Loading...
HomeMy WebLinkAbout053194 RDA AgendaAGENDA CITY OF TEMECULA OLD TOWN REDEVELOPMENT ADVISORY COMMITTEE A REGULAR MEETING TEMECULA CITY HALL - MAIN CONFERENCE ROOM 43174 Business Park Drive May 31, 1994- 6:30 PM CALL TO ORDER: Flag Salute ROLL CALL: Committee Members: PUBLIC COMMENTS Vice Chairman Nancy Maurice presiding Committee Member Pelonero Bridges, Gray, Jenkins, Maurice, Pelonero, Reed, Walton A total of 15 minutes is provided so members of the public can address the Committee on items that are not listed on the Agenda or on the Consent Calendar. Speakers are limited to two (2) minutes each. If you desire to speak to the Committee about an item not listed on the Agenda, a pink "Request To Speak" form should be filled out and filed with the Recording Secretary. When you are called to speak, please come forward and state your name and address. For all other agenda items a "Request To Speak" form must be filed with the City Clerk before the Committee gets to that item. There is a five (5) minute time limit for individual speakers. COMMITTEE BUSINESS 2 2.1 Approval of the Minutes RECOMMENDATION: 1.1 Approve the minutes of the meeting of March 21, 1994 Redevelooment Status Report (Presentation by City Manager Ron Bradley) RECOMMENDATION: Receive a verbal report on the Old Town Temecula Entertainment Project. Introduction of Redevelopment Consultant. 06/19/94 ConsultinQ Contracts/Old Town Temecula Entertainment Project. RECOMMENDATION: 3.1 Receive status reports on the following: 3.1.1 Tom Dodson Associates - EIR Consultant 3.1.2 Barton-Aschman Associates - Traffic Consultant 3.1.3 Price Waterhouse - Economic Consultant 3.1.4 Wimberly, Allison, Tong and Goo - Architectural Consultant. First Year Capital Improvement ProQram Implementation for the Old Town Specific Plan Presentation by Associate Planner David Hogan RECOMMENDATION: 4.1 Review and provide comments to the RDA on the first year implementation program for the Old Town Specific Plan 5. Discussion of Committee Structure 6. New Business EXECUTIVE DIRECTOR'S REPORT COMMITTEE MEMBER REPORTS ADJOURNMENT Item No. I MINUTES OF A REGULAR MEETING OF THE CITY OF TEMECULA OLD TOWN REDEVELOPMENT ADVISORY COMMITTEE MONDAY, MARCH 21, 1994 A regular meeting of the City of Temecula Old Town Redevelopment Advisory Committee was called to order on Monday, March 21, 1993, 6:00 P.M., at Temecula City Hall's main conference room, 43174 Business Park Drive, Temecula, California. The meeting was called to order by Vice Chairman Nancy Maurice. PRESENT: 6 COMMITTEE MEMBERS: Bridges, Jenkins, Pelonero, Reed, Walton, Maurice ABSENT: I COMMITTEE MEMBERS: Gray Also present were City Manager Ronald Bradley and Redevelopment Agency Secretary/City Clerk June Greek. PUBLIC COMMENTS None COMMITTEE BUSINESS 1, Aooroval of Minutes It was moved by Member Bridges, seconded by Member Reed to approve the minutes of August 3, 1992 as presented. The motion carried as follows: AYES: 6 COMMITTEE MEMBERS: Bridges, Jenkins, Pelonero, Reed, Maurice NOES: 0 COMMITTEE MEMBERS: None ABSENT: I COMMITTEE MEMBERS: Gray Aooroval of Fundine Mechanism for Special Studies - Old Town Temecula Project June Greek introduced City Manager Ron Bradley, who has been selected by the City Council to serve as City Manager for an interim period during the recruitment for that position and outlined Mr. Bradley's background and qualifications. RDCMIN03/21/94 -1- May 19, 1994 REDEVELOPMENT ADVISORY COMMITTEE MINUTES MARCH 21,1994 Mr. Bradley presented the staff report which included displaying colored renderings of the major components included in the plan to develop a section of Old Town Temecula as an entertainment center. The proposal which has been initiated by Mr. Zev Buffman of TZBG, Inc. includes cabaret theaters, saloons, an opera house, an arena, showboat theater and virtual reality theater complex. Committee Member Bridges asked if this proposed development will be done in conjunction with the Old Town Specific Plan. City Manager Bradley advised that any development within Old Town will be subject to the provisions of the Specific Plan. Committee Member Walton stated he does not want to see this project slow down any expansion of existing business or any new business development in Old Town while it is being studied. Robert Lord, Manager of Butterfield Square, asked if property owners in Old Town who wish to make changes to their businesses or expand them, will be able to do so, with no additional constraints as a result of the Buffman proposal. He also stated that he felt the proposed development should not be concentrated in only one portion of Old Town. He suggested it should be spread out all along Front Street. In response to a question from the audience as to if the City would be doing any displacements and if so what was the likely percentage, Mr Bradley said that the plans do not call for removing any significant percentage of the existing developed area. It was moved by Member Walton, seconded by Member Bridges to approve staff recommendations with the understanding that this project should proceed without any restriction on developments which may occur in Old Town Temecula during the period of time that the feasibility research and the project implementation is being completed. RECOMMENDATION: 2.1 Recommend approval of an amendment to the Memorandum of Understanding between the Temecula Redevelopment Agency and TZBG, Inc. (Zev Buffman). 2.2 Recommend approval of an appropriation of $125,000.from the Redevelopment Agency fund balance to Account No. 28-0199-999-5248for use in researching the feasibility of a private/public partnership. The motion carried as follows: AYES: 6 COMMITTEE MEMBERS: Bridges, Jenkins, Pelonero, Reed, Maurice NOES: 0 COMMITTEE MEMBERS: None ABSENT: 1 COMMITTEE MEMBERS: Gray RDCMINO3/21/94 -2- May 19, 1994 REDEVELOPMENT ADVISORY COMMITTEE MINUTES MARCH 21, 1994 Briefing on Amended Judqement in the Matter of Dawes vs. City of Temecula RedeveloDment Aaencv June Greek presented the staff report outlining the proposed changes to the Stipulated Judgement in the matter of Dawes; vs. the Temecula Redevelopment Agency. She advised the committee that the parties have agreed to the amended provisions and that the County of Riverside is currently reviewing the documents. Committee Member Walton stated he objects to the actions of the Redevelopment Agency in agreeing to eliminate the requirement to apportion revenues between Old Town and the rest of the Project Area. He stated he feels the Old Town area should be guaranteed a portion of the Tax Increment revenues to prevent the Agency/Council from spending all of the Redevelopment Agency funds on other projects. Vice Chairman Nancy Maurice said she sees this action as intended to increase and not limit the Old Town area to the previously specified $30 million, in light of the increase of the total tax increment during the life of the plan. It was moved by Committee Member Walton, seconded by Committee Member Reed to advise the Redevelopment Agency that the Advisory Committee protests the action taken with regard to the judgement because the Advisory Committee was not asked to be involved in the negotiation of the amendment. The motion was unanimously carried. EXECUTIVE DIRECTOR'S REPORT None COMMITTEE MEMBER REPORTS None ADJOURNMENT It was moved by Committee Member Walton, seconded by Committee Member Bridges to adjourn at 7:20 P.M. Vice Chairman Nancy Maurice June S. Greek, Secretary, Redevelopment Agency/City Clerk RDCMIN03/21/94 -3- May 19, 1994 DRAFT PROFESSIONAL SERVICES This Agreement was made and entered into this __ day of__ 19_, by and between the City of Temecula ("City"), a municipal corporation, and Tom Dodson & Associates, a California Corporation here'mafter called ("Consultant"). The parties hemto mutually agree as follows: 1. SeXyices. Consultant shall perform the tasks set forth in Exhibit A attached hereto. 2. Performance. Consultant shall at all times, faithfully, industrially and to the best of his ability, experience and talent, perform all tasks described in Section D of Exhibit A. 3. Payment. The City agrees to compensate the Consultant for its services based upon the costs set forth in Section C of Exhibit A. The total cost of this contract shall not exceed $75,800, which represents the total compensation to be paid to Consultant by City for all work to be done by the Consultant. The total cost for this contact shall include the costs of duplication for all reports and documents described in Exhibit A, The City Manager may approve additional payments, not to exceed $10,000.00 for additional or supplemental work. Such costs for work under this contract shall be reimbursed only if the work is approved by the City as to its nature, type, amount, and staff performing the services. The City shall withhold ten percent (10%) of the cost of this contract until all work on this project, as specified in Section A of Exhibit A, has been completed to the satisfaction of the City. Consultant shall submit invoices upon the completion of the work activities contained in Exhibit A, except that such invoices shall never be submitted more than once in any thirty (30) day period. Such invoices shall specify the completed work task(s) included on the invoice, the total amount invoiced to date, and the total amount outstanding. Within thirty (30) days of submittal of any invoice, the City shall either approve said invoice or return it to Consultant specifying any objections. Payment shall be made within thirty (30) days of the approval of the invoice. 4. Amendments. This Agreement may be amended so long as such amendment is in writing and agreed upon by both the City Counc'~ and Consultant. 5. Ownership Of Documents. Upon satisfactor~ completion of, or in the event of termination, suspension or abandonment of, this Agreement, all original documents, designs, drawings and notes prepared in the course of providing the services to be performed pursuant to this Agreement shall become the sole property of the City and may be used, reused or otherwise disposed of by the City without the permission of the Consultant. The Consultant may, at its option and expense, elect to have the work products for this project copyrighted joinfly with the City of Temecula. P:\STEFFENS\CONTRACT.TQH 5/18/96 d~h 6. City Responsibility. The City shall make all reasonable efforts to cooperate with Consultant in the completion of this project, including but not limited to: a. Designating a single representing authority with whom Consultant can fulfffi Consultant needs. b. Promptly notifying Consultant of any dissatisfaction with Consultants performance or any deviation from the tasks specified in Exhibit A. c. Providing City documents and reports to Consultant at no cost. 7. Termination. The City may terminate this Agreement without cause so long as written notice of intent to terminate is given to Consultant at least ten (10) days prior to the termination date. In the event of termination, Consultant shall be paid for the services performed. 8. Indemnification. The Consultant agrees to indemnify and save harmless the City of Temecula, its officers, officials, employees and volunteers from and against any and all claims, demands, losses, defense cost, or liability of any kind or nature which the City, its officers, agents and employees may sustain or incur or which may be imposed upon them for injur/to or death of persons, or damage to property arising out of Consultants acts or omissions under the terms of this Agreement, excepting only liability arising out of the sole negligence of the City. 9. Consultant Staff. The Consultant Project Manager, Tom Dodson shall be responsible for the professional services required to complete the activities identified in Section B of Exhibit A. Modifications to Consultant's staffing, including subconsultants for this project, shall be made only with the prior written approval of the City. 10. Status of Consultant. Consultant is an independent contractor in all respects in the performance of this Agreement and shall not be considered an employee of the City for any purpose. No employee benefits shall be available to Consultant in connection with the performance of this Agreement. Except as provided in the Agreement, City shall not pay salaries, wages, or other compensation to Consultant for performing services hemunder for City. 11. Term. This Agreement shall commence on April 1, 1994, and shall remain and continue in effect until tasks described herein axe completed, but in no event later than June 30, 1995. 12. Subcontracts. The Consultant shall not enter into any subcontracts for services to be rendered toward the completion of the Consultant' s portion of this Agreement without the consent of the City. Upon termination of this Agreement, Consultant's sole compensation shall be for the value of service rendered to the City. P:\STEFFENS\CONTRACT.TOH 5/18/96 d~h 13. Default. In the event that Consultant is in default for cause under the tens of this Agreement, the City shall have no obligation or duty to continue compensating Consultant for any work performed after the date of default. Default shall include not performing the tasks described herein to the reasonable satisfaction of the City Manager of the City. Failure by the Consultant to make progress in the performance of work hereunder, if such failure arises out of causes beyond his control, and without fault or negligence of the Consultant, shall not be considered a default. Any disputes regard'rag performance, default or other matters in dispute between the City and the Consultant arising out of this Agreement or breech thereof, shall be resolved by arbitration. The arbitrator's decision shall be fmal. Consultant shall select an arbitrator from a list provided by the City of titme retired judges of the Judicial Arbitration and Mediation Services, Inc. The arbitration hearing shall be conducted according to California Code of Civil Procedure Section 1280, et seq. City and Consultant shall share the cost of the arbitration equally. 14. Notices. Notices shall be given pursuant to this Agreement by personal service on the party to be notified, or by written notice upon such party deposited in the custody of the United States Postal Service addressed as follows: a. city: Attention: City Manager City of Temecula 43174 Business Park Drive Temeeula, CA 92590 b. Consultant: Tom Dodson, President Tom Dodson & Assoc'mtes 463 N. Sierra Way San Bemardino, CA 92410 The notices shall be deemed to have been given as of the date of personal service, or three (3) days after the date of deposit of the same in the custody of the United States Postal Service. 15. Entire Agreement. This Agreement and any documents or instrument attached hereto or refen'exl m here'm integrate all terms and conditions mentioned here'm or incidental hereto supersede all negotiations and prior writing in respect to the subject matter hereof. In the event of conflict between the tens, conditions, or provisions of this Agreement and any such document or instrument, the tens and conditions of this Agreement shall prevail. P:\STEFFENS\CONTRACT.TOH 5/18/9~ dNh 16. Sickness or Injury of Consultant. Except as provided in the Agreement, City shall not pay salaries, wages, or other compensation to Consultant for performing services hereunder for City. City shall not be liable for compensation or indemnification to Consultant for injury or sickness arising out of performing services hereunder. Consultant shall secure workman's compensation insurance. Upon request of Consultant, the City shall add Consultant to the City's workman's compensation policy and the Consultant to the City's workman's compensation policy and the Consultant shall reimburse the City for the cost of said insurance premiums. The parties hereto have executed this Agreement on the date and year above written. CONSULTANT CITY OF TEMECULA By: By: Tom Dodson, President Ronald H. Robeas, Mayor ATTEST: June S. Greek, City Clerk APPROVED AS TO FORM: Peter M. Thorson, City Attorney P:\STEFFENS\CONTRACT.TQ~4 5/18/94 d~h TOM DODSON & ASSOCIATES 463 N. SIERRA WAY SAN BERNARDINO, CA. 92410 (909) 884-9700 FAX (909) 889-8050 April 1, 1994 Mr. Ron Bradley City of Temecula 43174 Business Park Drive Temecula, CA 92590 Dear Mr Bradley: On behalf of Tom Dodson & issodates CIDA), I would like to thank you and Mr. Br, rr,, an for the oppommffy to submit this proposal to assist the City of Temecuia to comply with the C~lifomia Fnvironmental Q~lity Act (CEQA) for enterT,lnment projects designed to implemem the Old Town Temecuia Specific Plan. In developing a scope of work to ensure compliance with the CEQA, Ihave reviewed the Specific Plan, the City General Plan and related documents that address the activities in the project area at a general level This letter proposal outlines those tasks and the work effort that I believe will be necessary to ensure full compliance with the CEQA in'the shortest Before proceeding with the proposal coments, k is appropriate to discuss the status of our information at the t~me thi~ proposal is being prepared. We have not yet defined the specific scope of the environmental documentation that will be requ/red to support a decision on the proposed project. This CiI'C~3m~I'llv~C~ requires me to include a Iratuber of as~-,nptions in the scope of work and the cost e~rn.te that my need to be revised when the scope is ~n-j~-ed in the n~ar future. I have a~tempted to be comervative in my assumptions, but I expect we will have to m.ke sore adjustments to my contract i,~mediately following completion of the Initial Study and Ndtice of Preparation. Where appropriate, I have clearly stated asmmptious in preparing ttis proposal The final product of TDA's work effort, s~,mm-,'iz~d below, vail be a focused ~m, ironmental impact report (h'l'~) which can be used for individual project approvals as they are occur. In accordance with the State CEQA Guidelines, Sections 15153 and 15168, this EIR t~. bc used by the City and developers as a program environmental doc~m~nt which provides the oppormnky to rninirni,e flitlife ellvironmental reviews and/or to focus only On those new, specific project issues that r.~y arise when a sped~c development under the Specific Plan is implemented. Given the City's decision to prepare an I=_IR, we believe that this approach will be the most informalive and efficient process for implementing the proposed project- The proposal that follows outlines the specific tasks and subtasks that will be peffomed to provide the 1~11~ for the ent~cainm~nt projects being proposed. The fees, schedule and other items follow the proposal ~ SCOPE OF ~/ORIC Task h Prepare Project Description Once aur. b. oriz~d ~o proceed with Lhis environmental document, TDA will review all of the information develol~d to daze and prepare a proje~ description with s~fcient detail that it can be used to prepare t~ Initial Study ~th ~ substantiation. Alternatives that will be coasidered in the EIR will be deftnod as par~ of ~ effort. The project description ~ identi~y all proposed aalviries, localion of individual enter~;-?-~.nt facilldos, proposed land uses, and type of ar.~.ivifies at a level of de~'l commensurate with the current stage of pI"nni'g I will provide as much ehboratlon as poss~le W allow evaluation and forecast of environmenul impacts. Graphics will be provided in support of. the projec~ doscripdon and I inlend to rely upon Mr. BnFr~an and the Cky for some of the basic map materials. " A to~.al 30 hours is alloozed w this ~ The projea description is th~ dellwrable produa for ~ task. I hav~ aliocatod ten hours to mee6-~ ~ S~ff and Mr. B-~--on rh;.~ t~k The projea doscripdon can be completed wid~in two weeks after aurlmrlz~on to proceed is rec~,ed from the ~ . All work will be performed by TDk . ' Task 2: Initial Study, Notice of Preparation, and Scopin~ Sessions Aker re~i~dz~ the informa~on prowled to ~ ~ ~ ~ ~ ~- B.~sn; I h~ ~cd ~ ~ ~ for ~ ~oje~ may not h~ to a~ ~e~liq Fo~ Some of Study ~ ~ m~hsr~-fl~o- Study ~ ~d ~-HaHon for teeh-{~ ~ for ~e ~ojea A draft of the Te;t{~[ Stlady WI~ be compler~l and subfled to the City for review and c~-,-,~-, Based on r. lz co~-~-onLs from the C_.aly, the Initial Study will be ~,,-w~,-d and the issues that will be addressed for this project hu< will be icl~tif_xcd. TDA val work ~ the C~ to prepare and distn'bute the Notice of Prcpaniion (NOP). The NOP w~ be t:m.,an, i~ed with the t.16sl Study and its ~ndinBs to the intc,--,.ged public, paracularly the Old Town b,,a---qs and zegulalosy ~ Th~ S..1 clet~--"-.rinn d iSs~s thor will be w~l be made after P..~ipc of c~..~-e-r~ on th~ N0P and inp.t dining proposed scoping .---~,4,ms, i[ the City wishes to hold such Duri~. the 30~y NOP rcvic, w pc6.od I recommend din[ the C. ii3, hoM ~ ~ ~q ~ a p~ ~ p~;-Z~d~f~d~ ~A~~ny~d~ It is TDA's ln~en~ to pror=ed with preparalinn of the Dra~ ~ (DIKIR) ;-,~,-alalely followin~ ~nxizatlon m proc~d ~ rigs pr~e~'., b= it will ent be c~npler~d .~.'1 a~r receipt dNOP and scopln~ m~in~issues hav~ be~n cornpied, evaha~ed and, wh=re a~.t,~,,p. hre, ha.~.a in the scope dfi~ D~w'~ Auy -,~a~,,ual issues raised in NOP and scoplng me~6-Z a~.--..-~t, m'li be e~Im~i ~ th~ ~ for co-currcnc= before ind,a'-._e them in the scope of the s=lx<. This t=a will be complemd upon aSreement with the Ci~, on r. be ~--! ~:ope d the DtU.K based on a johr review of commems and ~.a cemem: re,-,~-,-~.~a-r~.-~ by C. Uy. 2 A total 50 hours is allocated to tiffs task. The project description for this project wlil be utilL~d as the basis for making impact forecasts as par of this task. TDA has allocated 12 hours to meetin~ with Staff and the appllc.~at. The draft Initial Study c. aa be completed w~th{n one week following completion of the project descrlptiom The completed h~{r!~l Study ks the primary deliverable product under this task. The final scope of the Draft EIR will be deter~;,,ed within five days ahcr receipt of the final NOP and scoplng meeting comments. A memorandum identifying all environmental issues to be included in the DSr. IR will be the final work product delivered to the City under this task. All work will be performedby IDA. Task a: Prepare Screencheck Dr'all EIR for Internal Review Under this tacit IDA will prepare the DEIR as an vdm~ni~trativo draft for internal review. The following subtasks will be completed: : Subtask 1: Dev~loo the Environmental Settin~ Data Base Utlli-4,g the data ganeratocl specifically for this project, TDA will Fepag the e~sthg environmental setllng for each of the issues being ~Yaluated in the ER. I am ass,,,'~,,Z that the followins ~viromnental issues v/dl require ohm--1 data to be geaer~ed befor~ they can be fully acldre'-~e,i: II'affic and circulation, biological resources, cultural resources, noise, and air qual~. Fees for preparing ~ technical u:ports for inclusion in the DEIR are dlseussed at the end of this t~lr cli~,,,~,~om It is anticipated that TDA's effort for developing the environmental setling chta base for th~ EIR, inehding review and incorporation of the te~'h,~cal reports, will requi2re approximately 80 houn. Subtask 2: Prepare the Environmental lmvact Evaluation IDA will ,,fl~b. the data from the projet= description and first subt-.~, to forecast poten~l en'/izxmmenml irapans from developing and oper'~-g the proposed enlert~b,,,,enl facilities. The irapan forecast will be as specitie as por.,~'hle for th~ proposed proj~t and affected environment. l~i~t~on measures will be identified, as appropriaz~, for each environm,-nt~l issue with pote~.nti~lly ~iZn~fivm.,r impacts. The impacl: -,~-lysls form~r used by IDA is a follows: project impact., ~..,.nhvlve impact. m~t;~ti~n measures, m~oiclable adverse environmental irapan (hr. inding a~y irapans caused by ]mpl~'~'~fi~Z mitigation measure). To the exXent fea.~le, tmtential environmental effeas v/ill be qn~ntified; however, I ~nticipate t~t some impact forecasts v/ill be qualitative. TDA has allocated a total of ~0 hours to this complete this sub~lr; ss,~rn~Z th,~t no addkinnal teeh~;e-~l sindies are require& Tom Dodsnn wffi prepare and edit all of the 6n~l t~n for this section of th~ doc~me=k ' 5nbt~k 3: Pr~ar~ All Remalnin~ ~:IF, Sections' Theendproduetdrh'~,-thr~','subt=~histheScr~acheckDlr. l. Kforzr~iewbytheCTw/. 1twfllbesnbmined to tl~ City for z~view, co,-,---r, and appto~ I have conduew. d disen~tlons with my subco~,,lt--t~ and technical staff ~ n~ f~ ~ ~je~ ~ ~t ~e,..~t~ for ~ ~...,~t,~ · Biologlcul Resources Cost Estimate: 'el0,000 (assumes 100 acre biological survey, including a Gnatcatcher Survey) Cultural Rc~oure:~ Cost Estimate: L¢,OOO (does not iadudc any additional work w~rh;. the Old Town axca) · Noisc Cost Esthnatc: $7,500 (inchdes traffic and rant noisc forecasts) T~k4: Air Q.,my Cast F, sr~m,tc: $10,500 (includes a CO ho~spot mocl~lin~ ,-~ly~is for ~c most affc~cd intcncclion) Finalize Draft EIR, Publish, and Distribute 'IDA wH1 meet wirjx thc City to coilca all C~mmCllL~ on the Sc~ccnchcc~ Dr..Lt<. Thcsc comments w~d bc rcspondcd to and a Draft ~ for public distx~ufion will bc compilccl and p'~u~cd for distr~urlon. TDA will supply ~he Ci~/widx ~ bound copies d r~c DEIR for dism'bufion and will arrange to have copies dclivcrcd to the State Clcar~-gho,,--;-, if requested. I ~.rieipate publl-h;-~ a second volume of tceh-lcal appendices that ~ bc awtilnhle upon req-*-f Ten copies of the terh-i~l appendices will be provided to the City under thi, proposal. TDA has allocated 30 hours to this f~4c; inchd;.S clerical staff suppor~ A~ the cnd of ~ task, the DEIR vall be dism'butcd for thc 45-day public rcvicw and comme.~ pcrlocL Task 5: Prepare Response to CommellB 'IDA will mcct with ~he CLl'y to review proposed responses to all commems rec=ivcd on ~hc D~ut Onc~ gcncnl a~rccmcnt on ~hc comcnt of rcsponscs is ob~ncd, th~ va'll bc pr~parcd and a draft responses to c~,mcn~ doatmcnt will be delivered to the City for ~-.! rc.Acw and comment. We ~ndcipat,, alloc'~,~ng 80 horn of effort to this r~de; ind-a~-,,- 12 horn of meet~ with the City. If mjor n~w issues arc x-Ascd that wcrc previously not addressed and rh~r the ~ COllChld22 III~ bC addr~-~',i in the Final ~ TDA will pcx~orm ---lyscs bascd on mutual a~P,~nc=l an the scope of work and a mo~l!t%d fee, Tho cnd produa of tlais cfforC will boa F'mal ~ a,a,'hhl~ for c~fifxca~m. Fifty (60) copies of th~ Final EIR will bc provld~d ~o the'C_Lty for use and dlsnibmiom These responses to cammc~s will be prcparcd in a scpant~ volume, unless th~ Civ/ mqucs~s tha~ a comblncd F'mal ~ do~,,-en~ bc prcparcd. .. Task ~: Prepare Flndln2s d Faa lmcl Sla~es~nt of Overriding Coasiderafion. implcme=l~,n5 the proposed proiect that ,'-,~,,t be mi,i~red. Based on my past .eat~'icncc with projects of this tTpc ~ ~ i e=pe~ ,h=, it will be neemary to prepare a' ~,,,-r.,... and ¢~..-,..,.r. dc.--,-cnr. TDA ~ m ~,~,o,~ p, ojccts with ,~;s~,,.f impact This dc-~,,,,~-,,, wonld'be prepared by Tom Dcdson and requires appr~-~B, 40 horn of effort. h will be prepsred to suppoR the ~ as 'Candidate F,-,r,%--' and will rcquir~ appr~,--~'r|y 8 hom's of mcc~_~ with City as part d tlz total effort. Task 7:,~"-.4 Hesrin~s TDA will mend up to thrc~ public h,-,,-~ as pax of the p~posal above. A total of 15 houn havc been alloca[ed for tiffs r~lc Additional m.-~,~,_~ will be btled at an hourly rsie d $100/hour. Thi~ concludes the description of the scope of work and the inks that wffi be performed to deliver a 1~-~I EIR to the Cky for use in mnlcqnS a decision on this project 4 B. PROIECT MANAGENIECe1' TDA is the contra~or for th~ project and Tom Dodson will serve as Projea Director and prin~ary author of all deliverable repcr~ outlined above. Bm Gstlin will assht with eftore to assemble dam and assist wkh preparing environmental impact evaluations. On behalf of TDA, Tom Dockson will make all ~.M decisions regaxding the content of the document for the contractor, excluding specific technical issues that require a registered professional to sign technical reports. Tom Dodson will also be the primary author and final editor of all vn'ir~en CEQA doc~ments submitted to the City. C i~,E PROPOSAL The following fee infoF.~tion is provided. Please keep in mind that m~merous assumptions have been included in these esHrn~les and they could change, increase or decrease, as more information becomes available and the specific scope of the EIR is defined. . Task 1: Proper: Proiect DescHD6o]} A/I work uncut this t;~d~ ~ be performed by TDA for a tntsl fee of T4,000. If the projet= description i~ changed mffter k ks ~,~rhlly accepted and ~-~;-~, th~ fee w~l hav~ to be adjusted by mutual agIe.-ment between T'DA and the City. Ta~k 2: Initial Stiltiv. Nofic~ of Prepara~om and S,cooing Sessiom All work under ~ task will be p~rformed by TDA for a total fee of $5,000. If impaa forecasts must be conducted for a r~ed projea dest:ripdon a&er th~ Initial Stmty ~ completed, the fee ~11 have to be adjusted by mutual agreement between TDA and t.~ C~. Task 3: Prevar= the Screencheck Di-aft ~ The work under this task w~l be performeel by TDA and a~x:~u]~,-t, TI~ ~timated fees for this as fonow~: Total fee for Task 3 is $48,000. FffecopiesdtlzS~Drn/z~.t~wffibedeli~r~tmtl~C~yforrv~iaw and co~-ent. I will coordlna~ all te~-~,~l smdles m e=sm~ ~h,r tl~ ~[crnnarion ~quired is provided. My proposed snbco=~,lt~-~ for th;~ · Biiilogical Resourc~ · Noise Mr. Michel I,~ch, TDA's ~ archaeologist, ~11 pretmr~ tl~ ~ re~ounz~ inv~fgation for this project. 5 40tnamdc~ax'tandS:MOd~='nctmfnr~mndr,--;=~,', TamDcdsmws~l--..,~ aIXk~****? 6 D. PROPOSED SCI47~DUT,E TDA proposes to complete thi~ project on the following schedule: Day 1: Day ]-5: Day 21: Day 28: Day 30: Day 60: Day 75: Day Day 10O: Day 150: Day 160: Day 175: Proicct k authorized by City/blological survcy Project description i~ submktcd to the City for review and comment Pro]co dcscr~p~on h ~-~l~d/O~hcr tc~h-~ca~ smd~cs ~-~datcd Drs/t Initial Study ks submitted to the Cky for rcvlcw and co~cnt Preparation of Screencheck Draft EIR bc~n~ Technical snlclics submktcd to TDA/Cky for review and comment Tcch-ical studies fmalizcd Scrccnchcck Draft EIR h aubmktcd for rcv~cw and Draft E~R ~s publL~cd for public di~tn'bution, 45 day rcvlcw RCSpOIISC~ [O COmmClIIS arc submktcd for review and approval Final FIR is completed and ready for certification Fmaln~ of FaC and Statement o[ Ovcrrldlng Comaldcrafio~ submktcd to Ci~ for rc~icw a~d approval, heating can bc held on the pro]cc~ I believe th{~ is an achievable schedule, but an opfim*~ic one that may have to be modi~cd to accommodate additional environmental issues a~ter the scOping process. CONCLUSION TDA can provide support services to co .mpletc the total CEQA review process for th{~ project in a m~nncr that is legally defens~le. We can provide z~ of the techn{cal investigations and compile these studies into a comprehensive, tmdersmndablc EIR for the City Council to use in ranking its decision on the proposed project We believe that the schedule and fee oufi~ned above represent a renlktie e~mate of costs and 6me for preparing an EIR for the City: I look forv~rd to working with the City and i~ this proposal is acceptable, an authorized agent of the City can sign th~ loner proposal which is surelent for TDA to initiate work on thk project Othemise, it can be incorporated into a City contract or purchase order, as appropriate. I~ you have any questions regar~,ng th~ proposal or related issues, please feel ~rcc to give me a call Sincerely, Tom Dodson Authorized to proceed, City of Tcmecula Contracting Rcprescnm~ve 7 PROFESSIONAL SERVICES DRAFT This agreement was made and entered into this 15 day of April , 1994, by and between the City of Temecula ("City"), a municipal corporation, and Price Waterhouse , a Partnership ("Consultant'~. The parties hereto mutually agree as follows: Services. Consultant shah perform the tasks set forth in Exhibit "A" attached hereto. Consultant shah complete the tasks according to the schedules set forth in Exhibit "A". Performance. Consultant shah at al times, faithfully, industrially and to the best of his ability, experience and talent, perform aH tasks described herein. _Payment.The City agrees to pay Consultant monthly, according to the payment schedule set forth in Exhibit "B" attached hereto, based upon actual completion of the above tasks. This amount will not exceed $ 75,000.00 for the total term of the agreement unless additional payment is approved by the City Council; provided that the City Manager may approve additional payment not to exceed ten percent (10%) of the Agreement; but in no event more than $10,000.00. Consultant will submit invoices monthly for actual services performed. Invoices shall be submitted on or about the first business day of each month, for services provided in the previous month. Payment shall be made within thirty (30) days of the receipt of each invoice. Amendments. This Agreement may be amended so long as such amendment is in writing and agreed upon by both the City Council and Consultant. Ownership of Documents. Upon satisfactory completion of or in event of termination, suspension or abandonment of this Agreement, aH original documents, designs, drawings, and notes prepared in the course of providing the services to be performed pursuant to · this Agreement shah boeome the sole property of the City and may be used, tensed or otherwise disposed of by the City without the permission of the Consultant except as such use by the City is restricted by Exhibit "A": Tasks to be Performed and Terms of the Engagement and ConsultaB retention of work papers. Termination. The City may terminate this Agreement without cause so long as written notice of intent to terminate is given to Consultant at least fifteen (15) days prior to the termination date. In the event of termination, Consultant shall be paid for the services performed. 5 Indemnification. The Consultant agrees to indemnify and save harmless the City, its officers, officials, employees and volunteers from and against any and aH claims, demands, losses, defense cost, or liability of any kind or nature which the City, its officers, agents and employees may sustain or incur or which may be imposed upon them 10. 11. 12. for injury to or death of persons, or damage to property arising out of Consuhant's acts or omissions under the terms of this Agreement, excepting only liability arising out of the sole negligence of the City. Status of Consultant. Consultant is an independent contractor in all respects in the performance of this Agreement and shah not be considered an employee of the City for any purpose. No employee benefits shall be available to Consultant in connection with the performance of this Agreement. Except as provided in the Agreement, City shah not pay salaries, wages or other compensation to Consultant for performing services hereunder for City. City shah not be liable for compensation or indemnification to Consultant for injury or sickness arising out of performing services hereunder. Term. This Agreement shall commence on April 15 , 1~__._44, and shall remain and continue in effect until tasks described herein are completed, but in no event later than December 31 , 1994. Subcontracts. The Consultant shah not enter into any subcontracts for serfices to be rendered toward the completion of the Consultant's pertion of this Agreement without the consent of the City. At all times, David Petersen shall be primarily responsible for the performance of the tasks described herein. Consultant shall provide City with fourteen (14) days' notice prior to the departure of David Petersen from Consultant's employ. Upon such notice, the City shah have the option to immediately terminate this Agreement. Upon termination of this Agreement, Consultant's sale compensation shall be for the value of service rendered of the City. Default. In the event that Consultant is in default for cause under the terms of this Agreement, the City shah have no obligation or duty to cominue compensating Consultant for any work performed after the date of default. Default shall include not performing the tasks described herein to the reasonable satisfaction of the City Manager of the City. Failure by the Consultant to make progress in the performance of work hereunder, if such failure arises out of causes beyond his control, and without fault or negligence of the Consultant, shah not be considered a default. Any dispute regarding performance, default or other matters in dispute between the City and the Consultant arising out of this Agreement or breech thereof, shah be resolved by arbitration. The arbitrator's decision shah be final. Consultant shall select an arbitrator from a Hst provided by the City of three retired judges of the Judicial Arbitration and Mediation Services, Inc. The arbitration hearing shah be conducted according to California Code of Civil Procedure Section 1280, et secr. City and Consultant shah share the cost of the arbitration equally. Notices. Notices shah be given pursuant to this Agreement by personal service on the party to be notified, or by written notice upon such party deposited in the custody of the United States Postal Service addressed as follows: 13. 14. 15. a. City: Attention: City Manager City of Temecula 43174 Business Park Drive Temecula, CA 92590 b. Consultant: Price Waterhouse 400 North Ashley Street Suite 2800 P.O. Box 2640 Tampa, FL 33602 The notices shall be deemed to have been given as of the date of pemonal service, or three (3) days after the date of deposit of the same in the custody of the United States Postal Service. Entire Agreement. This Agreement and any documents or instrument attached hereto or referred to herein integrate all terms and conditions mentioned herein or incidental hereto supersede all negotiations and prior writing in respect to the subject matter hereof. In the event of conflict between the teas, conditions, or provisions of this Agreement and any such document or instrument, the terms and conditions of this Agreement shah prevail. Liability. Except as provided in the Agreement, City shah not pay salaries, wages, or other compensation to Consultant for performing services hereunder for City. City shall not be liable for compensation or indemnification to Consultant for injm'y or sickness arising out of performing services hereunder. Consultant shah secure worker's compensation insurance. Upon request of Consultant, the City shall add Consultant to the City's worker's compensation policy and the · Consultant shall reimburse the City for the cost of said insurance premiums. Licenses. Consultant and subconsultant shall obtain all necessary licenses, including but not limited to, City Business Licenses. Costs for "necessary licenses" shah be considered a reimbursable expense of the Consultant as referred to in Exhibit B. The parties hereto have executed this Agreement on the date and year above written. David C. Petersen, Managing Director of Price Waterhouse Development Advisory Services Group Print Name and Title CITY OF TEMECULA By: Ronald H. Robeas, Mayor APPROVED AS TO FORM: City Attorney ATYEST: Jun S/S.~ek, Ci~ty'C~' 1~._.) Price tthterhouse {t} EXHIBIT "A" TASKS TO BE PERFORMED AND TERMS OF ENGAGEMENT Price 'hterhouse },latch 23, 1994 Mr. Ronald Bradley Interim City Manager City of Temecula 43174 Business Park Drive Temecula, CA 92590-3606 Dear Mr. Bradley: Thank you for inviting the Price Waterhouse Development Advisoz7 Group to submit this propesal-agt't'ement to provide eeonomio planning services to the City of Temecula. This letter will describe our understanding of the background and objective of the assignment, ptcpesed seope of service,,, qualifications to perform these services, time and budget requitcments, terms of the engagement and authorization to proceed. If, after reviewing this letter, you believe modifieatious to this proposed scope of services would better suit your needs, we would be pleased to discuss this with you. Background and Objectives of the AssiS~nment The City has adopted a Specific Plan for Old 'gown with the overall objective of creating "a dynamic Old Town commercial and residential core...providing a viaHe economic setting for local and tourist commercial uses,..and residential uses...". The plan includes zoning, development regulations, incentives and procedures to accomplish this goal. Our understanding of the specific means by which this goal will be accomplished and the economic planning issues to be considered is based on: · Review of Old Town Temccula Specific Plan · Discussions with Dave Dixon, former City Manager and yourself over the past 3 months · Review of proposed entertainment development prepared by Zev Buffman · · Tour of Old Town March 2 and subsequent review of maps, plans, aerial photo and video of area provided by your staff The renovation and redevelopmerit of Old Town will be dependent, in large pan, on attracting a sufficient level of non-resident visitors to the area to support the retail shops, food/beverage establishments and lodging facilities for the Tourist Retail Core (TRC) and the Highway Tourist Commercial (ItTC) areas contained in the plan. These non-resident visitors will be drawn to the Old Town area by existing special events and Mr. Ronald Bradley Page 2 attractions {historic buildings, wine/balloon festivals, antique shops, etc.) and the proposed entertainment facilities to be developed by Mr. Zev Buffman, namely: Opera House: Cabaret Theaters: Wild West Arena: Showboat: 950 seat proscenium theater 2 @ 600 seats each 4,800 seat "show tent" 600 person capacity (450 seated) In addition, the Buffman plan includes several additional physical facilities and theatrical presentations which will link the primary entertainment or "anchor" theaters to Old Town with: · Saloons · Virtual Reality Presentations · Production Studio (IV, Radio, Recording) · Outdoor Entertainment · Competitions, games, festivals, award/tribute shows, etc. It is planned that the anchor theaters and support amenities will be fully integrated and compatible with other major elements of the Old Town development: commercial, civic and residential. Moreover, the "anchor" entertainment establislunents will be the primary attractions which draw the additional visitors needed to support the rcdevelopment of Old Town - to make it, in the words of the Specific Area Plan, "an economically viable setting." The economic and financial planning for the development of this entertainment complex must include sufficient economic analysis to insure the following objectives are met: 1. Define the approximate level or scale of development (number and size of theater) sufficient to: · Establish a "destination attraction" and · Retain the long term commitment of a qualified developer/promoter/manager and · Praluce sufficient net cash flow to obtain capital funding and · Support related uses in the TRC area 2. Estimate levels of visitor activity generated by the theater complex and requirements for the infrastructure and other activities needed to support that Mr. Ronaid Bradley Page 3 activity (parking, traffic flow, site size and location requirements and destination marketing). 3. Estimate the level or range of economic and fiscal impacts generated by the proposed development. These are the objectives of the market and financial analysis described as the proposed "Scope of Services." Scope of Services The work pregram designed to determine the sufficient scale of development and its support requirements is divided into two phases each of which is preceded by a work session and concluded with a written and verbal report. The purpose of Phase I is to define the size of theater development which could be supporteel fa3m the existing level of non-resident visitors to Temecula. Phase II will evaluate the reasonableness of, and requirements for, increasing the level of visitation to Temecula. The purpose of the three work sessions precedingfollowing-each phase is to budget the time (and recognize the necessity of) convening the Price Waterhouse economic study team with the developer/manager and client to: 1. Refine and clarify objectives and requirements of the Specific Plan, City, Developer and the proposed enterprise: the theater complex. 2. Communicate and evaluate study methodology, reliability and findings. 3. Insure that the timely progress and quality of the study, desired by all three participants (client, developer, and Price Waterhouse) is obtained. Phase III will estimate the fiscal (new taxes) and economic impacts generated for the city and county by the new development. The work plan, time and budget requirements and scheduled communications with the developer and client are outlined in the following sections. Mr. Ronald Bradley Page 4 Phase h Theater Development Supported bv Existin~ Visitor Market Following Work Session one, a series of analytical tasks will b~ undertaken to quantify the existing soume of non-resident visitor market and visitor characteristics. Each visitor market segment will be quantified in terms of: Primary Market: Secondary Market: Tertiary Market: 1 to 11/2 hour drive time - "Day THppers" 6 to 8 hour drive time - "Overnighters" Beyond 8 hour drive time - "Vacationers" Characteristics of visitors will be evaluated in terms of: · Purpose or primary attraction: · Mode of transportation · Avenge length of stay · Seasonality · Average party size · Peak time characteristics · Spending per person · Adult - child mix special event, specialty retail, etc. Based on the assessment of visitor attendance levels to Temeeula, we will evaluate the scale of theater development which can be supported. This evaluation will be defined in terms of: · Types of theaters · Number of seats/type of theater · Show content/style/quality The report will contain a description of the reseamh findings and sufficient statistical data to support our major conclusions. Approximately one week following delivery of the Phase One report a work session will be conducted to further discuss existing visitor market characteristics and our Phase I findings. Phase II: Market and Site'Requirements to Sustain Proposed Theater Comnlex Each of the visitor market segments identified in Phase I will be analyzed to determine Temecula's ability to increase its annual level of visitation, improve market penetration rates and destination marketing program (budget) needed to capture increased Mr. Ronald Bradley Page 5 visitation. The viability of the proposed theater development complex will be evaluated in terms of its sustainability from increased visitation. Based on this evaluation, we will then describe absorption pace, phasing or buildout period for the proposed development. The second pan of the Phase II work program will include a description of the r~levant physical requirements and characteristics (site location, site area, parking and circulation) which determine the marketabillty of the complex. Phase llh Economic lmnaets of the Entertainment Complex and Fiscal Impacts Resulting From "New" Spending Annual or recurring economic impacts generated from opomtions of the proposed entertainment complex results from "new" dollars spent by non-resident attendees. Additionally, spending by area residents which no longer 'qeaks" from the local economy due to events being held in Temecula also represents "new" dollars. Combined, this new spending generates income and jobs for local area residents and new sales revenue for local businesses. In this task, we will estimate total "new" dollars resulting from the entertainment facility operations. Spending estimates will be based on financial operating data and average spending per attendee. Estimated "new" dollars will be used to datermine total impacts through the use of an econometric model which will calculate total impacts from subsequent spending "rounds" within Riverside County. Economic impacts will be expressed in terms of changes in sales volume, income and number of jobs created. Data describing the economic impacts (total sales, jobs and income) will be utilized to measure the estimated fiscal impacts or increases in local taxes. The two to three largest tax revenue impacts (e.g. hotel, sales, etc.) will be estimated. A final report describing all Phase I, Phase II and Phase III findings and methodology will be submitted one week prior to the final work session. Mr. Ronald Bradley Page 6 Price Waterhouse Qualifications and Experience Price Waterhouse began its U.S. operations in 1889 and today employs 10,000 pn3fessional and technical staff in 100 offices throughout the United States. Annual revenues for the U.S. Finn exceed $1.3 billion. The Price Waterhouse World Firm is located in 111 countries in 448 offices, with annual revenues in excess of $3.6 billiota The firm's goal is to serve clients whose primary needs are: · Credibility and objectivity · Client service · Worldwide reputation Fortune 500 executives were reeendy asked to rank the Big 6 accounting firms in various categories. On a scale of 1-10, survey participants ranked Price Waterhouse highest in ethics; Price Waterhouse's score of 8.5 was the highest individual firm seot~ in any category. Client service is the comeatone of Price Waterhouse's overall business strateg~r. It is what we are all about and the way in which we distinguish ourselves among professional services firms. Our "Client Bill of Rights" reflects our commitment to superior client services. Our internal client service initiatives include programs to define, enhance, recognize and reward client service to ensure that our services are perceived as the best in the marketplace. As clients you have the right to: · Professional Excellence · Be Serviced by Professionals Who Understand Your Business · Proactive Advice and Creative Business Ideas · Independent Viewpoints and Perspectives *' Effective Communication · Wide Range of Prefessionals Resources . Dependable Service · Service Anytime and Anyplace · State-of-the-Art Technology · Value-Added Service Mr. Ronald Bradley Page 7 Price Waterhouse is the sixth largest accounting firm, however, it leads the Fortune 100, Forbes 100 Largest Multinationals (29% market share) and Dow jones Indastrials (47% market share) in number of clients. Regarding combined sales of clients, Price Waterhouse ranks tirst with $671 billion, representing 26% of total sales among the Fortune 500. No Big 6 firm is more strategically focused on and organized to serve multinational companies than Price Waterhouse. Price Waterhouse ensures the continuity of its reputation through its program of recruiting the Best and Brightest. The results of this pregram are berne out by objective measures. As noted in a survey published in the trade magazine, Professional Services Rev/ew, "a greater percentage of [laW] hires are the top students from the top sehocls than any other firm." The fn'm's achievements for quality work have been recognized by its peers. In 1990, Price Waterhouse achieved an unprecedented accomplishment: We were then and remain today the first and only national firm to have undergone a peer review resulting in an unqualified opinion and no letter of comment. Hailed as a "historic" event by a member of the professinn's Public Oversight Board, this landmark accomplishment set up apart as the quality firm and demonstrated-our commitment to the highest standards of professional excellence. In 1993, history repeated itself. As in 1990, our 1993 peer review, conducted by Deloitte & Touche, has once again resulted in a clean opinion with no letter of comment. It is particularly rewarding to have the firm's impressive performance acknowledged by our peers-not once, but twice. We take pride in this achievement, and, at the same time, recognize the need to intensify our efforts to ensure that we maintain this standing. Among the ~rm's clients are major multinational firms, including: · Mean Aluminum · Amoco · Bausch and Lomb Bristol Meyers · Chevron · Eastman Kodak · E.I. du Pont de Neroours · Exxon · F.W. Woolworth · Goodyear Tire and Rubber · Hewlett-Packard · IBM · MCI Communications · Scott Paper · Seagram · Shell Oil · The Watt Disney Company · W.R. Grace Mr. Ronald Bradley Page 8 The Price Waterhouse Development Advisory Group is devoted exclusively to the economic analysis of leisure facility development and operations and specializes in: · Market Demand Utilization and Studies · Development Strategies and Planning · Management Operations and Analysis · Financing and Funding Plans · Expansion Planning and Building Programs Studies conducted by Price Waterhouse are unique because of our: · Track record of quality, credlh~lity and objeetivity · Staff experience in public assembly facility development and operations analysis · Continuous Projeer Dh'eetor involvement Our professional support and participation in the leisure facilities industry includes: · Stadium and Arena Managers Annual Report: The Development Advisery Croup surveys all North American major league venues and summarizes results to report annually on occupancy, operating costs, attendance, operating trends and management issues. Amphitheater Report: The Development Advisory Group surveys all outdoor amphitheaters in major U.S. market areas and report summarized results annually on number of events, attendance, attendee spending, operating costs and management concerns. Convention Center Annual Report: We survey every primary convention center with over 100,000 square feet of exhibit space and approximately 50 smaller facilities throughout the United States and Canada. We report annual convention and trade show average occupancy, attendance, food and beverage per capita sales and effective rental rates. International Congress Center Annual Report: We have been selected to conduct the annual survey of member facilities for an international association of congress centers. This information is presented by geographical location and size of all major centers and inchdes attendance, food and beverage sales, occupancy, rental revenue and exhibition space occupancy. Mr. Ronald BradIcy Page 9 Data Base and Building Files: We maintain current records on building floor plans, financial data and city information for nearly every major facility in North America. Prefessional Conferences and Seminars: Our staff adclress five to ten prefessional associations annually on subjects associated with planning,. development and operation of public assembly facilities. These groups include International City Managers Association, International Association of Auditorium Managers, International Convention Center Conference, Association Internationale des Palais de Conaxes, the Urban Land Institute, Japan National Tourist Organization and others. The active involvement of our staff in the activities of these organizations keeps us abreast of industry trends, facility development and related information. Publications and Research: The results of our reseamh and analysis ate frequently published in such journals as Urban Land; Convene; Amusement Business; Conferences, Exhibitions & Incentives; rrade~hmv Week; Facility Manager and Practicing Planner. Staff members have also been quoted in numerous magazines and newspapers such-as the Nero York Times, Wall Stre~ Journal and Washington Post. David C. Petersen anthomd a book, published by the Urban Land Institute, entitled Convention Centers, Stadiums and Arenas. The activities and resources of the Development Advisory Group evidence our commitment to improved leisure facility development and operation. Firm Qualifications Daytona Beach. 'q'ake Part If' Daytona Beach, Florida Mr. George Mirahal President, Chamber of Commerce (904) 255-0981 Price Waterhouse staff analyzed tourist visitation trends in Daytona Beach and competitive markets. The analysis resulted in development of a strategic action program for potential tourist attraction development near Daytona Beach. Mr. Ronald Bradley Page 10 Grand Cypress Resort O~ando, Florida Price Waterhouse staff performed a series of market and financial analyses in conjunction with strategic planning for golf course facilities and goff oriented rental resort villas. Lexington Downtown Develonment Commission Lexington, Kentucky Mr. Thomas Minter President, Lexington Center (606) 233..4567 Analyzed development trends and potentials in downtown Lexington, including detailed evaluation of demand for commercial office, retail, food and beverage, hotel and miscellaneous urban uses in the downta area. Prcjections served as basis for development of policies for the Lexington Downtawn Development Commission and successful development of Lexington Center Corporation, a mixed-use retail, hotel and public assembly facility. City of Virt~nia Beach Virginia Beach, Virginia Mr. Mark Wawner Contract Administrator (804) 4304567 Performed a market and financial assessment for a proposed 16,000-18,000 seat amphitheater to attract summer concerts to the Virginia Beach area. The tasks in this study included: - Market area overview - Competitive and comparable facilities analysis - User surveys - Building program recommendations - Estimated utilization - Financial operations analysis - Development cost analysis - Economic and fiscal impact analysis - Alternative funding and development scenarios - Site analysis Mr. Ronald Bradley Page 11 Convention and Visitors Bureau Arlington, Texas Mr. Charles R. Kiefer Deputy City Manager (817) 459-6106 Examined advantages and disadvantages of alternative management structures for the City of Arlington. Identified and selected cities of comparable siz~ with similar demographic and financial characteristics. Evaluated form of organiT-ation, board of directors composition and authority, funding characteristics and perceived advantages and disadvantages of the various organizational forms. Evaluated Arlington's CVB performance and recommended methods to improve operations. Team Resumes Resumes for the following staff are included in the "Resume" section. · David C. Petersen, Managing Director · David Allsteadt, Practice Manager · Nancy L. Vegas, Senior Consultant · Mike Biledean, Senior Consultant Time and Budget Requirements The proposed scope of services will be provided for a fixed fee of $75,000, plus travel expenses for the three planned work sessions. This fee will be payable according to the following schedule. $25,000 15,000 * 15,000 * 10,000 * I0,000 * Due upon authorization to proceed Due four weeks following authorization to proceed Due upon delivery of Phase I draft report Due upon delivery d Phase II draft report Due upon delivery of Phase IH draft report $75~000 * Total fee plus travel costs * Plus travel costs Mr. Ronald Bradley Page 12 Engagement Terms Our services will not include ascertaining the legal and regulatory requirements applicable to the proposed project, including zoning, other state and local government regulations, permits and licenses. Further, no effort will be made to determine the possible effect on this project of future energy shortages or present or future federal, state or local legislation, including any bend restrictions, envirenraental or ecological matters, interpretations thereof or subsu~ace conditions. Our report will contain a statement to that effect. Estimates of future financial operations will be based on the proposed work pregram, estimates and assumptions from previous studies, information developed from supplemental research, knowledge of the industry and other sources, including certain information that you will preyire. These sources of information and ~ of significant estimates and assumptions will be stated in our report. Some assumptions inevitably will not materialize and unantieipated events and cireumstanees may occur, therefore, actual results achieved will vary from the estimates, and the variations may be material. Our report will contain a statement to that effect. Further, we will neither evaluate management's effectiveness nor be responsible for future marketing efforts and other management actions upon which actual results will depend, and we will so state in our report. The terms of this engagement will be such that we will have no obligation te revise the report to reflect events or conditions which occur subsequent to the date of the report. However, we will be available to discuss the necessity for revision in view of changes in the economic or market factors affecting the project. Our report will contain a statement to that effect. Report and analysis of future financial performance included therein, are intended for the information of the porson or persons to whom they are addressed, solely for the purposes stated therein and should not be relied upon for any other purpose. Neither our report nor its contents, nor any reference to Price Waterhouse may be included or quoted in any offering circular or registration statement, prospectus, sales brochure, appraisal, loan or other agreement or documentation without prior written consent. Mr. Ronald Bradley Page 13 Price Waterhouse does not, as part of its economic and financial analysis, perform an audit, review or examination (as defined by the AICPA) of any of the historical or future estimated financial information, and therefore does not express any opinion with regard to same. Authorization to Proceed ff the prepesed scope of services described in this letter meets with your approvaL, you may authorize us to proceed by signing one copy of this document end returning it to us. This proposal will remain in force for a period of sixty (60) days. Should you have questions, please contact David Petemen at (813) 222-5406. We appreciate the opportunity to present this prepesal and look fortyard to workin~ with you on this engagement. Very truly youre, David C. Petersen DCP&sw Authorization to proceed: Name and Title Date EXHIBIT "B" PAYMENT SCHEDULE $15,000' $25,000' $15,000' $10,000' ~10,000' $75,000' Completion of Work Session One, site visit and interviews Four weeks following Authorization to Proceed Upon delivery of Phase I draft Upon delivery of Phase II draft Upon delivery of Phase III draft *Plus reimbursement for out-of-pocket expenses not to exceed consultants actual costs. APPROVAL CITY ATTORNEY FINANCE OFFICER CITY MANAGER TO: FROM: DATE: SUBJECT: CITY OF TEMECULA AGENDA REPORT Old Town Redevelopment Advisory Committee Gary Thornhill, Director of Planning/2~' May 31, 1994 First Year implementation program for the Old Town Specific Plan Capital Improvement Program Prepared By: David W. Hogan, Associate Planner RECOMMENDATION: That the Advisory Committee review and provide comments to the RDA on the first year implementation program for the Old Town Specific Plan. BACKGROUND The Old Town Specific Plan was reviewed by the Old Town Redevelopment Advisory Committee on March 2, 1993 and approved by the City Council on February 8, 1994. At that time, the City Council authorized staff to begin carrying out some first year activities in the Implementation Program. The Implementation Program in the Specific Plan includes a six-year schedule of feasibility studies, economic development programs, physical infrastructure improvements,and business recruitmentand retention activities. The Implementation Program for the Old Town Specific Plan will be incorporated into the City's Capital Improvement Program (CIP) later this summer when the CIP is amended. The purpose of this report is to submit the initial implementation activities to the Old Town Redevelopmerit Advisory Committee for your review and comment. A copy of the implementation program is located in Attachment 1. Implementation of the Specific Plan may be changed because of the proposed regional entertainment facility in the Old Town area. Initially, several of the first year implementation activities are being deferred until after a final decision has been made on the Buffman proposal. The proposed first year activities are as follows: 1. Alignment and design study for the Santiago Road/First Street Bridge. Estimated cost: 9100,000. 2. Support for the Main Street Program. Estimated cost: 975,000. 3. Old Town Signage, Billboard Lease. Estimated cost: 912,000. 4. Old Town Logo Design Competition. Estimated cost: 98,000. R:\OLDTOWN\WESTHAIN.RAC 5/17/94 dwh 1 5. Construct the Old Town Gateway Arch, Estimated cost: ~ 12,000. 6. Prepare a streetscape design and prepare construction drawings and specifica- tions for West Main Street Demonstration Project. Estimated cost: $275,000. 7. Construct drainage improvements on Third and Sixth Streets. Estimated cost: ~ 100,000. 8. Design and construct the Sixth Street Parking Lot Improvements. Estimated costs: e515,315. The estimated cost for these eight projects is ~1,097,315. This will be funded with both redevelopment and general fund sources. If the proposed entertainment project is not constructed, the need for the following deferred projects will be reconsidered: Parking Assessment District Feasibility Study - $12,000, Underground Utility Feasibility Study - $10,000, Business Improvement District Education Program - ~ 15,000, and the Preparation of the material for the Business Recruitment Assistance Group - el 7,000. Because of its importance, staff has already begun the process of selecting a consultant to design the West Main Street streetscape improvements. On March 22, 1994, the Planning Department sent out requests-for-proposals to landscape, urban design, and planning consulting firms to prepare a detailed streetscape design for West Main Street and the standard specifications for all future street and boardwalk improvements in Old Town. A copy of the Proposal Guidelines is located in Attachment 2. Attachments: 1. Implementation Program for the Old Town Specific Plan 2. Proposal Guidelines for the West Main Street Demonstration Project R:\OLDTOUN\UESTHAIN.RAC 5/17/94 dwh 2 ATTACHMENT NO. 1 IMPLEMENTATION PROGRAM FOR THE OLD TOWN SPECIFIC PLAN R:\OLDTOWN\WESTHAIN.RAC 5/17/94 dwh 3 F. Old Town Capital/Promotional ImI~rovements Program - 1994-2000 1. Introduction Many physical improvements, economic development programs, and more detailed studies have been recommended in previous sections of the Old Town Spedtic Plan. Some improvements and programs require near term implementation while others are less critical and need to be assessed by the City as the Old Town area approaches buildout of its land use potential. Other projects, particularly traffic improvements are not listed here because actual implementation will be determined as future development entitlements are granted in and around Old Town. 2. Year One - 1994 Estimated Cost a. Studies Title/Description Parking Assessment District Feasibility $12,000 Conduct feasibility study to determine appropriate size of assessment district, projected income, assessment amount by property, legal description and recommended per space cost for reimbursement. Underground Utility Feasibility Study $10,000 Conduct feasibility study to determine which utility lines in Old Town can/should be underground. Assessment of probable undergrounding costs. Main Street Program Application Once Main Street Organization is established, an application for recognition as a Main Street Program community should be prepared and submitted. City Staff In-Kind Services City of Temecula Old Town Specific Plan V - 36 First Street Bridge/Alignment Improvements Conduct first year design studies for intersection realignment and construction of a bridge over Murrieta Creek with two lane facility and installation of traffic signals at Front Street Old Town Sixth Street Parking Area Provide public parking at Sixth and Front Streets area of Old Town. First year design studies. b. Economic Development Programs/Descriptions Old Town Facade Improvement Program* Estimated Cost $100,000 $65,315 $5O,000 Provides grants or loans to eligible rehabilitation work to commercial facades. *Program described in greater detail in previous section of Spedtic Plan Establish Main Street Organization/ Coordinator/Office $75,000 V - 37 Organization of Board of Directors, Articles of Incorporation and Bylaws. Salary for coordinator. Office lease/offi'ce costs. Billboard Sign Lease The City in conjunction with the Old Town Merchants or Chamber of Commerce seek to lease and advertise Old Town on two billboards along b15 - one to the north of Old Town and one to the south. City provides 50% of billboard' s base rate for first year, with decreasing involvement in future years. Merchants contribute other 50% of billboard lease rate and all administrative costs and sign design. City approval necessary. $12,000 City of Temecula Old Town Specific Plan I I I I I I I I Estimated Cost Business Improvement District (BID) Educational Program/Legislation $15,000 During the first year, the existing Merchants Association working with the City should undertake an educational program that will explain the advantages of a BID. The support of the local business is especially crucial if a BID is to be successfully implemented. City Council enables BID and contains study to assess BID Feasibility/Fees/Income. Logo Design $8,000 The City should distribute a Request for Qualification to graphic artists to prepare an appropriate "western" style logo for Old Town. This logo can be used on various merchandising, advertising and streetscape elements. c. Physical Improvements Old Town Gateway Arch Sign $12,000 The City would construct an arch sign that would span over Front Street. This sign would announce Old Town, particularly to first time visitors. The sign should be located over Front Street just before Moreno Road. West Main Street Demonstration Project $275,000 The City would target West Main Street (between Front and the Creek) for a comprehensive streetscape[facade/signage program. Improvements may include new paving, curb and gutter, parking restriping, boardwalk sidewalk program, facade improvements, signs, construction documentation, specifications, drawings. City of Temecula Old Town Specific Plan V - 38 V - 39 Drainage Improvements Catch basins and drain to creek at Sixth Street. Drain line from freeway to creek at Third Street. Old Town Sixth Street Parking Area Construction of public parking facility at the intersection of Sixth and Front Streets d. Business Recruitment and Retention Establish Old Town Business Recruitment Assistance Group The Old Town Merchants Association, assisted by the City, should establish a BRAG Team. Members should include local business and Old Town Merchants Association representatives and City officials. Prospective new business owners will be referred to the BRAG Team by area property owners, City Officials and the Chamber of Commerce. Prepare Demographic Material for BRAG Team The Team will need a general information piece about Old Town, to be supplemented by appropt'iate business specific information. The piece should be prepared by an advertising firm under the supervision of the Old Town Merchants Association and the City. Develop Business Attraction Programs The Old Town Main Street Coordinator, working with the BRAG Team and City officials, will begin to develop programs and incentives such as economic development loans and SBA loans to attract new businesses to Old Town. Estimated Cost $100,000 $450,000 In-Kind Services $17,ooo No Cost City of Temecula Old Town Specific Plan 3. Year Two - 1995 a. Studies Title/Description Circulation - Traffic Study New by-pass route along Diaz Road, Felix Valdez Avenue and Pujol Street Feasibility Study and Preliminary Cost Estimates. Circulation - Alignment Study Santiago/First Street/Front Street Study to provide engineering level alignments and preliminary Cost Estimates. First Street Bridge/Alignment Improvements Conduct second year studies for intersection realignment and construction realignment and construction of a bridge over Murrieta Creek. b. Economic Development Programs/Descriptions Old Town Facade Improvement Program - Year Two Maintain Main Street Manager Salary/Office - Year Two City contribution decreases while merchant (BID) contribution increases. Billboard Sign Lease - Year Two City contribution decreases while merchant (BID) contribution increase. Estimated Cost $40,000 $30,000 $150,000 $50,000 $60,000 $20,000 City of Temecula Old Town Specific Plan V - 40 V - 41 Special Events In addition to successful Rod Run and Farmers Market, Old Town Main Street Coordinator introduces two new annual events. Budget for promotional materials. Graphic Marketing Materials Main Street Coordinator should develop and produce and distribute (with professional help) printed material advertising Old Town. Maps brochures, calendars. Sell advertising in each to offset costs. Physical Improvements Public Parking Lot Property Acquisition The City should seek to acquire a vacant or underutilized property in the Village Square Assessment District and as close to the Front Street/Main Street intersection as possible. Funds from the Parking Assessment District would be used to repay the City. Establish Residential RehabiLitation Program The .City of Temecula, through its Redevelopment Agency, should establish a single family rehabilitation loan program, targeted to the Old Town area. Low interest loans, made to qualified low and moderate income home owners (up to 120% of County median income), and secured with a Trust Deed against the property, can be used by property owners to repair and rehabilitate the interiors and exteriors of residences in Old Town. The program can be funded through the Redevelopttient Agency's Low and Moderate Income Housing Fund. Estimated Cost $10,000 $20,000 +/- $300,000 $100,000 City of Temecula Old Town Specific Plan Estimated Cost d. Business Recruitment and Retention Continue BRAG Team - Year Two The BRAG Team needs to continue for several years to be successful. Business Attraction Program Once the Old Town Main Street Coordinator has developed a program of incentives to attract and assist new businesses to locate in Old Town, implementation must be started. Loans and loan application assistance with City Permit processing, and assistance in meeting design guidelines need to be provided. 4. Year Three - 1996 a. Studies Title/Description None Antidpated b. Economic Development Programs/Description Maintain Main Street Manager Salary/Office - Year Three City contribution decreases while merchant (BID) contribution increases. Old Town Facade Improvement Program - Year Three Billboard Sign Lease - Year Three City contribution decreases while merchant (BID) contribution increases. In-Kind Services In-Kind Services $40,000 $50,000 $15,000 City of Temecula Old Town Specific Plan V - 42 V - 43 Nonconforming Sign Removal Program - Year Three This program encourages nonconforming sign owners to remove signs given the financial incentives available through the City. The most sought after nonconforming signs will be roof and pole signs. During this first year the City may: offer free removal of a nonconforming Sign; offer an incentive bonus of $1,000 for removal of nonconforming roof and pool signs; offer and incentive bonus of $500 for removal of other nonconforming signs; or provide free sign design services to provide replacement of conforming signs. Workshops for Business Owners Workshops for business owners in Old Town will assist businesses in becoming as successful as possible. Topics include "Friendliness Training" and effective merchandising and displays. Special Events Once several new annual events have been established, Main Street should consider expanding the Farmers' Market into a regular Market and Street Fair that would run throughout the year. Designating one night a week for a Street Fair, and offering food vendors, entertainment, and farmers' produce will attract Temecula area residents and visitors into Old Town. Main Street should coordinate with Old Town merchants to encourage them to remain open during Street Fair hours. Estimated Cost $40,000 $3,000 Main Street In-Kind Services City of Temecula Old Town Specific Plan Estimated Cost c. Physical Improvements Public Parking Lot/Restroom Construction $180,000 The City should construct a parking lot on the previously purchased (second year) site which is close to Main and Front Streets. Improvements should include trees, paving, striping, buffer walls, and landscaping. As buildable area permits, public restrooms should be constructed as part of the overall improvement. Include striping four tour buses. First Street/Front Street/Santiago Intersection Unknown Per recommendations of the previous study(1995), the City should seek bids to totally redesign and signalize this intersection. First Street Bridge / 37' x 200' Two-Lane Bridge over Murrieta Creek $1,000,000 Residential Rehabilitation Program Continues ~ Year Two $100,000 d. Business Recruitment and Retention BRAG Team Continues - Year Three In-Kind Services Business Attraction Program Continues - Year Two In-Kind Services 5. Year Four - 1997 a. Studies Ti~e/Description Mini Bus/Wagon Shuttle Feasibility $10,000 The City would contract to assess current and future need for a full or part time shuttle for Old Town. City of Temecula Old Town Specific Plan First Street Bridge/Alignment Improvements Estimated Cost $250,000 Conduct final construction drawings/ documents. Felix Valdez Realignment $62,500 Design studies for realignment proposal. Reassessment of the feasibility of allowing Sidewalk Vendors in Old Town. Unknown b. Economic Development Billboard Sign Lease - Final Year $Z500 Maintain Main Street Manager/Office - Year Four $30,000 Old Town Facade Improvement Program - Final Year $50,000 Nonconforming Sign Removal Program - Year Two $20,000 c. Physical Improvements Front Street Reconsff'uction Project $370,000 The City should target a centralized portion of Front Street (between Fourth and Third) for a similar paving and sidewalk program to the improvements on West Main Street. Improvements would include new paving, curb and gutter, the board sidewalk program, special intersection art/paving, and trees. V - 45 City of Temecula Old Town Specific Plan First Street Bridge/Alignment Construct intersection realignment and bridge over Murrieta Creek. Traffic signals. Street improvements from Front Street to Pujol Street. Old Town Sixth Street Parking Area $402,180 Construction of public parking f~cility at the intersection of Sixth and Front Streets. Front Street Repair/Upgrades $100,000 For the remainder of Front Street that is not covered under the Reconstruction Project. Street repairs, sidewalk repairs. Public Signage Program $35,000 Street Furniture/Public Lighting Program $145,000 Residential Rehabilitation Program Continues - $50,000 Third Year Street Tree Program (initial emphasis on Front Street) $20,000 Felix Valdez Realignment Construction $250,000 Construct realignment improvements in conformance with the Old Town Specific Plan. d. Business Recruitment and Retention Brag Team Continues - Year Four Business Attraction Program Continues - Year Three Estimated Cost $2,500,00O In-Kind Services In-Kind Services City of Temecula Old Town Specific Plan V - 46 Year Five - 1998 a. Studies/Description Sixth Street Bridge Feasibility Study and Preliminary Costs Conduct Feasibility Study to determine route, fight-of-way requirements, length, costs and other data. b. Economic Development Programs Maintain Main Street Manager Salary/Office Noncon/orming Sign Removal Program - Year Three c. Physical Improvements General Curb and Gutter Improvement Separate fund for general appearance upgrading of various streets in Old Town. Shopping Center Facade Rehabilitation Program This one time program would provide matching funds to architecturally redesign the facade of the shopping center located south of the Post Office. North Gateway Landscape Improvement Project This program would provide trees and other landscape materials along west side of Front Street (between Front and Murrieta Creek) from Rancho California to the Post Office. Sewer Line Improvement Project Construct and install a 12" sewer line in South Front Street (outside of Specific Plan area) 5,000 lineal feet long. Estimated Cost $20,000 $30,000 $15,000 $100,000 $60,000 $42,000 $300,000 V - 47 City of Temecula Old Town Specific Plan d. Business Recrttitment and Retention BRAG Team Continues - Year Five Business Attraction Program Continues - Year Four Year Six - 1999 a. Studies Title/Description b. Economic Development Programs/Descriptions c. Physical Improvements 10" water distribution line in Mercedes and Second Street Four bus shelters Reconstruct Main Street Bridge for pedestrians and equestrians Business Recruitment and Retention BRAG Team Continues - Year Six Business Attraction Programs Continue - Year Five Estimated Cost in-Kind Services In-Kind Services $132,000 $4,000 $325,000 In-Kind Services In-Kind Services City of Temecula V - 48 Old Town Specific Plan City of Temecula, Planning Department PROPOSAL GUIDELINES TO PREPARE STREETSCAPE CONSTRUCTION PLANS AND SPECIFICATIONS TO: DATE: SUBJECT: Prospective Consultants March 21, 1994 Proposal Guidelines for the West Main Project TABLE OF CONTENTS Explanation of the Study Proposal Requirements Attachments Street Demonstration EXPLANATION OF THE STUDY The City Council adopted the Old Town Specific Plan on February 8, 1994. The purpose of the Plan is to protect the area's historic character, provide for the area's long-term economic viability, and provide appropriate streetscape improvements and infrastructure. One of the first infrastructure projects is the West Main Street Demonstration Project. With this Proposal Guideline, the City of Temecula desires to obtain the services of a well qualified consultant to do the following: · Review the preliminary Streetscape Concept in the Specific Plan · Prepare a Draft Streetscape Plan for West Main Street between Front Street and the Murrieta Creek bridge. · Conduct a public workshop on Draft Streetscape Plan. · Prepare a Final Streetscape Plan. · Prepare Construction Drawings for the approved Streetscape Plan. · Prepare Final Construction Plans and Specifications. The City expects that the streetscape plan and improvements will be consistent with the designs and criteria contained in the Old Town Specific Plan. A summary of the Specific Plan is included in Attachment A. A map of the proposed study area is included as Attachment B. OLDTOWN\OLDTOWN2.RFP II. PROPOSAL REQUIREMENTS Criteria for Proposal Acceptance Primary consideration will be given to the general appropriateness of the proposal for the project, the technical competence and creative ability of the consultants (as described in the proposal) and the firm's willingness to work closely with City staff. The City reserves the right to reject any proposals that are inappropriate or inadequate. Selection of a consultant will be based on the content of the written proposals received by the Contract Manager and on discussions with former clients. Additional materials may be submitted at the time of the interview. The contract will be awarded only to a responsive consultant. In order to qualify as responsible, a prospective consultant must meet the following standards, as they pertain to this Request for Proposal. The consultant must have adequate technical and financial resources for performance, as well as adequate equipment, or have the ability to obtain and to manage such resources and equipment as required during the performance period of the proposed contract. The consultant must have the necessary experience, organization, technical qualifications, skills, and facilities, or have the ability to obtain and to manage them (including any subconsultant arrangements). 3. The consultant must be able to comply with the proposed or required performance schedule for this project. 4. The consultant must have a satisfactory record of contractual performance. 5. The consultant must be an Equal Opportunity Employer. 6. The consultant must be otherwise qualified and eligible to receive an award under all applicable laws and regulations. Resoonse to Re(luest for ProPosal One (1) original and eight (8) copies of the completed proposal must be received by the Planning Department, City of Temecula, by the close of business on April 15, 1994. The original must be reproducible and submitted in loose-leaf, 8 1/2" x 11" format, with numbered pages. All proposals, as well as any modifications, received at this office after the hour and date specified above will not be considered unless they are sent by certified mail, for which an official, dated post office stamp has been obtained, and it is determined by the City's Project Manager that the late receipt was due solely to delay in the mails, for which the consultant was not responsible. 2 C. Criteria for Prooosal Evaluation and Consultant Selection The proposals shall be evaluated based upon the following criteria: 1. The experience of the firm(s) at completing similar projects; 2. The expertise of the project staff at completing similar projects; 3. The willingness and ability to complete the project on schedule, within budget, and in a satisfactory manner; 4. The consultants understanding of the project as demonstrated by the approach, scope and content of the proposal; and, 5. The overall completeness of the proposal. Limitations All reports and pertinent data or materials shall be the sole property of the City of Temecula, and may not be used or reproduced in any form without the explicit written permission of the City. The consultant should expect to have access to only the public records and files of local government agencies in preparing the proposal or reports. No City staff assistance should be anticipated by the consultant in the preparation of the streetscape plan, construction plans or specifications. Good business practices, such as the use of formal letters of request and the making of appointments should be followed. The City reserves the right to extend the time allotted for the proposal, to examine verbally the responder in person, and to request a best and final offer, should the City deem that it is in its best interests to do so. This request for a proposal does not commit the City to award a contract, or to pay any costs incurred in the preparation of the proposal. The City reserves the right to accept or reject any or all proposals received as a result of this request, to negotiate with any qualified consultant, or to cancel this request in part or in its entirety. The City may require the selected consultant to participate in negotiations and to submit such technical, price, or other revisions of their proposals as may result from negotiations. Organization of the Prooosal The organization of the proposed scope of work is described in this section of the Proposal Guidelines. This format must be followed by all potential consultants. 1. Introduction A general introduction and description of the proposed approach and methodology shall be provided. The format of the introduction and description of the approach is at the discretion of the consultant. 3 2. Plan of Study/Scope of Work Describe the work program to accomplish the approach described in Number E.1 above. The work program should address the issues identified in the Project Description and shall provide a detailed description of the work to be accomplished. The organization of the specific work activities in the plan of study should be as follows: TASK: An overview of a related group of subtasks or activities. Normally one or two sentences. SUBTASK: A detailed description of the work, including the methodology to be performed. Generally one to ten paragraphs depending upon the complexity of the activities described in the subtask. OUTPUT: A description of what the result of this particular activity or subtask is. Generally one sentence. The task, subtask, output format should be repeated throughout the plan of study until all the proposed work has been described in detail. Cost The complete costs for the Subtasks identified above, as well as all other anticipated expenses shall be included in a separate document and submitted as part of the RFP. Schedule Describe the time schedule for each proposed task and subtask described in Number E.2 above. Proposed work periods and completion dates, as well as the anticipated meeting dates, should also be identified. 5. Proaram Manaeement Indicate which method of program management will be used to internally manage and direct this project. {PERT, CPM, etc.) Provide the proposed project schedule on a timeline chart according to the selected system. 6. Personnel, EQuiPment and Facilities Describe the activities of the designated Project Manager, and lead and supporting personnel, Provide resumes for those named including their qualifications {education and experience), and their relationship and cost to the proposed project activities. 7. Subconsultants List all subconsultants proposed for this project and include their qualifications and specific responsibilities. 4 III. 8. References/Statement of Qualifications List of references for similar projects completed by the consultant team members during the last three years. The references shall identify the client, contact name and phone number, and a description of the services provided. In addition, list and describe all related or similar projects completed by the firm for the last five years. 9. Insurance The Proposal shall include a statement that the consultant shall have and maintain the required insurance identified in Attachment C. 10. Statement of Offer and Signature The proposal shall be signed by an individual authorized to bind the consultant, shall contain a statement to the effect that the proposal is a firm offer for a 90-day period, and shall contain a statement that the proposed work will be performed at the "not-to-exceed" price. 11. Project Reports The following list indicates the number and types of reports that the City will require for this project: a. Ten (10) copies of the Draft Streetscape Plan for City staff review. b. Fifty (50) copies of the Final Streetscape Plans. Two (2) copies of a presentation size proposed Final Streetscape Plan. Three (3) sets of preliminary construction drawings and plans and specifications for the Final Streetscape Plan. e. Ten (10) sets of Final Construction Plans. Fifty (50) copies of Final Plans and Specifications for Old Town Streetscape Improvements. Contract Manager for the City of Temecula The Director of Planning has designated David W. Hogan, Associate Planner to serve as the Contract Manager of this study. The Contract Manager may be contacted at (909) 694-6400, or by letter to the Department of Planning, City of Temecula, 43174 Business Park Drive, Temecula, California, 92590. ATTACHMENTS A. Excerpts from the Old Town Specific Plan. B. Map of the project area. C. City insurance requirements. 5 Attachment A G. STREETSCAPE IMPROVEMENTS 1. Purpose and Intent The purpose of streetscape improvements for Old Town is to promote a high quality historic image which serves to enhance the visual ex- perience of the area for tourists and residants alike. Pedestrian scale and the relationship of buildings to streets are impor- tant criteria that influenced the preparation of the Streetscape Plan. An environment oriented to the pedestrian should be concerned with meeting not only functional needs, but also sensory needs throughout the provision of a network of simple, well-defined and well'propor- tioned outdoor spaces. The following statements served to direct the overall streetscape design effort for Old Tom.' Beautify the street and improve environinental quality; Develop a system of pedestrian oriented streets and walkways; Do not over-plan the streetscape as turn of the century streetscapes were often simple, un~luttered, and less formal than contemporary streetscape programs; and Since forrealized street trees were not a major component of turn of the century streetscapes, the ele:nents that dominate the streetscape for Old Town will be street/sidewalk bardscape, signs and street furniture. City of Temecula Old Town Specific Plan IV - 55 2. Streetscape Plans a. Street Tree Variety Approach In many contemporary suburban and town environments (built since the 1940's) the street tree has been used as a unifying streetscape element. It is a role that many people have come to expect from the street tree. In older (pre-WWID urban dties; the street tree was regularly used as a major unifying symbol to give visual coherence to otherwise disparate elements. Street trees have not historically been used as unifying elements in small rural town environments such as Old Town. The very lack of existing street trees in Old Town is evidence that a for- .rnalized progrLra never materialized. From a design and his- torical perspective, it would be inappropriate at this time to force a uniform program of public streetscape planting. In keeping with the Specific Plan goal of not forrealizing Old Town into a regimental design concept, the proposal for street trees is referred to as "planned randomhess." This approach is ac- complished through actual in-the-field analysis since tree locations are not predetermined by a static formula (e.g. all trees 30 feet on center). These candidate areas are depicted on the following map graphic. The types of street trees to be used are also depicted on the map grapkic. 'The locations and types of trees are to be random. No more than 2 of the same type tree should be planted next to one another. Distance between trees may vary between 20 to 40 feet, and more if necessary, to avoid driveways and utilities. IV -56 City of Temecula Old Town Specific Plan :7' ,','//11 ~'Z ~Z:: ~Ej ~:~ ,, I ..', L~,:', I.~ [! .J Roadway Surface Concept Paving materials that reflect the historic material used in the nineteenth century are required on specified Old Town streets (Main Street and Front Street) and are recommended on all others. For Front Street and Main Street the recommended paving material is a dark beige concrete with a special "Mexican beach pebble" aggregate (1/2" to 1") floated on the concrete surface. Public Boardwalk and Curb Deta~ While vertical curbs are not part of the historic streetscape, their usefulness in channeling runoff and protecting pedestrians is important. It is recommended that rolled curbs be used to provide an economical and softer alternative edge treatment. The curb and gueter should match the street paving materials. City of Temecula Old Town Specific Plan IV - 58 c. Sidewalk/Path Concept The sidewalk concept for Old Town can best be described as a two tiered system. The first tier of the system is the public sidewalk. The sidewalk shall be directly adjacent to the curb and shall be a minimum of 4 feet wide. Much wider widths are desirable. The sidewalks shall be constructed of wood planks. The plank widths should vary in a random arrangement of 6", 8", and 10". The plank sidewalks shall be flush with the top of the curbs. Concrete handicapped ramps will be necessary at comers. The second tier of the system is privately owned, covered porches, and arcades. This second tier is referred to as the "browsing zone." The browsing zone shall be directly adjacent to and parallel to the public sidewalk and shall be a minimum of 8 feet wide. Widths up to 12 feet may be appropriate if seating areas are provided. The height (elevation) of the porch/boardwalk shall not be greater than 12 inches above the adjacent sidewalk unless greater heights are required because of its flood plane location. The porch shall be open and accessible at both ends to allow continuous pedestrian browsing from one storefront to the next storefront. While porch railings are discouraged between the public boardwalk and the storefront, they may be allowed, provided an entry/exit to the public boardwalk is included every 25 feet. ... Wooden Boardwalk Rolled Curb Street Storefront Porch IV - 59 City of Temecula Old Town Specific Plan d. Major Intersection Paving/Historic Depiction Logo The paving of the Main Street/Front Street intersection is of major importance to achieve an immediate image for Old Town. This intersection is readily recognized as the heart of Old Town and as such should receive spedal intersection treatment. It is highly recommended that the City or merchants initiate a design competition to develop an Old Town logo. The intersection paving/historic depiction logo are depicted below: Street Paving: Beige Colored Concrete with Floated Mexican Beach Stone Aggregate Cowboy Logo: Smooth Finish Iron City of Temecula Old Town Specific Plan IV - 60 Street Furniture Street furnishing can enliven and provide variety to outdoor spaces used by the public. Street furnishing serve an aesthetic as well as utilitarian function. Proper design and placement of such amenities will reinforce the Old West design theme and create a lively and festive atmosphere throughout the year in Old Town. Wood Benches Cambridge Designs Model CD 330 features vertical back slats and horizontal seat slats. Various wood selections are available. Pressure treated Pine may be selected for an economical approach while Purple Heart wood is the perfect material for heavy use Pubtic Bench Trash Receptacles Trash receptacles should resemble the whiskey barrel style as shown: TRASH RECEPTACLE IV - 61 City of Temecula Old Town Specific Plan Pedestrian Lighting Street lighting in small rural towns in the nineteenth century was probably non existent for communities Eke Ternecula. In order to enhance pedestrian safety at night however, pedestrian level lighting is recommended. The existing lighting in Old Town is the single acorn on a concrete pole. This light style (1930's - 1940's) is incorrect for the theme or period being sought for Old Town. Therefore, a simple lantern style light, on a double posted pole (matching the street signs) is recommended. The recommended light and pole are shown here. FORTY-NINER ~ Max. Ught Source: 150 HP5, 175 MH. MV, 55 LoS (o0t. Lclmo ~)itiorl) Diffusen Clear, White or Frosted Polycarl:~3nate or Glass (Chimney or Retractor Available) Mounting: 3' rd X 3' Tenon ' 325 Welt Rider CI Penis, CA 92571 n Phone (714) 657-5499 Q FAX (714) 657-1540 City of Temecula Old Town Specific Plan IV - 62 N~.~sp~p~ Rac~ Newspaper racks in Old Town should be built primarily of dark stained wood. Whenever pos- sible, the number of newspapers per rack con- tainer should not exceed three. Mailboxes Mailboxes in Old Town should retain the rural delivery flavor of the mailbox rack system shown below for a multi tenant situation. Material should be dark stained wood. IV - 63 City of Temecula Old Town Specific Plan Bus Shelters While there will not be very many bus shelters in Old Town, the design should be compatible with the Turn of the Century look. Bus shelters should be custom designed and made primarily of wood. Color should be dark natural stain, white, or dark green. Metal and plexiglass con- temporary designs are strongly discouraged. Other "Period" Furniture Many other streetscape furniture items make up the total streetscene. These items, in order to match the "period" style desirable for Old Town, will need to be custom designed and built. These items may include: · · · · · Phone booths; Drinking fountains; Fire hydrants; Utility poles; or Antique traffic signal(s). City of Temecula Old Town Specific Plan IV - 64 Public Signs Concept The importance of signs as an essential, integrated design element in the total Old Town environment is of paramount concern. A carefully executed sign program for Old Town can communicate vital information, reduce traffic congestion, boost retail sales as well as enhancing the architectural environment. As an exten- sion of Old Town's image, they help create an easily recognized and distinctive town image necessary to promote economic well being. The Sign Concept for Old town is a three tiered ap- proach. Gateway Entry Sign~ Public Parking Directional Signs Street Name Pole Signs IV - 65 City of Teraecula Old Town Specific Plan Gateway Entry A gateway sign will be installed at each end of Front Street which reads OLD TOWN. It will span over all traffic lanes. Its materials will recall the architectural image of Old Town. Materials will include sandblasted wood, and wrought iron. Illumination will be provided. Old Town's logo will be prominently displayed. GATEWAY ENTRY SIGN City of Temecula Old Town Specific Plan Parking Directional Signs Parking directional signs will be located primarily along Front Street at intersections where public parking access is available. Other side street locations may also be appropriate at or near the parking lot. The signs will be free standing and made of architecturally compatible materials. Illumination will be provided. Old Town's logo will be incorporated. Public Parking '-- DIRECTORY PARKING/DIRECTIONAI, SIGN IV - 68 City of Temecula Old Town Specific Plan Street Name Pole Signs These signs will be simple wood construction similar to the existing wood signs currently located in Old Town. Old Town's logo may be incorporated into the street name placard or pole. Front St. STREET SIGN MATCHING RANCHO CALIFORNIA WOODEN STYLE WITH COWBOY LOGO City of Temecula Old Town Specific Plan IV - 69 dV~ NOI,LVO0'I IS lO~ loe[o~d uo!lej},suocuea leeJ1S u!elAI },se~ 8 lue~uqoellV Attachment C INSURANCE PROVISIONS Consultant shall maintain in full force, during the term'of the service contract, limits of insurance, no less than: General Liability: $1,000,000 combined single limit per occurrence for bodily injury and property damage. Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage. Worker's Compensation and Employer's Liability: Worker's Compensation as required by the Labor Code o_f the State of California and Employer's Liability limits of $1,000,000 per accident. 4. Errors and Omissions Insurance: $1,000,000 per occurrence. It is the Consultant's responsibility to notify the City if there are any changes in insurance provisions that would impact the above requirements. Insurance carrier(s) shall be admitted to do business in the State of California and shall have a Best rating of no less than A:VII.