i Im TRACT r� 3 (, "�
SUPT. .;Act: CONTRACTOR
EQUIPMENT 7 /3
LOCATION
HOURS
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
I Type
leAl
/v,-
307 Z
/( "('C
A-
le, be"
C•o
C
t'Y
O
.�
jz !41 el
G✓J
l.�
t7 ✓'PA
<9�
,CK. �+ VAi
V 7- .`J
1,l
/(..'
!/V/ ir.-
to -14 I
"6&
r{,
'/C!1'
:�
e!' •;� �
( Iia
c
;-�,t
o
'z�
Du
a—
Ev
i 2 5/ _Q
,iC.
;/
zF -
�, o
S-
✓ r„Y�
COMMENTS:
GeoSoils, Ipe.
By:
Page 0f
FIELD TESTING REPORT
CLIENT �7! j�i� , ;�j 1jQ
TRACT
W. 0. -2 -Z —
DATE
NAME
HOURS 3.S
LOCATION e1v�eCylCa
SUPT. :7-4 C!14�— 1 CONTRACTOR 4�1 // t r CO�'IL�
EQUIPMENT
Test
No.
Location
Elev.
or
Deptn
Moisture
Content
%
Dry
Density
p.c.f.
%
Relative
Compaction
Test
Type
Soil
Type
io e
/y z
I ►Z--
c
Z
/Z -Cc-
11b -Z
��\_
SL
l
ZZ -Z
91/,-7
SC-
lu
L
iev. e
e
6 e o!
2� o
A e-
e
�\
COMMENTS:
GeoSoils, i
ay
Page of
FIELD TESTING REPORT
w.0._j�2.y
DATE_ Irl—
NAME_L? iC-j Arcl
HOURS
CLIENT Alb; 051z1 TRACT LOCATION j Y vv` ef-,ll4
SUPT. J AC C- CONTRACTOR
EQUIPMENT
L,:f Z1 3o zZ2 Cap,-,ce CoyrT
COMMENTS:
u
�� nl e w e i..D Q` saoni AS ok4 �
Geo Inc.
Ey: -
Page
FORM 89/1
Moisture
Contentor
1
_ nsity
.•
Will
m
�. • u�Yl.Li�Ias�ll�__'i
.IIIINI���
. L_
IM
` ;
COMMENTS:
u
�� nl e w e i..D Q` saoni AS ok4 �
Geo Inc.
Ey: -
Page
FORM 89/1
W.O. -8-Rc-
FIELD TESTING REPORT DATE, -,Ll -L
NAME f` �7 iC-gAJc1
HOURS
CLIENT Alfa Vi5I-y1 TRACT LOCATION_ j-rV,,,rf-,i1Q
SUPT. ZAC4e—
CONTRACTOR
Z.4/ Z7 3o 222 CA?r%C2 CourT-
_Content
%
Relative
Compaction
Test
Type
�I
iu rMIIIIIIIII�_�
��J717�.
•.: a
r_
W -1,1111W
ME
9M.
COMMENTS:
GeoAeUs. Inc.
By:
Page
FORM 99/1
e
FIELD TESTING REPORT
CLIENT } .I+A 0 115 A:::: TRACT
W.0. L13 ,
DATE
����� t^�
NAME
HOURS -7"0
LOCATION` 7'*--\ ,. e c x _
c
SUPT. TALC CONTRACTOR A2kgd&;:Uz
EQUIPMENT -�Ye � L1 e r -
COMMENTS:
rs�D,� f C.
sy :\\
Page
Location��
Dry
�-
7
Compaction
mo
• V - 7
�A
.#
mI
R.. _ 1
'[Tii�1'.�
mZI�%7qq__
��
• •
�IMWI
3 _ M-0 3 1 ��-�IMMI__
COMMENTS:
rs�D,� f C.
sy :\\
Page
FIELD TESTING REPORT
CLIENT Aj(tj V/S!M TRACT
SUPT. J r9 Cr-- CONTRACTOR 14 e—; \t. it,
EQUIPMENT
W.O. CZco-3—ZL
DATE .1 Z ,
NAME icµ µ.�
HOURS___3
LOCATION T�
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
p.c.f.
%
Relative
Compaction
Test
Type
Soil
Type
11.1
l 1.1
1
�-
It) � t'C� OG � E
1
r I1[' v- J
C
G �"- � 5-
f-!i'ti w � nc� i
—�/A
ICC e- Fv.
COMMENTS:
GeoSpils, Inc.
By:
Page
FIELD TESTING REPORT
CLIENT b {Gi �/ISff3
SUPT._ TALx
W. O. . 7,& — :!;
DATE -%-fir -Q�j
NAME (K ICS 4,,41
HOURS
TRACT LOCATION j -e
CONTRACTOR T i I I e_.r-
EQUIPMENT (' 0 VSA D I e- i± uvA
30z.04 C v>��;�
CI_ n� V-" 6/
COMMENTS:
f
SAS, t.Ai"/ i
9
•'3 Lj' GeoSaW,, Inc.
,,.y. I •nom..Jl ,k. ..
By:
Page of
Elev. Moisture
Dry
Test
or Content
Density
Relative
Test
Soil
No.
Location Deptn %
p.c.f.
Compaction
Type
Type
:onik
-ter I urhih,
w�
�•� la• '{ri
�iIQ'LN
`
ePi
tPr
..nu
.:jrJ Ce
ler nn,
. w.0
� Ise
w
:G!
iJ
COMMENTS:
f
SAS, t.Ai"/ i
9
•'3 Lj' GeoSaW,, Inc.
,,.y. I •nom..Jl ,k. ..
By:
Page of
FIELD TESTING
CLIENT A l�^ V i s ,µ TRACT
w.0. 6 LF %z - iZ
REPORT DATE Ll�gl ���f
NAME F •cNn
HOURS G -y
LOCATION
SUPT. 3 A CiL CONTRACTOR K C -i11 -
EQUIPMENT
Test
No.
Location
Elev.
or
Deptn
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
OhJ
I2 t
.
I
I
a-lJ f r
COMMENTS:
Ge i1s, I C.
y
By: -
Page of-
FIELD TESTING REPORT
CLIENT 411,1 ;/IS14
TRACT
w.o._6zt,- r3 -4e
DATE_ lnZp - c/
NAME K / C ,-/,lJ�
HOURS
LOCATION % PMPCti jr�
SUPT. Z4cI<, CONTRACTOR Afie- Ile J'
EQUIPMENT /oOT, Z
Test
No.
Location
Elev. Moisture Dry
or Content Density
Depth % p.c.f.
Relative
Compaction
Test
Type
Soil
Type
$k' rZ-q 1`I o
92. -V
1i3
s
a /L -o 4WOi
1-5
Sr �ia9!;�i+ A 4 fe-q3f-
CV CK
e7e Lo-(00,v'e—
e L; e Pnf
C'6sc-siromek
0,rooe-j-e
'
;
:l/ j2
7
COMMENTS:
GeoSoils, Inc.
By: ZR
Page of
FIELD TESTING REPORT
CLIENT Ia/fA V/ 5%4 TRACT
W -O- Gzc,-3--.z(7
DATE tL, / - Zj
NAME
HOURS 2--0
LOCATION'S L i,,.. P p_,_, t q
SUPT._ JACCL CONTRACTOR
EQUIPMENT
COMMENTS:
t
isQ�S� Ti
sy: C>
Page of
•Density
,
r1l�Jii�•�__
COMMENTS:
t
isQ�S� Ti
sy: C>
Page of
FIELD TESTING REPORT
CLIENT Alto 117slA TRACT
SUPT. Tq CONTRACTOR 9, e/!ri-
EQUIPMENT
w.0. 6z(;, -8 izL
DATE_Z::
NAME
HOURS
LOCATION 'TtrnFc✓%
COMMENTS:
GeoSoils, Inc.
By: --..
Page of
_�s'i/Y
yM
it -iG//la��L33iiQ
_EN
540
COMMENTS:
GeoSoils, Inc.
By: --..
Page of
FIELD TESTING REPORT
W.O. r.jG t3-2 C_
DATE_ l -z5- -q `/
NAME Z G/iq�Q
HOURS Z 10
CLIENT 4 j11A I/�SfA TRACT LOCATION
SUPT. V�1e-(e— CONTRACTOR Mi c//e✓
EQUIPMENT
Test
No.
Elev. Moisture
or Content
Location Deptn %
Dry
Density
p.c.f.
%
Relative Test
Compaction I Type
Soil
Type
o og $'L / /7.3
/ Z,3 -9
qz.o 5 L
B
y
8 Me/ 13 0
—b
16elo
foDer
t
%�
C°A e G4, c -v m7 A
;
6 r
CK�hi31�l�M�`ll
GeoSoils, Inc.
By:
Paee of
FIELD TESTING REPORT DATE
�7
NAME KiCHAr- 1k
HOURS 3-0
CLIENT_A/f/a
Elev. Moisture
or Content
Location Deptn %
J/�Siii
TRACT LOCATION T �w�•r_c lG
Test
Type
Soil
Type
SUPT.
S/s r.� S Z -_
j qC
CONTRACTOR
EQUIPMENT
Teat
No.
Elev. Moisture
or Content
Location Deptn %
Dry
Density
p.C.f.
%
Relative
Compaction
Test
Type
Soil
Type
OV 7
S/s r.� S Z -_
LJ -1c
J
13
e.
IO
L 61 O v
O
l
A
uc WNL
IN V4- e , %Inu LCq
Iq ce
L'o 1 L,
` 1 L ✓ p.. i \.`
\
\ �.�.
COMMENTS:
GeoSoiis, Inc.
By:
Page of
W.O. 4n, j3 lzc
FIELD TESTING REPORT DATE_,-zs-�y
NAMEE2i Gh/eq✓tP
1 HOURS 5 _ p
CLIENT Alfa V(S7�/+ TRACT LOCATION_EL
SUPT. .lAc (- CONTRACTOR
EQUIPMENT
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
3
e-/
120 7
9Y-
5
c
�-Z
of
/ZZ -O
V3,1
54C
5O
A=-`�
/Z
1,7-L
S
a
esv
"e e-
574 r
5 v a icA
<< 2 A
v -e_
V e
h
n1
QC:
; / v,r
Z
o
/
COMMENTS:
GeoSofls, IC.
By:
By:
Page of
FIELD TESTING REPORT
W. 0.
DATE
NAME y
HOURS .�
CLIENT_ F` 114, \/, s /, i TRACT LOCATION "' • ' ' '"
SUPT
„ C.
CONTRACTOR
EQUIPMENT CnnnDI&fitV"
'I z 14C Q r� r7 l c C-
/e0 cxt
Test
No.
y, Location
Elev. Moisture Dry
or Content Density
Deptn % p.c.f.
%
Relative Test
Compaction Type
Soil
Type
P
10
, t.,^
alj
�rtft
J %7') I 1 U J
Ahl� P
��""
41
a. -J, C1
''
O%► ivO /
OP
' ti Peen;I
r
y6 LkP
r -
& 't M t,
s-
e to
1/M1� r
P f -A A AP
tee ;
�`� 1
•I Y•i ey�0 ti
o4 iw N
I
• r I
;21 LOA /I 09 �(_Q r
Imo •
N � t t
COMMENTS:
GeoSoi is
By:
Page of
FIELD TESTING REPORT
CLIENT A11-4 —V, -SIA
TRACT
SUPT. TAC« CONTRACTOR /-/i P//rr
EQUIPMENT
W.0. 60,& –B–,QC
DATE � - 9 %
NAMEt4,q
HOURS Z.O
LOCATION j ,emNc%,AIc3
®
'RelativeCompaction
ram
! .Z _M
COMMENTS:
GeoSafis Inc.
By:
Page of
FIELD TESTING REPORT
�a.O. 61?6 -S -JC_
DATE 7-1 - y y
NAME !GdA;eckl
HOURS <
CLIENT_ 1tA TRACT LOCATION j--;we-r;✓jCt
SUPT. CONTRACTOR
EQUIPMENT
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density Relative
p.c.f. Compaction
Test
Type
Soil
Type
sz
ye �g�
-�
-s
/Z Ss i 1Z-
sc
�$
B"�
Z- y
/ L-7
i
c a r fin,.
i
�4 i
OTS U —C�ic�
S
i^
iC157
i
I
COMMENTS:
Soils, Jnc.
Byc ,
Page
FIELD TESTING REPORT
CLIENT li , 1.1 !V01,1 TRACT
DATE Z- j - a y
NAME /L ,e114yu'
HOURS
LOCATION r//�• r/rfoj
SUPT. �j/4c/L CONTRACTOR /1 er ler-
EQUIPMENT
-,U ! 41-:7 S�0 5— v e //V 4.:) ,z , 7
Test
No.
Location
Elev.
or
Deptn
Moisture Dry
Content Density
% p.c.f.
Relative
Compaction
Test
Type
Soil
Type
t
(O firtC'.ri/
v:,e(oc•
E+ssY��� rJr GaeA,r
q
,
^-yPIC'e O
..vsn�
.$/0 2 r•y ,'•f _
r �1J �,
...,.
avc�fr�ei/'A
je
el�cl
U
Pr
If/ C, �o
C/ c oCJ
/
1,C1 r
/ !Q 6 a ::,
aCi t 4,
.Na
ow
t
/
�r4
r t�
1
'.p1.51f 7
"'m
r
C
CO?fMENTS :
GeoSnils,,I c.
By. I —
Page of
FIELD TESTING REPORT
CLIENT J/fPI I//SIKA
TRACT
w.o.i ZG i> -2e-
DATE Z-2 cJ
NAME
HOURS �-
LOCATIO\'
SUPT.
jf Ph
Dry
Density Relative
p.c.f. Compaction
CONTRACTOR
rjfr/
AC c�
EQUIPMENT
�ZsO ;-
AN')e
n �/"qcc
Test
No.
Elev. Moisture
or Content
Location Depth %
Dry
Density Relative
p.c.f. Compaction
Test
Type
Soil
Type
AC c�
3'
5 si
' v -P
C •
4 j . Z�
brd SCve
f
r Yi
n4
4t
S evTre.d
L2 IX,4
L+1 O
>
T—
/A,
&rZala ,
Do ,,. rte. ' o
- e•c
o e
S LCO)
a '�'
'
r%
//
•� P
��S P to e-
e -
'P_ . J l O % '
c•I
-J l G i�. ''� L.
12,2 1 C1
COMMENTS: (071 C'e,,-
i- n � rL •ate �,: � 0 [✓ i-1„ � � t ,,. ,ci r i � t p E
L
I VL, I, _ ��1�qe L(' 1. a GeoSoi ls, Inc.
f
sy:
Page of
C/,G,l all
FIELD TESTING REPORT
CLIENT A1TA Vt5�d TRACT
W.O. 60c'-3-pc-
DATE
zc'-i3-pc
DATE Z�Z��`j
NAME j:/CAA,1-:
HOURS
LOCATION
SUPT. SA C!L CONTRACTOR ?W—f e//� r
EQUIPMENT s /a to e -go-- 8
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
P.c.f.
Relative
Compaction
Test
Type
Soil
Type
Sv
.si e4
L-
iz-
/ZZ.7
`?3-
ss-
43 -
s�
i r5� 45
rAcor
t c•
Se
S
i` P
dui
l3vrcl.. o
e
erg
COMMENTS:
ils, Inc.
By: �—
Page of
FIELD TESTING REPORT
w.0. 6Z/G -'5 mac,
DATE Z -3-q4
NAME_2, tAt,A:,A
HOURS y- p
CLIENT A lffi V/S {A TRACT LOCATION
SUPT..4 G/< CONTRACTOR (z
EQUIPMENT
Test
No.
Elev. Moisture
or Content
Location Deptn %
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
clu de T
cJAie-
rv-e-
FP37qnd Cm 5 ir✓ C LChA
f L, 1
HT
ee5 � SI (v `JS
e
V e
5 K
C1 e
(5 ee-
t,
COMMENTS:
Geo`Soils, Inc.
By: \� -
Page of
FIELD TESTING REPORT
CLIENT A 1414 Vfl 5/,+
TRACT
SUPT. J W CLC- CONTRACTOR j-} L et i j r,
EQUIPMENT
':. 0. 6Z6 -,3
DATE
�7AME
:OURS Z
LOCATION i cf i" . (., icj
Test
No.
Location
Elev. Moisture
or Content
Depth %
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
T
; ut
c
r
r
0- e
�v
LAJ e'_S
Ll�'
rrAtc'
rc
Vee- fA
.�
P^
1 r7'
uu
(,cJct�
ks
33 (:
!
I
COMMENTS:
GeoSoils, Inc.
sy\�
Page _42=tL—�-
FIELD TESTING REPORT
CLIENT A I fm V1.4,4 TRACT
SUPT. S Q CSL CONTRACTOR
?.o. GZG , -/?C-
DATE Z - -f"!- -Qy
NAME ��CC.ar�
HOURS/.v
LOCATION j Ll. r(,y(Q
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
5-4'
.5/0 * I
13_ Z
/,/-Y
92 0
g
(�
r�
67
cw
'L
A4
.0
to
42
COMMENTS:
I ic.
By:
Page
FIELD TESTING REPORT
CLIENT A l �A VIS S T A TRACT
LOCATION LOCATION
SUPT. aACx- CONTRACTOR kAI>=jV Y 6r
EQUIPMENT
w.o. ro2(c-a..•�ZL
DATE _::Z-
NAME
Z NAME
HOURS 7—
Test
No.
Location
Elev.
or
DJeptn
Moisture
Content
%
Dry
Density Relative
p.c.f. Compaction
Test
Type
Soil
Type
C"
L /
6 N
S ,I:M 9-- V
N
ter(`
C,9 e
w" _ C
v w (AU3
criAkv.0
v:c
'fAbi�5l1
� a �
�vc•�et`
.moi/ e� c'
rcA
r4
C e ,
efor
✓ o
04; e 5 f 14/01 tsL .
A k.-
6 ennKe
11)
e
S4=9
COMMENTS:
GiqSo- S,
By: 7
Page of
FIELD TESTING REPORT
CLIENT _ A I fa V/SfR TRACT
SUPT. :TAC.lL CONTRACTOR Ni eit �r
EQUIPMENT
LOCATION
a.0. 491�-3-Z-L
DATE Z-//-`jy
NAME 2 xcA-Ar �
HOURS `(-o
Test
No.
Location
Elev. Moisture
or Content
Deptn i
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
-Va19'
12-3
17-7 -0
C? ' -a
Sc-
13
51a f! W9
3— /3"0
/Z3 `;
-0
5t-
I"7
5/0 ev` /0
s/o r /o -S
1Ig-9
C�Z-G
Ste-
O
5/o e
-`/ /o-
,Z
13 -c?
5c-
X-
B k'
c
C CS
-r
9 2
2 _C _
I.�c
e
e
1
�`P, li we Q,0
E _ �
a' -✓.i w
COMMENTS:
GeoSoils, Inc.
By:
Page of
FIELD TESTING REPORT
CLIENT /i/)i4 Ej51.4 TRACT
W.0. 6Z6 -R-R-L'
DATE Z-�
NAME j- C & eCY
HOURS -'/-
LOCATION
SUPT. SACK CONTRACTOR
EQUIPMENT
Test
No.
Location
Elev.
or
Depth
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
Cz
�Slo Q z
3-1
lis- s-
9z-?
c
l Z( -lo
-I
3C
/e
0&57 a
eelCCU- -
CA-,'
e
9Z96,
�-/,,,
p b
w
COMMENTS:
GeoSoils, Irc.
Ey:
Page of
cnou eni.
FIELD TESTING REPORT
CLIENT A(i-A Vts�A TRACT
SUPT. JJAcr-
EQUIPMENT
W.0.CIZ :1 $ —2C
DATE
NAME �lClnri•^c�
HOURS
LOCATION T'-4•,rwj@
CONTRACTOR l -A I eI t -e4—
®
®Moisture
•
%
,
$-
'
~-N
_FIRM
ml-,
VAPM.
�W_
COMMENTS:
Geg90ils, Inc.
Page of
FORM RG11
FIELD TESTING REPORT
W.O.
DATE '-Z -/y- • q y
NAME /< it/%4 • :./
HOURS
CLIENT 1411A \115/A TRACT O3(b ~ I LOCATION ir,�rc ltd
SUPT
EQUIPMENT
CONTRACTOR
10010 C-CVAKOE-
Test
No.
ev. Moisture
r Content
Location %
jDeptn
Dry
Density
p.c.f.
Relative Test
Compaction Type
Soil
Type
ref
to
IV*1
LS
�07t s �
E //e,
A/
A/ -
Y f -,-,A /
E
Z is
ATr(`t34 IC
n
T- r. V r .L
1 - Q 2 r
14 19C
cP C
/ -
S
-e
S 1
COMMENTS: /a 12t�ya,Tiro05etl JIe 2 rr n,1 it LC'('Alet(' S • 1.1egj, 01 `i e
( ,' I PW � %A S (1 n {-r.CQ �n . (•P - r6'fd(�I i S �. i v f) nz S l u P� f.'3 rc+
C".y. l Aelr•I
IA<'lnai/
l �"- bout c'!1 n+1•./ (i `'
eneu en,r
GeoIn • .
By:
Page o
FIELD TESTING REPORT
CLIENT Al t,i V/sus TRACT
SUPT. Z-AC.II-'- CONTRACTOR (i;II�.J
EQUIPMENT
W.O.
DATE Z -/!o - Y 4
NAME Z.tL .,.- _
HOURS �-i -O
LOCATION Te e
Test
No.
Location
Elev. Moisture
or Content
Depth %
Dry
Density
p.c.f.
%
Relative
Compaction
Test
Type
Soil
Type
S
o eµ Z
13 —`I12zSo
-
1
06
r
,Q
1- o v..,
iv. Ya e •
92%
.
COMMENTS:
Gea�Sm�s,�It
By.
Page
FIELD TESTING REPORT
CLIENT AV l Vi5�n
TRACT
SUPT. CONTRACTOR a, eil e.
EQUIPMENT
w.0. 6-z6 3-tz P --
DATE -L
NAME L l KA
HOURS /'0
LOCATION i p V-er i a,
Test
No.
Elev.
or
Location Deptn
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
I Type
Soil
Type
2
k�aw., ,
ICIM Ic�
o
•,
(f a I I -
C-1472,'<
o
/.(27,�UC0 ;r,-z;GE
Com-
(11 i2, s
H ieiI�, rI
.
+e (2 \ _ s
5
i- 11,R
C c
S E CovLSiVv��'i
COMMENTS:
GeoSoils, Inc.
Ey:
Page of
FIELD
FIELD TESTING REPORT
W. 0. 6 Zc - ; —Z. (,—
DATE Z /7 -i
NAME :L
HOURS
CLIENT P.` iC TRACT LOCATION
SUPT. JAC.1e-- CONTRACTOR R,r-o ,
EQUIPMENT
Test
No.
-
Location
Elev.
or
Deptn
Moisture
Content
%
Dry
Density
p.c.f.
Relative
Compaction
Test
Type
Soil
Type
flq
Co A CX,
31c E. �
n
�. e✓
bSr:
r
UN.Su, 013�
,Is
`
COMMENTS :
GeoSoils, Inc.
By:
Page
FIELD TESTING REPORT
CLIENT AIL, h5L; TRACT
SUPT. J ,q C �-- CONTRACTOR
EQUIPMENT
W.O. 624o -R -rZL
DATE 2,3/1111
NAME I va.-r
HOURS `f
LOCATION r, 7-c., _j G
Test
No.
Location
Elev.
or
Deptn
Moisture Dry
Content Density
% p.c.f.
Relative
Compaction
Test
Type
Soil
Type
.ci t Z
-
19 - G OF-
z -C-
.,a L
Z)
a
i e_. z
-
/ i.
c
S C-
L
q
C
GOA cJ'
COMMENTS:
GeoSo, iills„ilnc.
By:
Page �t
FIELD TESTING REPORT DATE E_�
Z
-�7
CLIENT NAME ,ct
SUPT.
TRACT HOURS
— Z , .
�--�
< LOCATION Tc
CONTRACTOR
EQUIPMENT
C•'n� r ,
Test Elev. Moisture
No. Location or Content Dry
Depth Density Relat %e
o e Z P•c.f. Compaction Test Soil
Type Type
a 7 r3
Z d ,L) /3c
� I
93-.N
v �Al A,.,! n`.
Es:
GeoSoils, Inc.
FIELD TESTING REPORT
CLIENT ` —�'�' " -/L( T
SUPT
EQUIPMENT
CONTRACTOR
I
LOCATI
V
w.0. Imo, '�7Ci
DATE Jif
NAME
HOURS
®
®®
••
►Relative
►Compaction
Test
Type
Soil
T
_---__
COMMENTS:
FORM 89/1
GeoSoils, Inc.
By: /I .i:
Page of /
5Fr
I�+v�,.
'��Q`'
,• �.rrr �'7� 'd, "J 1'..yf r,:
r j i::x 1 k yr,C' i,
,ty�,tyLlrWF'�#,
(Fs de trr rrx re"�'
i til ^i L. ia� S
�'tega i:.
sl< ii rr' h
t
t�Nm.,,�A
Zs yTa
T 71 1'••,q v
RIVIE
1
yt
j6691 LILLJBRIDGE�Cw..,
KAY " OLESM POM DOW'
January 8,- 1979
.T Hogan 6 Roy Associates
1027 N. Coast Highway
Suite F
.. Laguna Beach CA 92651
PATRICIA NEMETH - A.I.P. - PL. ANNING DIRECTOR -
fffO LlMON 8l Rffi.ftF/IUOR, RIVIRY•bt: l'All/ORNIA NffI-' -
Buena: Trac*t._y _1 6 0369-2
Landscaping and Irrigation Plans
Gentlemen: fs .
review with respect to the above refevenplans
the
Pld subject pto hecfollowi 8. s
now complete. The plans are . approvedBe su
te
conditions:
1) All above grade irrigation lines shall be galvanized.
This approval shall apply only, to the -.review required by the Planning
Department.
)) All applicable Courtv Ordinances and codes 9, be campliad with in the
design and construction of the plans.
A signed copy of your ,submitted plan.. is returned to you herewith. Should you
have any questions please give us a call.
-- Very truly yours,
RIVERSIDE COUNTY PLANNING DEPARTMENT .
Patricia Nemeth, AIP r Planning Director
5,.
Conrad'Guzkoski, AIP — Senin- Planner "
a.._ cc:.. .Building 6 Satety 1
sea
- - - - - - - - - - -
The above referenced map, having: been. approvedby;--the Bonrd of
Supervisors will not require your signature.. itow"ever, yon may
have conditions to comply irith before -this map may record.
Please notify this 0fficewhen you.are satisfied the MapAS
completed to your natfifaction.
A copy of the.final map was submitted
Lee O. Flint
SKALLER; & LOHR' ASSOCIATES,: INC..
'* 868?SAN MIUUBI. I)81Y8
SUIT
811 N>fWPOSI HR�ON, 04 95860
,ry '7r14.6f1.f899r, -- ' 'ti
Y
r
�fepteisber�9 r 1977'•
4!k"
Riverside -County'
Planning Dep'artment
treat, 9th Floor
4080 Lemon,S
Riverside,,Californiai92501
William Pa3avick'
fr' Attentiop tit
r . '
r ' F
'Subject ,. Tract• 8.3694l, Tract <8369, 2I Tract 8.369
arf
pear Mr.,Padavick:
r'
tints of the revised phur:ing map -
Attached are seven (7) p
for Tentative Tract 8369:
'4" t Originally, a phasing plan was submitted and approved by
your department withTracts 8369-1 and'8369-2 reversed from
t:bat nieun
ently_showron the attached map-
are requesting that you approve'this new phasing plan
,.
r;. wince the final map for what will now"Oe Tract 8369-1 is
close to recordation,.`'
k If you have
any .,questions ortc�mments. please contact me.
;- -Very truly you
ih YINC.
SttALLEP &' LOHR ASSOCIAYr S,
M1
,000 i"
nalcl
ohr
President
Executive Vice
({71 DOi c3 }
Att�chn}enbs
1 �, rf�R � '`ik } � J r, t ✓ ¢ r�^`�.erTd ', u :tom r
RI��7Jrr
PIAN
� VI` t ( j -3 :n � lY r l`Y 4 :p1W�4 1 ,tt .. A 7�•' Y1.
"SURvey'NG ;
LAN .PIV .I Nl3tNFF.RiN(�
COUNTY OF RIVERSIDE
OFF161AL RECWTa
6586
. i/�.le,
itownd
MUMS
eat le
4 i
i
i
•^ikmoi
rvoo
JAL
sees whom ST""T .
JOHN W. 6/WANT *pllMOMt (111) �0►.wf►
CN1W 10f01M1a a
RIVERSIDE COUNTY FLOOD CONTROL AND
WATER CONSERVATION DISTRICT 3
Ow11100L CAL1►011M1. 110"'
5 July 1977
1rJeRs1ne COON I"t
MANNING COMM!'! tbJN
Riverside county
Planning Commission
County Administrative center
Riverside, California
Re: Tract 8369-1
Gentlemen:. (Improvement Plans)
roval for tentati�'e
In accordance with the condittoY
ou dated 19 August 1976,
ions o app
Tract 831,9 set forth in our letter
the following plans have been submitted to the District
for review: --
9-1
1. Improvement Plans by ct Shaper & Lohr1Associates,
5 sheets prepared by;
Inc., -dated 7 February 1977received by the
District 30 March 1977•.
2. Grading Plan Tract pared y Shali4reet f&:LohreAssociates.
e Doccmber 197E prepared by
inc., received by the Distriet,3�,B:.March 1977.
The District.has reviewed. the plan`b11101.1- ritted ant, finds them
ect to flood to�itiol.
satisfactory w>th..resp r,3
V.
STONE ``'•''
j
1nx ' Smbdivisibn Engineer
D
cc Road ePt n yxSafety?
Dept :,o��Buildi 9 5
Z _
Y.'i7f
;i
i.
L'
"PI �u� rQ+rassior
'a 4080';l;Dtwn Street
RiverelAe, CaliT0 is
JOWAM7 3t 14R
0.
RIveraide Coant7 Surveyor's Office;
Riv"Videp Cali}breia y
Subdi in!on Unit ^].*&rams
lideion Ordinance No. 460, _ —._
ticn 5.18 of the BuLd (Subdivider'n Ueae) tua ).•+stinion
e' ee to D=tp�P or 7
ons Unit of approved PentnLi:. :Yrurt
ae indleated IntrAd:on:the attached tentwt.ive mno.
truly yours,
RjyBlsyUE 'C� )JAI NIM; Ct)R41;59I071
w ;4,t,''(,. A.�E.:]ievcpteb - plannlnit:Plr'ctor
e
I
t
C
Josep A
w !
1
� r
s
� r
F
'UNIT OF_�,
6urveyor.'e` Cff1C•
eeL
-. Resl*h Dept
psggt.',ot' Fire protection
>FLood Control E...
E'leon
S .,¢
Coa},'(2*rNr ?
'So, Ca11f t.
t Y 4
}
u ! 4
1Rd:eb
I
t
C
Josep A
1 dards • .ac AT'
}
s
� r
F
SHALLER 8c LOHR ASSOCIATES, INC.
t Nxwpowr BEACB, CA- 92600
860 SAN MIGuIM DRIVE a SUM 8U *
714.644-4808,
December 29, 1976
County Of Riverside RECERED
,e BOX logo
Post Office Riverside, CA 92502 JAN 3 1977
11 Attention: Elfron swigart, RIVERSIDE GOUNW
PLANNING CO"SSM
Subject' Tentative I.;ract NO- 13369:
Dear MS. Swig&rt*
. .1 —'. ..MOunt of $100.00 and
Attached are two checks . one n he
the amount of $4 oo, which ,we a inadvertently omitted
one in U for issuance of Tract
from our transmittal Of this morning,
Numbers 8369-1, 83691-2, and 8369.
Very truly yours,
/SRALLERLOHR ASSOCl
INC.
L. Hugh. iter
PrCject Manager
i
OCtATES INC.
SHALLER & LQIIR AS: 92960
ae6 SAN M GuEL DRIVE
71MA6��.
t:
Vy
.29 r^ 1976'
j.
)(3
Riverside County -
Planning Department
4080 Lemon Street
p.iveraide,.CA,92501,;
Subject: Tentatitro%Tract''�1o• 8369'
rr
gentleman
On behalf of our; client. Kaiser tna
6awe respectfully seg�` ,.
that Tract Number`* be iaaued'tbr Trethe subject Tentative Map
in three mits� ?tact No. 8369�1r' at No. 8369-1, and
Tract No. 8369.
Enclosed are seven (7) copies of the Subject Tentative Map,
reduced to.a Scale of 1"•1001, for each of tof he three gratland
units and two i1) checks00 e i the tlireetractnumbers-
one in the.
he amount of $
pe artment
aIe have Previously cnicated with the Planning p
rslative . to this matter re a nded inter datletter dated lDece7mber 6 , , .
The Planning Department rasps
1976._ 1
t
would,,like'o
IY'at all possible: we obtain the Tract Numbers c,
by at &]e p°11, ,1976:' please- cIall' If additional data or
clarification is needed '
truly_yaurs,
� ,Very
' 1tiS2 n_S�IS,� )I�TyTES, INC.
' r
)ER
gh S
Pro3ect.Manager
-`.f •' . -
LHStC3`;
Sncloeurea Neelsen k
cc: Mr Gilbert O
CIVIL LiNGINEERIN(i
SIMVETINU
LAND pLANNiNG
i
tcuU.TV 4 VT
PL A N HiNG cou"ISSION
;
IL^Y 5, cancs"00. %Ww M-4M1a.
Jew 6,
KAV 11.01.00x: Aad
p"nows DCRECTOM
September W, 19%
eM.1041"W" "Mom
r "let
uw 5089=630 Board of supwrosse"
Onety A&kt&Utt*CLVC Caotar
400 Laws 14%b Floor;
River"", CA 92MI
TMA" 90-1 8369
T.T� XAM SAMW utas
OFM oinstass ftugaaa
TM
zoom AxqM - *WOW caLiftrala
StggNMWMUL WATR=i First
sun or sow"AM
ad atte&ad am"SU"' a" , Li -W
11M abovw-rufs'"M Beim at Ila "SOLM WOZL" at ftptoow
for approval bT 15" plawAns cooldl the C"UMAG llkV&=MWlWMt4
'fte SOP CMt her C*mwiiad With the 7MVM;Aw of
amity Act of 1970 MA. so.
1. No vim tooloAtout With &be u1slowts
plalm"s caefflasion Iowa C1,;
CAvmty Gyral JIM'
be most (of publAA bearucs at 10200 49-01- 611� luo 104,
2ble usttOr "'Ot the Board meet 4wrve". embditiAnauy sn"w"m
pvtowbar 2xt 197C cc vkickL ti-LIL, extended by MLMl ons to
tcatoo4va 1AMP, Majoea the ttgo Llqdt tS
or 418MV99" the mod Board.
of t3a S'AdAv'"r.
stue"ced,
A■ jecwl" D to
RaeJCw%=mm
ac; superoto
Applf
Its
state
Liar
b: gfety'.t2
uV b
I
, , :.4R sfl • x i
suD(t�47e6.� 1atn±m�rxc� �. 39�
TRACT W. 8369
the require+ y' " �7'tli.:stO�e bbu, gchr�u,l.
the LentativB mtbd?vlai.on @hull confora to'
.
eadlSie4 by thAFr: ccmcitione.
tmlese
the fntodiaider siml.l subs me :!•pr!sGr+cL b'i.e
or.
if y grading i6 prc'pcded,
1. m • to the rti mrelda i!vlwty 9nrTcY*r°"
irts of R Ccau�e+ s.cc er �.de Caapte:^ ru, ss @,eroded
four pr •�,
-r_th the Utllfoia R ld ' Cant'Y'!
the 7 t wpali assply to thr Flood
ra
eul'vr cv Gfflca sAwll.. i;'r' ap9mPnL
Ordummee 057. The ^ .
•pArt,.tent e. gnllding
A.
r
Dlettlttt and the
s�
Su:m-i R ncil@ �pprt:�t tb<-tilceteide t:O1M°.'� !3,IT7'ryClr
Phe 1 M:3f6e8 J,. .{1.•.
,71.xeT ahA}�
Q• -ghB e7b�i: d eafst x/1Te1-'Wr, The ^fp`.•�.
pvtlding an
..,
i016fis veived by the
pf',tbs p,t^..
stability and t1w
provide Issemnts for Tcydv»v ali�pec. :r' -mks^ '"`ri.lxtirr.
by ice '.'oa�l r'
The subdiatder sbal'
3. to shall be dledim.•.ted m M^t.'o'C�•
eucl QR@;!tbQ
utilitles r ate - c'^ i
'c ee appr
etnll Be sub.lect
t�iiw
y, Strive Dome formP
COMINSIoaer. j
.ball be i^tt�lel It �c`vtertCr NLt`
x*1'facititiee
Yater and w@aRa di �� . 8@elth lJ!5;•(QIdB" ilttdT 'lad' '�
5' CgaaeY
4
11cm got forth to the Rive r�ido
19f�r a Copy of vhf ch is etcln@ed..
- h ttn Lccal '3rrcY c •t t.•,
E¢ei@ed :throuB rt: er i
6. An appl.xcatine B`+dl . ee o
foi `ar�miirh r„n nn brie c!.r.6
i n :en7
oer CCnmtp gena^r 4'an c_
1; tt r t lighting i+ to be i vt-�.
bed tti ;:vytxliel oc
ISp�po q"m etaftot i •, ;,ting PJv et r' t tr• {'. ntc
: i use..
- is or will be-dei:l::atad .c ps:'.'�
1n@talLet:!+:t of 7G391 dn:, fix' J•....
CrnmtS !iowd I)wyeri neOt. ptlfr t0
shal.}; prcil�le, t5@ ?ollet.'.uB sett
�,..T�..'r sul,dlxider
'llicaral.de ^Aunt` goe<i 1,qa^
..: .. vita: )(�{ i ! �' 4A pl p', ;. COCa`•yitC } t- -
to
<
} a. Bents Cecel_a..lkSce th@ is
, 8-66 foos d<:--' died right, o.” vev•
CoaCrete curb and gutter v.t4n
'atTeetee '^Sr.yroced u
b... Cul de -sac ana11 to t tl �1 �+ vs,",
-1t atr a SG' `+• . s
ounc ete cuab.and 6v t.3 r
�tt^rcr I:': we' tte I^., r• 1 4,.:ir�-'+v�
All'Cthe�:
viStE anc� er ;-Scott - c
�.+..-�q?tvs.•-y.�. .>...e�y r t ':',f'` a "T - p y . f .. ...
'9tc
-:
1. :Banc' r 1 4c3y
'S
width deil'.ca gi 4
r�va Ls s 81911 f/+ '
t'.
t B
Aq
Re '=T'1t
1 r,; n 15i t�OG --d'
. .-. - .n:.. sFPr 1�r1 -f1`.N ,� •� .
or
0
nasaaeo. •--------
• ?OJZZ a pottiaa of Slotiks 16 6 IA Of thaphe 1 6 ana
8369, ds
lator on. 8obdivision
b� bme eboao b7 aaP on file in s-
ep 11, p
ot,8® Dipsaat7..gtate of Caiiforml#i 7f9 Lets.
qmt of ftblie lMath hes rsdaved Taat&CJVa ite-.8369LCM4
i5a p r+e
ting to Plano sad epsoifi-
a wear a7sto9 ahsll be Installed the Saoltb Depaztmmt.
Dations m apPra"°ed b! the Amt eaapany tna aha31 I.R evDnitted
pat�tat prints of [fir p)-sna of the water s7b. , orx+ inch ogaaL
in triplicate, With a a3nfseea scale not
).sea them Sbe
:•: 200 foot. alone �•itb tbo o,.-1Qi.aa1 drpiag, to the tioato goalveip .
yriota sball smow tbs intoznal PSPe diamatar, loowtloa et of tba �_
te: T!Po ffi'9 30 int apecifitatieas end t' alms of
pLsea
'T;nra �� otes to the oeieting
at tba joaatio.-. of Vw a►N ay C tar 7 0. Lha
shall eoaply In ell raapaata Wish Div. 5. Part lrmt!v+ Cade.
Callforots gaeltb a-.d safnt7 rbde;'Callfornia Ad:
Titfa 17. Chspler i. and go"Tc1 Order We-o- ap of fibs . Th OLSliteh
p�soiaaiea of On Stsie of Csll.fa:nia. UbeaPPl7cahla. TM Pa:' eba11
a ragiateeea eo'„!nuer and anter a�,on;+ Wit! !bs :In Tract
c�arditi�� "I mrrif7 that Che diem of film %wcar e±stew in tract
Be. 8769 is !n ateer&mca r.•ilL tfx water a�ntom e�S+sesion pL�e of tM
r Same
Ronabv Calitoraia Wniar DL�tr!ci sal that ibex Eivereldo aC'Mmt'y s�
t~ 'die myat� cru Rdagvato to cxgp 9 _
OSdinauee`
V-469." Th!-1 Co!iiff_exta, *hall Yiane��mntbeauvMrittt4
of the p=aler ton4i i + .
?r ?tba Covnty 9�eyot'atJffic:: to.revthe fi AVm cne aeeka 7r1oL
he,ragaaat for t?:a tarn=rotStw of Lhe-linal;"mP-
wt. otr+a SRrar UL+tt a fRf.
tdia paPc=trrvtt�bsA a stafiexant
from tba.Q"*�ahe ��auhdivief.00 en easaad pros!diep,:
aaaga prttic astnr_t� naah mcg aFnrl'�lona the
�- .. tial us r..y¢.efI" are wwPlmtad, with ibe rddlvr3ot. It will ba 4'
:=-► ?' ?.a �prlCr. to the 'racer
of
Y.. f0!'-t fS'u+C�iri G _Sn(�C nia;'W `hn _ 3,. _
the final ti'm
.M
t3aaain[. ;;naabaaton
frost Ne. 8969'
!later aiatrict awTw=a8
This 4tat4 s £ e Oarx at to the swats of 'the
6lesiiat. rM Parer totem otmeeasll be lartellsa eeeoMiopt end the naalth�if t'
eatiosa ea apptoaed by the dintrfct, the County SetoayoS'
t Pilate o[ the Place of the nater ayat. sball be stimitted !a triplicate.
with the eriwiaal dwolog. to tbO Cowty 9or°a'" p ,Pilots ■ha11 oho+
the fntarsal P diameters location of meobolsa• aamFlate ptatilas. Sipa and
ifiwtiodiaax, and the air+ e! thn esvrre at tho jmatlnn of t1» rse V"
�nS ryrtem. A aiawlo Piet fndiaatinw lotetfoa of eaeat linos sad •rotor
].icer shall be a TeitiOa of the seem*;
sad Profile,&. She p1ege shall be
y��ed sF a tsiietw°A eattu"r sad the..aeeer district with tba fo1U» ",
9 ceitifi-
f "I 4,*USy that. the doPiwa of the @",I eyaea® f.a Sraa< tio. 9?64 !s
eetia0 with the am•sx cyetea arPSOA. aaa Pio of the Barters lhntiafP"' Doter
aaartasaad' tw:Ls sdagaato at thie OrA to tsast
Morriet ns4� that the snare disposal afn tract. This eartlfication sball be
the antiEfpstod wastes from the ProPaoed
a' y�I p poasfblo officialOfthe esror diasriat. Tha:ola+e mast be
salted �'< tlw Cotanty gu mayor a nffica to review at . leant •two easke Viiei
60 itneat fat Eha tnaordetioo of the finmap•. It will be neaew"UT for
abs
®�e�eota to Da aNs Prior to the rocar"t"a of the final aW-
i
t
'- wyrtaa -
.,Qnl. S�R:ar
7a2y tialy:yours•
jXMLD L. @int
pyreetor'af:fn
Richard L ;[Ya
pdodaiatr�civ+
waa7.ih "
k'Y-{
F
!9
v Y�
1.
1
t
^' y
t
I
F
!9
Riverside Cour y i 11 ',i�ai 1:. ".7i Sfd1IM
planning Commission _.
County Administrative center
Rivetside, California
Osntltiaen: Re: 'Tract. 8369
n
Reference is made to `located on,
northerlg
tentative•Tiact.8369
aide of Rancho Vista Drive in the Rancho'California area.
Our review indicates the proposed 'tract is suhJect. to local offsite
atom runoff along portions'of its northerly boundary•. The
developer proposes carrying these flows along with onsite ruaoff
within the interior street system. In acme cases these flows
will be outlsttod frog, the streets into drainage facilities
located between, et
It is noted that eeDtte westerly aendeoes �
indicate an Outlet for flo)+s.tributary
•I' street.
Following are thS,District- s.recommendations:
1. The drainage facility located on lot ,116 and any other
drainage faci3.it.ies that may:be'located between lots must
be concrete lined.
2. 'Improvement plans and &,grading plan showing all drainage
facilities should be sul;n,itted to the District for review
r to recordation of the final map.
and approval prio
;', All. drainage facilities.should.be,located in drainage;.
easements. 1Hese•d-ainage easements ,must be shown on
the.. final m::p along wiih'a note,estati.ng that drainage
'easement§: must hc`3-ept.£rae of',all buYlduxga, .obstructions
and:enrroact�munt;.bY=Iand';ifills.:+;� r .
4 A copy of the firla map Should be submitted to, the r). strict
for:.review' as .l. appLoral' iirior- tn, irecordation
a„ a Very.truly:Moura
L t�1
JV�L BfYYANT �.
Chief £r5inee
IM SON
ROBERT A
pl:inn) ug i.,tyauuar
CC: ltoad Dept. '
Dept. of Bldg ;hgate'y _ —
(4,
w, eaznvr.:
�.
M, was,
e. a aoa wa
7fLOPOM 4*1&)>N14WW
er•n n,clrW
::COAND`
FLOODNTROL
1
RIVER3im:COUNTY
'WATER :.CONSERVATION DISTRICT
:h
19 Augµst,
5i
Riverside Cour y i 11 ',i�ai 1:. ".7i Sfd1IM
planning Commission _.
County Administrative center
Rivetside, California
Osntltiaen: Re: 'Tract. 8369
n
Reference is made to `located on,
northerlg
tentative•Tiact.8369
aide of Rancho Vista Drive in the Rancho'California area.
Our review indicates the proposed 'tract is suhJect. to local offsite
atom runoff along portions'of its northerly boundary•. The
developer proposes carrying these flows along with onsite ruaoff
within the interior street system. In acme cases these flows
will be outlsttod frog, the streets into drainage facilities
located between, et
It is noted that eeDtte westerly aendeoes �
indicate an Outlet for flo)+s.tributary
•I' street.
Following are thS,District- s.recommendations:
1. The drainage facility located on lot ,116 and any other
drainage faci3.it.ies that may:be'located between lots must
be concrete lined.
2. 'Improvement plans and &,grading plan showing all drainage
facilities should be sul;n,itted to the District for review
r to recordation of the final map.
and approval prio
;', All. drainage facilities.should.be,located in drainage;.
easements. 1Hese•d-ainage easements ,must be shown on
the.. final m::p along wiih'a note,estati.ng that drainage
'easement§: must hc`3-ept.£rae of',all buYlduxga, .obstructions
and:enrroact�munt;.bY=Iand';ifills.:+;� r .
4 A copy of the firla map Should be submitted to, the r). strict
for:.review' as .l. appLoral' iirior- tn, irecordation
a„ a Very.truly:Moura
L t�1
JV�L BfYYANT �.
Chief £r5inee