HomeMy WebLinkAbout121117 OTLRB Agenda
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting,
please contact the office of the City Clerk (951) 694-6444. Notification 48 hours prior to a meeting will enable the
City to make reasonable arrangements to ensure accessibility to that meeting \[28 CFR 35.102.35.104 ADA Title II\]
MEETING NOTICE/AGENDA
OLD TOWN TEMECULA LOCAL REVIEW BOARD
GREAT OAK CONFERENCE ROOM
41000 MAIN STREET
TEMECULA, CALIFORNIA
December 11, 2017 9:00 a.m.
*********
CALL TO ORDER
Roll Call:Board Members: Blair, Brown, Moore, Puma, and Chairperson Malmstrom
PUBLIC COMMENTS
A total of 15 minutes is provided so members of the public may address the Board on items that
are listed on the Agenda. Speakers are limited to three (3) minutes each. If you desire to speak
not
to the Board about an item on the Agenda, a green form may be filled
out and filed with the Board Secretary.
When you are called to speak, please come forward and state your name for the record.
For all other agenda items, a form may be filed with the Board Secretary
prior to the Board addressing that item. There is a three (3) minute time limit for individual
speakers.
NOTICE TO THE PUBLIC
All matter listed under Consent Calendar are considered to be routine and all will be
enacted by one roll call vote. There will be no discussion of these items unless members
of the Local Review Board request specific items to be removed from the Consent
Calendar for separate action.
CONSENT CALENDAR
1 Action Minutes
RECOMMENDATION
1.1 Approve the Action Minutes of August 14, 2017
BOARD BUSINESS
2 Elect Chair and Vice Chair for 2018
1
3 Planning Application No. PA17-1279, a Major Modification to allow Barrel Republic to add
approximately 1,264 square feet to an existing building, a new rear patio (approximately
3,016 square feet), a new front patio (approximately 870 square feet) and elevation
changes to the building located at 41950 Main Street
Applicant: Alec Zier
41950 Main Street,
Temecula, CA 92590
Staff: Brandon Rabidou, Assistant Planner
4 Receive and file a report on the presentation on sidewalks Old Town Boardwalk
Enhancement (PW17-16)
Staff: Patrick Thomas, Director of Public Works Department
5 Receive and file a report on the intermittent street closure of 3rd Street as part of the Truax
Hotel construction project
Staff: Patrick Thomas, Director of Public Works/City Engineer
Steve Charette, Associate Civil Engineer
6 Receive and file a report on the presentation on sidewalks Old Town Sidewalk
Improvement Project (Mercedes Street) (PW17-04)
Staff: Patrick Thomas, Director of Public Works Department
7 Receive and file a report on the presentation on sidewalks Sixth Street Improvements
(PW17-05)
Staff: Patrick Thomas, Director of Public Works Department
BOARD MEMBERS REPORT
DIRECTOR OF COMMUNITY DEVELOPMENT REPORT
CODE ENFORCEMENT REPORT
ADJOURNMENT
Next regular meeting: January 8, 2018, 9:00 a.m., Great Oak Conference Room, City Hall,
41000 Main Street, Temecula, CA 92590
NOTICE TO THE PUBLIC
:
The agenda packet (including staff reports) will be available for viewing in the Main Reception area at the Temecula
Civic Center (41000 Main Street, Temecula) after 4:00 p.m. the Friday before the Old Town Local Review Board
Supplemental
Meeting. TemeculaCA.gov. Any
material
distributed to a majority of the Board regarding any item on the Agenda, after the posting of the Agenda, will be
available for public review in the Main Reception area at the Temecula Civic Center (41000 Main Street, Temecula),
8:00 a.m. TemeculaCA.gov and
will be available for public review at the respective meeting.
If you have any questions regarding any item of business on the Agenda for this meeting, please call the Community
Development Department, (951) 694-6400.
2
MEETING ACTION MINUTES
OLD TOWN TEMECULA LOCAL REVIEW BOARD
GREAT OAK CONFERENCE ROOM
41000 MAIN STREET
TEMECULA, CALIFORNIA
August 14, 2017 9:00 a.m.
*********
CALL TO ORDER
Chairperson Malmstrom called the meeting to order at 9:00 a.m.
Roll Call:
Present:Board Members:Blair, Brown, Moore, Puma and Chairperson
Staff: Director Watson, Principal Planner Fisk, Senior Planner Peters,
Associate Planner Jones, Sr. Code Enforcement Officer Cole, Planning
Intern Mosler, and Minutes Clerk Jacobo
PUBLIC COMMENTS
There were no requests to speak on Public Comments.
NOTICE TO THE PUBLIC
All matter listed under Consent Calendar are considered to be routine and all will be
enacted by one roll call vote. There will be no discussion of these items unless members
of the Local Review Board request specific items to be removed from the Consent
Calendar for separate action.
CONSENT CALENDAR
1 Action Minutes
RECOMMENDATION
1.1 APPROVED 4-0-1; MOTION BY
Approve the Action Minutes of July 17, 2017
BOARD MEMBER PUMA, SECOND BY BOARD MEMBER MOORE, AYE
VOTES BY BOARD MEMBERS BLAIR, BROWN, MOORE, AND PUMA;
MALMSTROM ABSTAINED
BOARD BUSINESS
2 Planning Application No. PA17-0324, A Development Plan application to allow for the
construction of an approximately 87,280 square foot commercial center comprised of two
3-story buildings with basements. The Project is generally located on the north and south
side of Town Square Park on Main Street, adjacent to the Civic Center
Action Minutes Monday, August 14, 2017
Old Town Temecula Local Review Board 9:04 10:07 a.m.
*********
APPROVED (OVERALL PROJECT) 5-0; MOTION BY BOARD MEMBER MOORE ,
SECOND BY BOARD MEMBER PUMA, AYE VOTES BY BOARD MEMBERS BLAIR,
BROWN, MOORE, PUMA AND MALMSTROM
APPROVED (TOWER IN THE PUBLIC RIGHT-OF-WAY, WITHOUT THE ARCH) 4-1;
MOTION BY BOARD MEMBER PUMA, SECOND BY BOARD MEMBER MOORE; AYE
VOTES BY BOARD MEMBERS BLAIR, MALMSTROM, MOORE, AND PUMA; NAY
VOTE BY BOARD MEMBER BROWN
Applicant: Joe Holasek of NOAA Group on Behalf of the Truax Group
Staff: Eric Jones, Project Planner
BOARD MEMBERS REPORT
DIRECTOR OF COMMUNITY DEVELOPMENT REPORT
CODE ENFORCEMENT REPORT
ADJOURNMENT
The Old Town Temecula Local Review Board meeting was adjourned at 10:07 a.m., to the next
regular meeting on Monday, September 11, 2017, 9:00 a.m., Great Oak Conference Room, City
Hall, 41000 Main Street, Temecula, CA 92590
_________________________________ _______________________________
Laurie Malmstrom Luke Watson
Chairperson, Old Town Local Review Board Director of Community Development
2
ELECT
CHAIRPERSON
AND
VICE
CHAIRPERSON
STAFF REPORT PLANNING
CITY OF TEMECULA
OLD TOWN LOCAL REVIEW BOARD
December 11, 2017
PLANNING APPLICATION NO. PA17-1279
Prepared by: Brandon Rabidou
APPLICATION INFORMATION:
APPLICANT: Alec Zier
PROPOSAL: A Major Modification to allow Barrel Republic to add approximately
1,264 square feet to an existing building, a new rear patio
(approximately 3,016 square feet), a new front patio (approximately
870 square feet) and elevation changes to the building located at
41950 Main Street
LOCATION: 41950 Main Street
EXISTING ZONING: Old Town Specific Plan Downtown Core (DTC)
SURROUNDING ZONING: North: Downtown Core (DTC)/Civic (CV)
South: Downtown Core (DTC)
East: Downtown Core (DTC)
West: Downtown Core (DTC)
GENERAL PLAN
DESIGNATION: Specific Plan Implementation (SPI)
EXISTING LAND USE: Retail
SURROUNDING LAND
USES: North: Vacant Lot/Park
South: Retail/Parking Lot
East: Parking Lot
West: Retail
BACKGROUND
On August 21, 2017, Alec Zier submitted Planning Application No. PA17-1279, a Major
Modification to allow Barrel Republic to make various changes, including the addition of
approximately 1,264 square feet to an existing building, a new rear patio (approximately 3,016
square feet), a new front patio (approximately 870 square feet) and elevation changes to the
building located at 41950 Main Street. The project is located within the Downtown Core District
(DTC) of the Old Town Temecula Specific Plan (OTSP). The proposed project is located on the
property where the former Serendipity Antiques was located.
X:\\Planning\\2017\\PA17-1279 Barrel Republic\\Planning\\Old Town Local Review Board\\PA17-1279 Old Town Local Review Board.docx
ANALYSIS
Site Plan
The proposed project is located on an approximately 7,500 square foot lot that contains an
existing 2,165 square foot building and an 800 square foot patio at the front of the property. Three
other accessory structures exist on the site consisting of a green house, a raised planter, and a
deck/retail space.
On the north side of the proposed project (front) the existing patio cover would be replaced with
a slightly larger patio cover (approximately 870 square feet). On the rear of the existing 2,165
square foot building, an approximately 1,264 square foot addition is proposed. Furthermore, an
area of approximately 3,016 square feet would be turned into an outdoor patio that is partially
covered by an open timber patio cover and a covered patio. The three accessory structures (a
green house, raised planter, and deck/retail space) would be demolished. Adjacent to the alley,
the new covered patio area would also contain an enclosed trash enclosure structure. Alley
improvements will be coordinated with the anticipated Marketplace project and be required for the
project.
Architecture
The new (front) patio cover would be comprised of corrugated metal roofing that has a vintage
(with a rust like appearance) finish. On the bottom portion of the front façade, a Santa Barbara
smooth stucco finish would replace the existing wood siding. Along the top portion of the façade
(above the patio) reclaimed wood siding would replace the existing wood siding. The style of this
patio cover and improved facade would be consistent with a single story gallery that is permissible
in the Old Town Specific Plan. The smooth stucco, corrugated metal, and reclaimed wood siding
are consistent with historical materials identified in the Design Guidelines of the Old Town Specific
Plan (Section V).
Sides of the existing building and areas around the new addition would be finished with a Santa
Barbara smooth stucco finish. Open patio areas at the rear of the property would contain one
area that can be temporarily covered by a retractable awning system as well as a new permanent
covered patio. Materials for the new permanent patio cover include the corrugated metal roofing
(the same as the front patio), a Santa Barbara smooth stucco finish, and a natural stone veneer
(Tumbled Elk Mountain).
Landscaping
Existing landscaping at the front of the property does not meet the updated landscape/sidewalk
standards for the Old Town Specific Plan. In order to facilitate pedestrian movement, the applicant
will remove existing landscaping within the right-of-way, and replace it with concrete to match the
existing sidewalk (with the San Diego Buff color).
Landscaping for the proposed project will include minor planters for the patio area as well as small
planters throughout the dining area.
RECOMMENDATION
Staff has determined that the proposed Barrel Republic is in conformance with the Old Town
Specific Plan. Staff is requesting that the Old Town Local Review Board review, provide
comments, and recommend that the project be approved.
ATTACHMENTS
Plan Reductions
X:\\Planning\\2017\\PA17-1279 Barrel Republic\\Planning\\Old Town Local Review Board\\PA17-1279 Old Town Local Review Board.docx
CITY OF TEMECULA
COMMUNITY DEVELOPMENT DEPARTMENT
MEMORANDUM
TO:
Old Town Local Review Board
FROM:
Luke Watson, Director of Community Development
DATE:
December 11, 2017
SUBJECT:
Presentation on Sidewalks Old Town Boardwalk Enhancement
PREPARED BY:
Patrick Thomas, Director ofPublic Works Department
BACKGROUND:
The City is working on its Sidewalks Old Town Boardwalk
Enhancement project to remove wooden boardwalk planks from sidewalks throughout Old Town
and replace them with colored, stamped concrete sidewalks similar to those installed on the
approaches to the new Main Street Bridge. Some of the existing concrete sidewalks (San Diego
Buff) will also be replaced for continuity and consistency. Where feasible, sidewalk widths will be
expanded and trees/grates installed per the Old Town Specific Plan.
The bulk of improvements are located along Old Town Front Street and Main Street, with isolated
th
areas on 6 Street and Mercedes Street.
RECOMMENDATION :
Receive and file.
CITY OF TEMECULA
PUBLIC WORKS, LAND DEVELOPMENT
MEMORANDUM
TO:
Old Town Local Review Board
FROM:
Luke Watson, Director of Community Development
DATE:
November 28, 2017
SUBJECT:
Intermittent Street Closure of 3rd Street as Part of the Truax Hotel
Construction Project
PREPARED BY:
Patrick Thomas, Director of Public Works/City Engineer
Steve Charette, Associate Civil Engineer
BACKGROUND:
A Boutique Hotel development consisting of a six-story, 175,700
rd
square foot hotel, is proposed along the south side of 3 Street between Old Town Front
Street and Mercedes Street. A parking structure for the hotel will also be constructed
rd
directly across 3 Street. The development of the hotel project and street improvements is
estimated to occur over a period of two and one-half years, anticipated to begin November
2017 through March 2020.
rd
During the construction activities, the owner will fully close a portion of 3 Street that fronts
the parking garage parcel at intermittent periods. The closures will allow safe construction
access between the two sites (hotel and garage) during daytime working hours.
rd
Closure of 3 Street will be limited to daytime work hours of 7:00 a.m. to 4:00 p.m.,
Monday through Friday. Closure will consist of a double 12-foot gate system. During non-
rd
working hours the gates will remain open. Access to active businesses on 3 Street, east
and west of the closure, will remain available at all times via Old Town Front Street and
Mercedes Street.
rdnd
Traffic will be detoured around the 3 Street closure via Old Town Front Street, 2 Street
and Mercedes Street pursuant to a City-approved Traffic Detour Plan.
RECOMMENDATION:
Receive and file.
\[Type text\]
CITY OF TEMECULA
COMMUNITY DEVELOPMENT DEPARTMENT
MEMORANDUM
TO:
Old Town Local Review Board
FROM:
Luke Watson, Director of Community Development
DATE:
December 11, 2017
Presentation on Sidewalks Old Town Sidewalk Improvement Project
SUBJECT:
(Mercedes Street)
PREPARED BY:
Patrick Thomas, Director ofPublic Works Department
BACKGROUND:
The City is working on its Sidewalks - Old Town Improvement
Project (Mercedes Street from Fourth Street to Sam Hicks Park) to provide walking surfaces for
pedestrians. The project consists of installing a sidewalk along the east side of Mercedes Street,
from Fourth Street to Sam Hicks Park. The improvements also include constructing ADA ramps,
retaining walls, street lights, an
of Transportation Mobility and Connectivity.
RECOMMENDATION:
Receive and file.
ATTACHMENTS:
1. Project Location Map
CITY OF TEMECULA
COMMUNITY DEVELOPMENT DEPARTMENT
MEMORANDUM
TO:
Old Town Local Review Board
FROM:
Luke Watson, Director of Community Development
DATE:
December 11, 2017
SUBJECT:
Presentation on Sidewalks Sixth Street Improvements
PREPARED BY:
Patrick Thomas, Director ofPublic Works Department
BACKGROUND:
The City is working on its Sidewalks - Sixth Street Improvements
project to provide walking surfaces for pedestrians. The project consists of installing a sidewalk
along the north side of Sixth Street, from Mercedes Street to the Mary Phillips Senior Center. The
improvements also include constructing an ADA ramp, street widening, street lights, and planting
sportation Mobility and
Connectivity.
RECOMMENDATION :
Receive and file.
ATTACHMENTS:
1. Project Location Map
SIDEWALKS - SIXTH STREET SIDEWALK IMPROVEMENTS
Infrastructure Project Location
Feet
0200400100
AerialData-2015