Loading...
HomeMy WebLinkAbout18-07 PC Resolution PC RESOLUTION NO. 18-07 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA17-0318, A DEVELOPMENT PLAN FOR THE CONSTRUCTION OF AN APPROXIMATELY 5,796 SQUARE FOOT CONVENIENCE STORE AND AUTOMOBILE SERVICE STATION WITH A 700 SQUARE FOOT SECOND FLOOR DWELLING UNIT FOR THE PROPRIETOR OF THE BUSINESS LOCATED ON THE SOUTHWEST CORNER OF TEMECULA PARKWAY AND PECHANGA PARKWAY AND MAKING A FINDING OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) Section 1. Procedural Findings. The Planning Commission of the City of Temecula does hereby find, determine and declare that: A. On February 16, 2017, Gregory Hann filed Planning Application Nos. PA17- 0318 a Development Plan and PA17-0317 a Conditional Use Permit to allow for the construction of an approximately 5,796 square foot convenience store and automotive service station with a 700 square foot second floor dwelling unit for the proprietor of the business, and a Type 20 ABC license for off-sale beer and wine. On November 16, 2017, Gregory Hann filed Planning Application No. PA17-1632 a Finding of Public Convenience and Necessity. These applications (collectively "project"), were filed in a manner in accord with the City of Temecula General Plan and Development Code. B. The proposed project was processed including, but not limited to a public notice, in the time and manner prescribed by State and local law. C. On December 6, 2017, the proposed project was considered by the Planning Commission at a duly noticed public hearing. At the conclusion of the hearing, the Planning Commission voted to direct staff to prepare a resolution of denial. The applicant subsequently revised the proposed project to address the Planning Commission's concerns. D. The Planning Commission, at a regular meeting, considered the Application and environmental review on March 21, 2018, at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to and did testify either in support or in opposition to this matter. E. At the conclusion of the Planning Commission hearing and after due consideration of the testimony, the Planning Commission approved Planning Application No. PA17-0318, subject to and based upon the findings set forth hereunder. F. All legal preconditions to the adoption of the Resolution have occurred. Section 2. Further Findings. The Planning Commission, in approving the development plan application hereby finds, determines and declares pursuant to Development Code Section 17.05.010.F that: A. The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City; The proposed project is in conformance with the General Plan. The project, as conditioned, is also consistent with other applicable requirements of State law and local Ordinances, including the California Environmental Quality Act (CEQA), the Citywide Design Guidelines, and Fire and Building codes. B. The overall development of the land is designed for the protection of the public health, safety, and general welfare; The project has been designed with access points on Temecula Parkway and Pechanga Parkway while avoiding an access point on the local residential street within a single family residential neighborhood. The project has also provided a setback from the single family residential neighborhood of a minimum 39'-11" which greatly exceeds the required 20' setback required by the City of Temecula Design Guidelines. Therefore, the overall design of the project, including the site, building, parking, circulation and other associated site improvements, is consistent with, and intended to protect the health and safety of those working and living in an around the site as the project is consistent with the General Plan, City Wide Design Guidelines, and Development Code. The project has been reviewed for, and as conditioned, has been found to be consistent with all applicable policies, guidelines, standards and regulations intended to ensure that the development will be constructed and function in a manner consistent with the public health, safety, and welfare. Section 4. Environmental Findings. The Planning Commission hereby makes the following environmental findings and determinations in connection with the approval of the Development Plan: A. In accordance with the California Environmental Quality Act, the proposed project has been deemed to be categorically exempt from further environmental review (Section 15332, In-Fill Development Projects); The project meets all General Plan and Zoning policies and regulations and is located within City limits on a site of no more than five acres. The project site has no value as habitat for endangered, rare or threatened species. The site is also surrounded by development and is able to be serviced by all required utilities and public services. The project is not anticipated to result in any significant effects relating to traffic, noise, air quality, or water quality as the project, as conditioned, is an allowed use per the City of Temecula General Plan. Section 5. Conditions. The Planning Commission of the City of Temecula approves Planning Application No. PA17-0318, a Development Plan for the construction of an approximately 5,796 square foot convenience store and automobile service station with a 700 square foot second floor dwelling unit for the proprietor of the business located on the southwest corner of Temecula Parkway, and makes a finding of exemption under the California Environmental Quality Act (CEQA), subject to the Conditions of Approval set forth on Exhibit A, attached hereto, and incorporated herein by this reference. Section 5. PASSED, APPROVED AND ADOPTED by the City of Temecula Planning Commission this 21 st day of March, 2018. Gary Youma VChairperson ATTEST: Lu at on Secretary [SEAL] STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE )ss CITY OF TEMECULA ) I, Luke Watson, Secretary of the Temecula Planning Commission, do hereby certify that the forgoing PC Resolution No. 18-07 was duly and regularly adopted by the Planning Commission of the City of Temecula at a regular meeting thereof held on the 21st day of March, 2018, by the following vote: AYES: 2 PLANNING COMMISSIONERS: Telesio, Watts NOES: 1 PLANNING COMMISSIONERS: Turley-Trejo ABSENT: 2 PLANNING COMMISSIONERS: Guerriero, Youmans ABSTAIN: 0 PLANNING COMMISSIONERS: None j Luke Watson Secretary EXHIBIT A CITY OF TEMECULA FINAL CONDITIONS OF APPROVAL Planning Application No.: PA17-0318 Project Description: A Development Plan Application for the construction of an approximately 5,796 square foot convenience store and automotive service station with a 700 square foot second floor dwelling unit for the proprietor of the business and a Type 20 ABC license for off-sale beer and wine located on the southwest corner of Temecula Parkway and Pechanga Parkway Assessor's Parcel No.: 961-440-010, 961-440-016 MSHCP Category: Less than 8.0 dwelling units, Commercial DIF Category: Retail Commercial, Residential-Detached TUMF Category: Residential-Single Family, Retail Commercial Quimby Category: Single Family Residential (Detached Garage) New Street In-lieu of Fee: N/A(not within the Uptown Temecula Specific Plan area) Approval Date: March 21, 2018 Expiration Date: March 21, 2021 PLANNING DIVISION Within 48 Hours of the Approval 1. Filing Notice of Exemption. The applicant/developer shall deliver to the Planning Division a cashiers check or money order made payable to the County Clerk in the amount of Fifty Dollars ($50.00)for the County administrative fee, to enable the City to file the Notice of Exemption as provided under Public Resources Code Section 21152 and California Code of Regulations Section 15062. If within said 48-hour period the applicant/ developer has not delivered to the Planning Division the check as required above, the approval for the project granted shall be void by reason of failure of condition (Fish and Wildlife Code Section 711.4(c)). General Requirements 2. Indemnification of the City. The applicant and owner of the real property subject to this condition shall hereby agree to indemnify, protect, hold harmless, and defend the City and its attorneys from any and all claims, actions, awards,judgments, or proceedings against the City to attack, set aside, annul, or seek monetary damages resulting, directly or indirectly, from any action in furtherance of and the approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board or legislative body including actions approved by the voters of the City, concerning the Planning Application. The City shall be deemed for purposes of this condition, to include any agency or instrumentality thereof, or any of its elected or appointed officials, officers, employees, consultants, contractors, legal counsel, and agents. City shall promptly notify both the applicant and landowner of any claim, action, or proceeding to which this condition is applicable and shall further cooperate fully in the defense of the action. The City reserves the right to take any and all action the City deems to be in the best interest of the City and its citizens in regards to such defense. 3. Expiration. This approval shall be used within three years of the approval date; otherwise, it shall become null and void. Use means the beginning of substantial construction contemplated by this approval within the three-year period, which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval, or use of a property in conformance with a Conditional Use Permit. 4. Time Extension. The Director of Community Development may, upon an application being filed prior to expiration, and for good cause, grant a time extension of up to five extensions of time, one year at a time. 5. Conformance with Approved Plans. The development of the premises shall substantially conform to the approved site plan and elevations contained on file with the Planning Division. 6. Signage Permits. A separate building permit shall be required for all signage. 7. Landscape Maintenance. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Director of Community Development. If it is determined that the landscaping is not being maintained, the Director of Community Development shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. 8. Burrowing Owl Study Submittal. A Burrowing Owl Study shall be submitted prior to plan check approval for the grading permit. If construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. 9. Water Quality and Drainage. Other than stormwater, it is illegal to allow liquids, gels, powders, sediment, fertilizers, landscape debris, and waste from entering the storm drain system or from leaving the property. To ensure compliance with this Condition of Approval: a. Spills and leaks shall be cleaned up immediately. b. Do not wash, maintain, or repair vehicles onsite. c. Do not hose down parking areas, sidewalks, alleys, or gutters. d. Ensure that all materials and products stored outside are protected from rain. e. Ensure all trash bins are covered at all times. 10. Paint Inspection. The applicant shall paint a three-foot-by-three-foot section of the building for Planning Division inspection, prior to commencing painting of the building. 11. Materials and Colors. The Conditions of Approval specified in this resolution, to the extent specific items, materials, equipment, techniques, finishes or similar matters are specified, shall be deemed satisfied by City staffs prior approval of the use or utilization of an item, material, equipment, finish or technique that City staff determines to be the substantial equivalent of that required by the Conditions of Approval. Staff may elect to reject the request to substitute, in which case the real party in interest may appeal, after payment of the regular cost of an appeal, the decision to the Planning Commission for its decision. Materials Color Eldorado Stone Coastal Ledgestone Aluminum Storefront Blue-Green Glazing Stucco Southern Shadow Stucco Babbitt Brown Stucco California Copper Stucco Natural White Metal Trim Ascot Blue 12. Modifications or Revisions. The permittee shall obtain City approval for any modifications or revisions to the approval of this project. 13. Trash Enclosures. The trash enclosures shall be large enough to accommodate a recycling bin, as well as regular solid waste containers. 14. Trash Enclosures. Trash enclosures shall be provided to house all trash receptacles utilized on the site. These shall be clearly labeled on the site plan. 15. Covered Trash Enclosures. All trash enclosures on site shall include a solid cover and the construction plans shall include all details of the trash enclosures, including the solid cover. 16. Construction and Demolition Debris. The developer shall contact the City's franchised solid waste hauler for disposal of construction and demolition debris and shall provide the Planning Division verification of arrangements made with the City's franchise solid waste hauler for disposal of construction and demolition debris. Only the City's franchisee may haul demolition and construction debris. 17. Public Art Ordinance. The applicant shall comply with the requirements of the City's Public Art Ordinance as defined in Section 5.08 of the Temecula Municipal Code. 18. Property Maintenance. All parkways, including within the right-of-way, entryway median, landscaping, walls, fencing, recreational facilities, and on-site lighting shall be maintained by the property owner or maintenance association. 19. Residential Dwelling Unit. The second floor residential dwelling unit shall be for the use of the preprieter owner or manager of the business only and shall not be sold or leased. (COA revised at the Planning Commission Hearing on March 21, 2018) 20. Audio Visual Equipment. The project shall not contain audio or visual equipment as part of the gas pumps. 21. Restaurant Use. Per Section 4.4 and Exhibit G of the Development Agreement between Pala Rainbow, LLC and the City of Temecula dated December 16, 1999 a drive-in restaurant use is prohibited on the project site. Any modifications to the Development Plan for PA17-0318 that contains a drive-in restaurant will not be approved. Prior to Issuance of Grading Permit 22. Placement of Transformer. Provide the Planning Division with a copy of the underground water plans and electrical plans for verification of proper placement of transformer(s) and double detector check valves prior to final agreement with the utility companies. 23. Placement of Double Detector Check Valves. Double detector check valves shall be installed at locations that minimize their visibility from the public right-of-way, subject to review and approval by the Director of Community Development. 24. Archaeological/Cultural Resources Grading Note. The following shall be included in the Notes Section of the Grading Plan: "If at any time during excavation/construction of the site, archaeological/cultural resources, or any artifacts or other objects which reasonably appears to be evidence of cultural or archaeological resource are discovered, the property owner shall immediately advise the City of such and the City shall cause all further excavation or other disturbance of the affected area to immediately cease. The Director of Community Development at his/her sole discretion may require the property owner to deposit a sum of money it deems reasonably necessary to allow the City to consult and/or authorize an independent, fully qualified specialist to inspect the site at no cost to the City, in order to assess the significance of the find. Upon determining that the discovery is not an archaeological/ cultural resource, the Planning Director shall notify the property owner of such determination and shall authorize the resumption of work. Upon determining that the discovery is an archaeological/cultural resource, the Planning Director shall notify the property owner that no further excavation or development may take place until a mitigation plan or other corrective measures have been approved by the Planning Director." 25. Cultural Resources Treatment Agreement. The developer is required to enter into a Cultural Resources Treatment Agreement with the Pechanga Tribe. The agreement shall be in place prior to issuance of a grading permit. To accomplish this, the applicant should contact the Pechanga Tribe no less than 30 days and no more than 60 days prior to issuance of a grading permit. This Agreement will address the treatment and disposition of cultural resources, the designation, responsibilities, and participation of professional of professional Pechanga Tribal monitors during grading, excavation and ground disturbing activities; project grading and development scheduling; terms of compensation for the monitors; and treatment and final disposition of any cultural resources, sacred sites, and human remains discovered onsite. The Pechanga monitor's authority to stop and redirect grading will be exercised in consultation with the project archaeologist in order to evaluate the significance of any potential resources discovered on the property. Pechanga and archaeological monitors shall be allowed to monitor all grading, excavation and groundbreaking activities, and shall also have the limited authority to stop and redirect grading activities should an inadvertent cultural resource be identified. 26. Discovery of Cultural Resources. The following shall be included in the Notes Section of the Grading Plan: "If cultural resources are discovered during the project construction(inadvertent discoveries), all work in the area of the find shall cease, and the qualified archaeologist and the Pechanga monitor shall investigate the find, and make recommendations as to treatment." 27. Archaeological Monitoring Notes. The following shall be included in the Notes Section of the Grading Plan: "A qualified archaeological monitor will be present and will have the authority to stop and redirect grading activities, in consultation with the Pechanga Tribe and their designated monitors, to evaluate the significance of any archaeological resources discovered on the property." 28. Tribal Monitoring Notes. The following shall be included in the Notes Section of the Grading Plan: "A Pechanga Tribal monitor will be present and will have the authority to stop and redirect grading activities, in consultation with the project archaeologist and their designated monitors, to evaluate the significance of any potential resources discovered on the property." 29. Relinquishment of Cultural Resources. The following shall be included in the Notes Section of the Grading Plan: "The landowner agrees to relinquish ownership of all cultural resources, including all archaeological artifacts that are found on the project area, to the Pechanga Tribe for proper treatment and disposition." 30. Preservation of Sacred Sites. The following shall be included in the Notes Section of the Grading Plan: "All sacred sites are to be avoided and preserved." 31. Burrowing Owl Grading Note. The following shall be included in the Notes Section of the Grading Plan: "No grubbing/clearing of the site shall occur prior to scheduling the pre-grading meeting with Public Works. All project sites containing suitable habitat for burrowing owls, whether owls were found or not, require a 30-day preconstruction survey that shall be conducted within 30 days prior to ground disturbance to avoid direct take of burrowing owls. If the results of the survey indicate that no burrowing owls are present on-site, then the project may move forward with grading, upon Planning Division approval. If burrowing owls are found to be present or nesting on-site during the preconstruction survey, then the following recommendations must be adhered to: Exclusion and relocation activities may not occur during the breeding season, which is defined as March 1 through August 31, with the following exception: From March 1 through March 15 and from August 1 through August 31 exclusion and relocation activities may take place if it is proven to the City and appropriate regulatory agencies (if any) that egg laying or chick rearing is not taking place. This determination must be made by a qualified biologist." If construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. 32. Controlled Grading. Prior to any grading on the east half of the project, the Developer or appropriate representative shall meet and confer with the Pechanga Tribe and the Project archaeologist to discuss the need to develop a controlled grading plan. The purpose of the controlled grading on the east is to afford the opportunity to determine whether any subsurface resources, including human remains, could be identified and if so, to determine appropriate mitigation as determined in the provisions outlined in the Cultural Resources Treatment and Monitoring Agreement required in COA #25. All controlled grading shall be monitored according to the provisions of the Agreement. If it is determined by the Developer or appropriate representative, the Pechanga Tribe and the Project archaeologist at the meeting that controlled grading is not necessary at that time, all parties involved understand that the process of controlled grading still remains a viable option should important cultural resources be identified during grading and/or trenching activities. 33. Archaeologist Retained. Prior to beginning project construction, the Project Applicant shall retain a Riverside County qualified/City of Temecula approved archaeological monitor to monitor all ground-disturbing activities in an effort to identify any unknown archaeological resources. Any newly discovered cultural resource deposits shall be subject to a cultural resources evaluation. The archaeological monitor's authority to stop and redirect grading will be exercised in consultation with the Pechanga Tribe in order to evaluate the significance of any potential resources discovered on the property. Pechanga and archaeological monitors shall be allowed to monitor all grading, excavation and groundbreaking activities, and shall also have the limited authority to stop and redirect grading activities should an inadvertent cultural resource be identified. The archaeologist shall provide a final monitoring report at the end of all earthmoving activities to the City of Temecula, the Pechanga Tribe and the Eastern Information Center at UC, Riverside. 34. Human Remains. If human remains are encountered, California Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the Riverside County Coroner has made the necessary findings as to origin. Further, pursuant to California Public Resources Code Section 5097.98(b) remains shall be left in place and free from disturbance until a final decision as to the treatment and disposition has been made. If the Riverside County Coroner determines the remains to be Native American,the Native American Heritage Commission must be contacted within 24 hours. The Native American Heritage Commission must then immediately identify the "most likely descendant(s)" of receiving notification of the discovery. The most likely descendant(s) shall then make recommendations within 48 hours, and engage in consultations concerning the treatment of the remains as provided in Public Resources Code 5097.98 and the Treatment Agreement described in these conditions. Prior to Issuance of Building Permit 35. Transportation Uniform Mitigation Fee (TUMF). The City of Temecula adopted an ordinance on March 31, 2003 to collect fees for a Riverside County area wide Transportation Uniform Mitigation Fee (TUMF). This project is subject to payment of these fees at the time of building permit issuance. The fees are subject to the provisions of Chapter 15.08 of the Temecula Municipal Code and the fee schedule in effect at the time of building permit issuance. 36. Development Impact Fee (DIF). The developer shall comply with the provisions of Title 15, Chapter 15.06 of the Temecula Municipal Code and all its resolutions by paying the appropriate City fee. 37. Photometric Plan. The applicant shall submit a photometric plan, including the parking lot, to the Planning Division, which meets the requirements of the Development Code and the Riverside County Palomar Lighting Ordinance 655.All exterior LED light fixtures shall be 3,000 kelvin or below. The parking lot light standards shall be placed in such a way as to not adversely affect the growth potential of the parking lot trees. 38. Construction Landscaping and Irrigation Plans. Four (4) copies of Construction Landscaping and Irrigation Plans shall be reviewed and approved by the Planning Division. These plans shall be submitted as a separate submittal, not as part of the building plans or other plan set. These plans shall conform to the approved conceptual landscape plan, or as amended by these conditions. The location, number, height and spread, water usage or KC value, genus, species, and container size of the plants shall be shown. The plans shall be consistent with the Water Efficient Ordinance and Water Storage Contingency Plan per the Rancho California Water District. The plans shall be accompanied by the appropriate filing fee (per the City of Temecula Fee Schedule at time of submittal) and one copy of the approved Grading Plan. 39. Landscaping Site Inspections. The Landscaping and Irrigation Plans shall include a note stating, "Three landscape site inspections are required. The first inspection will be conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection will verify property landscape maintenance for release of the one-year landscape maintenance bond." The applicant/owner shall contact the Planning Division to schedule inspections. 40. Agronomic Soils Report. The Landscaping and Irrigation Plans shall include a note on the plans stating, "The contractor shall provide two copies of an agronomic soils report at the first irrigation inspection." 41. Water Usage Calculations. The Landscaping and Irrigation Plans shall include water usage calculations per Chapter 17.32 of the Development Code (Water Efficient Ordinance), the total cost estimate of plantings and irrigation (in accordance with approved plan). Applicant shall use evapotranspiration(ETo)factor of 0.70 for calculating the maximum allowable water budget. 42. Landscape Maintenance Program. A landscape maintenance program shall be submitted to the Planning Division for approval. The landscape maintenance program shall detail the proper maintenance of all proposed plant materials to assure proper growth and landscape development for the long-term esthetics of the property. The approved maintenance program shall be provided to the landscape maintenance contractor who shall be responsible to carry out the detailed program. 43. Specifications of Landscape Maintenance Program. Specifications of the landscape maintenance program shall indicate, "Three landscape site inspections are required. The first inspection will be conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection will verify property landscape maintenance for release of the one-year landscape maintenance bond." The applicant/owner shall contact the Planning Division to schedule inspections. 44. Irrigation. The landscaping plans shall include automatic irrigation for all landscaped areas and complete screening of all ground mounted equipment from view of the public from streets and adjacent property for private common areas; front yards and slopes within individual lots; shrub planting to completely screen perimeter walls adjacent to a public right-of-way equal to 66 feet or larger; and, all landscaping excluding City maintained areas and front yard landscaping which shall include, but may not be limited to, private slopes and common areas. 45. Precise Gradinci Plans. Precise Grading Plans shall be consistent with the approved rough grading plans including all structural setback measurements. 46. WQMP Landscape Compliance. The construction landscape plans shall be consistent with Appendix A, Table 31 of the Low Impact Development(LID) Manual for Southern California for plant materials and treatment facilities, and shall reference the approved precise grading plan for WQMP features. 47. Utility Screening. All utilities shall be screened from public view. Landscape construction drawings shall show and label all utilities and provide appropriate screening. Provide a three-foot clear zone around fire check detectors as required by the Fire Department before starting the screen. Group utilities together in order to reduce intrusion. Screening of utilities is not to look like an after-thought. Plan planting beds and design around utilities. Locate all light poles on plans and ensure that there are no conflicts with trees. 48. Quimby Reguirements. The developer shall satisfy the City's parkland dedication (Quimby) requirement through the payment of in-lieu fees based upon the City's then current land evaluation. Said requirement includes a credit for private recreational opportunities provided. Prior to Release of Power, Building Occupancy or Any Use Allowed by This Permit 49. Screening of Loading Areas. The applicant shall be required to screen all loading areas and roof mounted mechanical equipment from view of the adjacent residences and public right-of-ways. If upon final inspection it is determined that any mechanical equipment, roof equipment or backs of building parapet walls are visible from any portion of the public right-of-way adjacent to the project site, the developer shall provide screening by constructing a sloping tile covered mansard roof element or other screening reviewed and approved by the Director of Community Development. 50. Landscape Installation Consistent with Construction Plans. All required landscape planting and irrigation shall have been installed consistent with the approved construction plans and shall be in a condition acceptable to the Director of Community Development. The plants shall be healthy and free of weeds, disease, or pests. The irrigation system shall be properly constructed and in good working order. 51. Performance Securities. Performance securities, in amounts to be determined by the Director of Community Development, to guarantee the maintenance of the plantings in accordance with the approved construction landscape and irrigation plan, shall be filed with the Planning Division for a period of one year from final Certificate of Occupancy. After that year, if the landscaping and irrigation system have been maintained in a condition satisfactory to the Director of Community Development, the bond shall be released upon request by the applicant. 52. Installation of Site Improvements. All site improvements, including but not limited to, parking areas and striping shall be installed. 53. Compliance with Conditions of Approval. All of the foregoing conditions shall be complied with prior to occupancy or any use allowed by this permit. Outside Agencies 54. Compliance with Dept. of Environmental Health. The applicant shall comply with the recommendations set forth in the County of Riverside Department of Environmental Healths transmittal dated September 19, 2017, a copy of which is attached. 55. Compliance with EMWD. The applicant shall comply with the recommendations set forth in the Eastern Municipal Water District's transmittal dated March 10,2017,a copy of which is attached. 56. Compliance with Flood Control. The applicant shall comply with the recommendations set forth in the Rancho California Water District's transmittal dated (insert date), a copy of which is attached. 57. Compliance with Geotechnical. The applicant shall comply with the recommendations set forth in the Geocon West, Inc. transmittal dated October 11, 2017, a copy of which is attached. PUBLIC WORKS DEPARTMENT General Requirements 58. Conditions of Approval. The developer shall comply with all Conditions of Approval, the Engineering and Construction Manual and all City codes/standards at no cost to any governmental agency. 59. Entitlement Approval. The developer shall comply with the approved site plan, the conceptual Water Quality Management Plan (WQMP) and other relevant documents approved during entitlement. Any significant omission to the representation of site conditions may require the plans to be resubmitted for further review and revision. 60. Precise Grading Permit. A precise grading permit for on site improvements (outside of public right-of-way) shall be obtained from Public Works. 61. Haul Route Permit. A haul route permit may be required when soils are moved on public roadways to or from a grading site. The developer/contractor is to verify if the permit is required. If so, he shall comply with all conditions and requirements per the City's Engineering and Construction Manual and as directed by Public Works. 62. Encroachment Permits. Prior to commencement of any applicable construction,encroachment permit(s) are required; and shall be obtained from Public Works for public offsite improvements. 63. Street Improvement Plans. The developer shall submit public street improvement plans for review and approval by Public Works. The plans shall be in compliance with Caltrans and City codes/standards; and shall include, but not limited to, plans and profiles showing existing topography, existing/proposed utilities, proposed centerline, top of curb and flowline grades. 64. Signing & Striping Plan. A signing & striping plan, designed by a registered civil engineer per the latest edition of Caltrans MUTCD standards, shall be included with the street improvement plans for approval. 65. Vehicular/Traffic Movement Restrictions. The developer shall comply with the following vehicular movements restrictions: a. The access from Temecula Parkway shall be restricted to a right-in movement only. b. The access onto Pechanga Parkway shall be restricted to a right-in/right-out movement only. Prior to Issuance of a Grading Permit 66. Environmental Constraint Sheet(ECS). The developer shall comply with all constraints per the recorded ECS with any underlying maps related to the subject property. 67. Abutter's Rights of Access. Prior to issuance of any grading permit, the developer shall submit for review and approval, a vacation and dedication of the abutters' rights of access along Pechanga Parkway pursuant to the new driveway location. 68. Grading/Erosion & Sediment Control Plan. The developer shall submit a grading/erosion & sediment control plan(s) to be reviewed and approved by Public Works. All plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site. The approved plan shall include all construction-phase pollution-prevention controls to adequately address non-permitted runoff. Refer to the City's Engineering & Construction Manual at: www.TemeculaCA.gov/ECM 69. Erosion & Sediment Control Securities. The developer shall comply with the provisions of Chapter 24, Section 18.24.140 of the Temecula Municipal Code by posting security and entering into an agreement to guarantee the erosion & sediment control improvements. 70. NPDES General Permit Compliance. The developer shall obtain project coverage under the State National Pollutant Discharge Elimination System (NPDES) General Permit for Construction Activities and shall provide the following: a. A copy of the Waste Discharge Identification Number (WDID) issued by the State Water Resources Control Board (SWRCB); b. The project's Risk Level (RL) determination number; and c. The name, contact information and certification number of the Qualified SWPPP Developer (QSD) Pursuant to the State Water Resources Control Board (SWRCB) requirements and City's storm water ordinance, a Storm Water Pollution Prevention Plan (SWPPP) shall be generated and submitted to the Board. Throughout the project duration, the SWPPP shall be routinely updated and readily available (onsite) to the State and City. Review www.cabmphandbooks.com for SWPPP guidelines. Refer to the following link: http://www.waterboards.ca.gov/water issues/programs/stormwater/construction.shtml 71. Water Quality Management Plan (WQMP) and O&M Agreement. The developer shall submit a final WQMP (prepared by a registered professional engineer) with the initial grading plan submittal, based on the conceptual WQMP from the entitlement process. It must receive acceptance by Public Works. A copy of the final project-specific WQMP must be kept onsite at all times. In addition, a completed WQMP Operation and Maintenance(O&M)Agreement shall be submitted for review and approval. Upon approval from City staff,the applicant shall record the O&M agreement at the County Recorder's Office in Temecula. Refer to the WQMP template and agreement link below: www.TemeculaCA.gov/WQMP 72. Drainage. All applicable drainage shall be depicted on the grading plan and properly accommodated with onsite drainage improvements and water quality facilities, which shall be privately maintained. Alterations to existing drainage patterns or concentration and/or diverting flows is not allowed unless the developer constructs adequate drainage improvements and obtains the necessary permissions from the downstream property owners. All drainage leaving the site shall be conveyed into a public storm drain system, if possible. The creation of new cross lot drainage is not permitted. 73. Drainage Study. A drainage study shall be prepared by a registered civil engineer and submitted to Public Works with the initial grading plan check in accordance with City, Riverside County and engineering standards. The study shall identify storm water runoff quantities (to mitigate the 10 and 100-year storm event for 24 hour storm duration peak flow) from the development of this site and upstream of the site. It shall identify all existing or proposed offsite or onsite, public or private, drainage facilities intended to discharge this runoff. Runoff shall be conveyed to an adequate outfall capable of receiving the storm water runoff without damage to public or private property. The study shall include a capacity analysis verifying the adequacy of all facilities. Any upgrading or upsizing of drainage facilities necessary to convey the storm water runoff shall be provided as part of development of this project. 74. Soils Report. A soils report, prepared by a registered soil or civil engineer, shall be submitted to Public Works with the initial grading plan submittal. The report shall address the site's soil conditions and provide recommendations for the construction of engineered structures and preliminary pavement sections. 75. Letter of Permission/Easement. The developer shall obtain documents (letters of permission or easements)for any offsite work performed on adjoining properties. The document's format is as directed by, and shall be submitted to, Public Works for acceptance. The document information shall be noted on the approved grading plan. 76. Sight Distance. The developer shall limit landscaping in the corner cut-off area of all street intersections and adjacent to driveways to provide for minimum sight distance and visibility. 77. Habitat Conservation Fee. The developer shall comply with the provisions of Chapter 8.24 of the Temecula Municipal Code (Habitat Conservation) by paying the appropriate fee set forth in the ordinance or by providing documented evidence that the fees have already been paid. Prior to Issuance of Encroachment Permit(s) 78. Public Utility Agency Work. The developer shall submit all relevant documentation due to encroaching within City right-of-way; and is responsible for any associated costs and for making arrangements with each applicable public utility agency. 79. Traffic Control Plans. A construction area traffic control plan (TCP) will be required for lane closures and detours or other disruptions to traffic circulation; and shall be reviewed and approved by Public Works. The TCP shall be designed by a registered civil or traffic engineer in conformance with the latest edition of the Caltrans Manual on Uniform Traffic Control Devices (MUTCD) and City standards. 80. Improvement Plans. All improvement plans (including but not limited to street, storm drain, traffic) shall be reviewed and approved by Public Works. 81. Street Trenching. All street trenches shall conform to City Standard No. 407; refer to the City's Paving Notes. Prior to Issuance of Building Permit(s) 82. Certifications. Certifications are required from the registered civil engineer-of-record certifying the building pad elevation(s) per the approved plans and from the soil's engineer-of-record certifying compaction of the building pad(s). Prior to Issuance of a Certificate of Occupancy 83. Completion of Improvements. The developer shall complete all work per the approved plans and Conditions of Approval to the satisfaction of the City Engineer. This includes all on site work (including water quality facilities), public improvements and the executed WQMP Operation and Maintenance agreement. 84. Utility Agency Clearances. The developer shall receive written clearance from applicable utility agencies(i.e., Rancho California and Eastern Municipal Water Districts, etc.)for the completion of their respective facilities and provide to Public Works. 85. Replacement of Damaged Improvements/Monuments. Any appurtenance damaged or broken during development shall be repaired or removed and replaced to the satisfaction of Public Works. Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professional Code Section 8771. 86. Certifications. All necessary certifications and clearances from engineers, utility companies and public agencies shall be submitted as required by Public Works. BUILDING AND SAFETY DIVISION General Requirements 87. Final Building and Safety Conditions. Final Building and Safety conditions will be addressed when building construction plans are submitted to Building and Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. 88. Compliance with Code. All design components shall comply with applicable provisions of the 2016 edition of the California Building, Plumbing and Mechanical Codes; 2016 California Electrical Code; California Administrative Code, 2016 California Energy Codes, 2016 California Green Building Standards, California Title 24 Disabled Access Regulations, and City of Temecula Municipal Code. 89. ADA Access. Applicant shall provide details of all applicable disabled access provisions and building setbacks on plans to include: a.. Disabled access from the public way to the main entrance of the building. b. Van accessible parking located as close as possible to the main entry. c.. Accessible path of travel from parking to furthest point of improvement. d. Accessible path of travel from public right-of-way to all public areas on site, and to trash enclosure. 90. County of Riverside Mount Palomar Ordinance. Applicant shall submit, at time of plan review, a complete exterior site lighting plan showing compliance with County of Riverside Mount Palomar Ordinance Number 655 for the regulation of light pollution. All streetlights and other outdoor lighting shall be shown on electrical plans submitted to the Building and Safety Division. Any outside lighting shall be hooded and aimed not to shine directly upon adjoining property or public rights-of-way. All exterior LED light fixtures shall be 3,000 kelvin or below. 91. Street Addressing. Applicant must obtain street addressing for all proposed buildings by requesting street addressing and submitting a site plan for commercial or multi-family residential projects or a recorded final map for single-family residential projects. 92. Clearance from TVUSD. A receipt or clearance letter from the Temecula Valley Unified School District shall be submitted to the Building and Safety Department to ensure the payment or exemption from School Mitigation Fees. 93. Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work. 94. Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards, and any block walls will require separate approvals and permits. Solid covers are required over new and existing trash enclosures. 95. Demolition. Demolition permits require separate approvals and permits. 96. Sewer and Water Plan Approvals. On-site sewer and water plans will require separate approvals and permits. 97. Hours of Construction. Signage shall be prominently posted at the entrance to the project, indicating the hours of construction, as allowed by the City of Temecula Municipal Ordinance 9.20.060, for any site within one-quarter mile of an occupied residence. The permitted hours of construction are Monday through Saturday from 7:00 a.m.to 6:30 p.m. No work is permitted on Sundays and nationally recognized Government Holidays. 98. House Electrical Meter. Provide a house electrical meter to provide power for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each building on the site. Developments with single user buildings shall clearly show on the plans how the operation of exterior lighting and fire alarm systems when a house meter is not specifically proposed. 99. Protection of drains and penetration. Protection of joints and penetrations in fire resistance-rated assemblies shall not be concealed from view until inspected for all designed fire protection. Required fire seals/fire barriers in fire assemblies at fire resistant penetrations shall be installed by individuals with classification or certification covering the installation of these systems. Provide certification for the installation of each area and certification of compliance for Building Official's approval. At Plan Review Submittal 100. Submitting Plans and Calculations. Applicant must submit to Building and Safety four (4) complete sets of plans and two (2) sets of supporting calculations for review and approval including: a. An electrical plan including load calculations and panel schedule, plumbing schematic, and mechanical plan applicable to scope of work. b. A Sound Transmission Control Study in accordance with the provisions of the Section 1207, of the 2016 edition of the California Building Code. c. A precise grading plan to verify accessibility for persons with disabilities. d. Truss calculations that have been stamped by the engineer of record of the building and the truss manufacturer engineer. Prior to Issuance of Grading Permit(s) 101. Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted separately from the building plans, shall be submitted to Building and Safety for review and approval. 102. Demolition Permits. A demolition permit shall be obtained if there is an existing structure to be removed as part of the project. Prior to Issuance of Building Permit(s) 103. Plans Require Stamp of Registered Professional. Applicant shall provide appropriate stamp of a registered professional with original signature on the plans. Prior to Beginning of Construction 104. Pre-Construction Meeting. A pre-construction meeting is required with the building inspector prior to the start of the building construction. FIRE PREVENTION General Requirements 105. Fire Hydrants. The Fire Prevention Bureau is required to set minimum fire hydrant distances per CFC Appendix C. Standard fire hydrants (6" x4" x (2) 2 '/2"outlets) shall be located on fire access roads and adjacent public streets. For all Commercial projects hydrants shall be spaced at 350 feet apart, and shall be located no more than 210 feet from any point on the street or Fire Department access road(s)frontage to a hydrant. The required fire flow shall be available from any adjacent hydrant(s) in the system. The upgrade of existing fire hydrants may be required (CFC Appendix C and Temecula City Ordinance 15.16.020). 106. Fire Dept. Plan Review. Final fire and life safety conditions will be addressed when building plans are reviewed by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC), and related codes which are in force at the time of building plan submittal. 107. Fire Flow. The Fire Prevention Bureau is required to set a minimum fire flow for the remodel or construction of all commercial and residential buildings per CFC Appendix B. The developer shall provide for this project, a water system capable of delivering 2,500 GPM at 20-PSI residual operating pressure for a 4-hour duration for this commercial projects. The fire flow as given above has taken into account all information as provided. The fire flow can be divided between the on site private fire hydrant and one off site public hydrant.(CFC Appendix B and Temecula City Ordinance 15.16.020). Prior to Issuance of Grading Permit(s) 108. Access Road Widths. Fire Department vehicle access roads shall have an unobstructed width of not less than 24 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches (CFC Chapter 5 and City Ordinance 15.16.020). 109. Two Point Access. This development shall maintain two points of access, via all-weather surface roads, as approved by the Fire Prevention Bureau (CFC Chapter 5). 110. All Weather Access Roads. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be with a surface to provide all-weather driving capabilities. Access roads shall be 80,000 lbs. GVW with a minimum of AC thickness of .25 feet. In accordance with Section 3310.1, prior to building construction, all locations where structures are to be built shall have fire apparatus access roads. (CFC Chapter 5 and City Ordinance 15.16.020). 111. Gradient Of Access Roads. The gradient for fire apparatus access roads shall not exceed 15 percent(CFC Chapter 5 and City Ordinance 15.16.020). Prior to Issuance of Building Permit(s) 112. Required Submittals (Fire Underground Water). The developer shall furnish three copies of the water system plans to the Fire Prevention Bureau for approval prior to installation for all private water systems pertaining to the fire service loop. The underground plans will show the underground pipe going into the building 6-inches above finished floor. Plans shall be signed by a registered civil engineer, contain a Fire Prevention Bureau approval signature block, and conform to hydrant type, location, spacing and minimum fire flow standards. Hydraulic calculations will be required with the underground submittal to ensure fire flow requirements are being met for the on-site hydrants. The plans must be submitted and approved prior to building permit being issued (CFC Chapter 33 and Chapter 5). 113. Required Submittals (Fire Sprinkler Systems). Fire sprinkler plans shall be submitted to the Fire Prevention Bureau for approval. Three sets of sprinkler plans must be submitted by the installing contractor to the Fire Prevention Bureau. These plans must be submitted prior to the issuance of building permit. 114. Required Submittals (Fire Alarm Systems). Fire alarm plans shall be submitted to the Fire Prevention Bureau for approval. Three sets of alarm plans must be submitted by the installing contractor to the Fire Prevention Bureau. The fire alarm system is required to have a dedicated circuit from the house panel. These plans must be submitted prior to the issuance of building permit. Prior to Issuance of Certificate of Occupancy 115. Gates and Access. All manual and electronic gates on required Fire Department access roads or gates obstructing Fire Department building access shall be provided with the Knox Rapid entry system for emergency access by fire fighting personnel (CFC Chapter 5). 116. Hydrant Verification. Hydrant locations shall be identified by the installation of reflective markers (blue dots) (City Ordinance 15.16.020). 117. Knox Box. A"Knox-Box"shall be provided. The Knox-Box shall be installed a minimum of six feet in height and be located to the right side of the fire riser sprinkler room (CFC Chapter 5). 118. Addressing. New buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Commercial buildings shall have a minimum of 12-inch numbers with suite numbers being a minimum of six inches in size. All suites shall have a minimum of 6-inch high letters and/or numbers on both the front and rear doors. (CFC Chapter 5 and City Ordinance 15.16.020). 119. Site Plan. The applicant shall prepare and submit to the Fire Department for approval, a site plan designating fire lanes with appropriate lane painting and/or signs (CFC Chapter 5). 120. Additional Submittals (Fire Above/Below Ground Tanks). The developer/applicant shall be responsible for obtaining underground and/or aboveground tank permits for the storage of combustible liquids, flammable liquids or any other hazardous materials from both the County Health Department and Fire Prevention Bureau. These permits are separate from any building permits or environmental health permits. (CFC Chapter 57 and City Ordinance 15.16.020). 121. Additional Submittals (Hazardous Materials). The applicant shall submit for review and approval by the City Fire Department a Hazardous Material Inventory Statement and Fire Department Technical Report. Afull hazardous materials inventory report and color coded floor plan is required for any building storing or using hazardous materials (CFC Chapters 1 and 50 through 67 and City Ordinance 15.16.020). POLICE DEPARTMENT General Requirements 122. Landscape Height. The applicant shall ensure all landscaping surrounding all buildings are kept at a height of no more than three feet or below the ground floor window sills. Plants, hedges and shrubbery shall be defensible plants to deter would-be intruders from breaking into the buildings utilizing lower level windows. 123. Tree Pruning. The applicant shall ensure all trees surrounding all building rooftops be kept at a distance to deter roof accessibility by "would-be burglars." Since trees also act as a natural ladder, the branches must be pruned to have a six-foot clearance from the buildings. 124. Berm Height. Berms shall not exceed three feet in height. 125. Parking Lot Lighting. All parking lot lighting shall be energy saving and minimized after hours of darkness and in compliance with Title 24, Part 6, of the California Code of Regulations. 126. Exterior Door Lighting. All exterior doors shall have a vandal resistant light fixture installed above the door. The doors shall be illuminated with a minimum one-foot candle illumination at ground level, evenly dispersed. 127. Exterior Building Lighting. All lighting affixed to the exterior of buildings shall be wall mounted light fixtures to provide sufficient lighting during hours of darkness. 128. Outdoor Lighting During Non-Business Hours. The applicant shall comply with the Governor's order to address the power crisis. This order became effective March 18, 2001 calling for a substantial reduction from businesses to cut usage during non-business hours. The order, in part, states, "All California retail establishments, including, but not limited to, shopping centers, auto malls and dealerships, shall substantially reduce maximum outdoor lighting capability during non-business hours except as necessary for the health and safety of the public, employees or property." Failure to comply with this order following a warning by law enforcement officials shall be punishable as a misdemeanor with a fine not to exceed $1,000 in accordance with Title 24, Part 6, of the California Code of Regulations. 129. Commercial or Institutional Grade Hardware. All doors,windows, locking mechanisms, hinges, and other miscellaneous hardware shall be commercial or institution grade. 130. Graffiti Removal. Any graffiti painted or marked upon the buildings must be removed or painted over within 24 hours of being discovered. Report all such crimes to the Temecula Police 24-hour dispatch Center at(951) 696-HELP. 131. Alarm System. Upon completion of construction, the buildings shall have a monitored alarm system installed and monitored 24 hours a day by a designated private alarm company to notify the Temecula Police Department of any intrusion. All multi-tenant offices/suites/businesses located within a specific building shall have their own alarm system. This condition is not applicable if the business is opened 24/7. 132. Roof Hatches. All roof hatches shall be painted "International Orange." 133. Rooftop Addressing. The construction plans shall indicate the application of painted rooftop addressing plotted on a nine-inch grid pattern with 45-inch tall numerals spaced nine inches apart. The numerals shall be painted with a standard nine-inch paint roller using fluorescent yellow paint applied over a contrasting background. The address shall be oriented to the street and placed as closely as possible to the edge of the building closest to the street. 134. Public Telephones. Any public telephones located on the exterior of the buildings shall be placed in a well-lit, highly visible area, and installed with a "call-out only" feature to deter loitering. This feature is not required for public telephones installed within the interior of the buildings. 135. ADA Parking. All disabled parking stalls on the premises shall be marked in accordance with Section 22511.8 of the California Vehicle Code. 136. Compliance with State Department of Alcoholic Beverage Control. Any business that serves or sells any type of alcoholic beverages will comply with all guidelines within the Business and Profession Codes and all other guidelines associated with the State Department of Alcoholic Beverage Control. 137. Business Security Survey. Businesses desiring a business security survey of their location can contact the Crime Prevention and Plans Unit of the Temecula Police Department at (951) 695-2773. 138. Questions Regarding Conditions. Any questions regarding these conditions should be directed to the Temecula Police Department Crime Prevention and Plans Unit at(951) 695-2773. ¢Oaµi x tq,y County of Riverside DEPARTMENT OF ENVIRONMENTAL HEALTH r - w P.O.BOX 7909 • RIVERSIDE,CA 92513-7909 oG�AYOF RNO! STEVE VAN STOCKUM,DIRECTOR September 19,2017 City of Temecula Planning Department Attn: Scott Cooper 41000 Main Street Temecula CA 92590 SUBJECT: CITY OF TEMECULA—PA17-0318 PECIIANGA SQUARE DP APN: 961-440-016 Dear Mr. Cooper: In accordance with the agreement between the County of Riverside, Department of Environmental Health(DEH)and the City of Temecula, DEH offers the following comments for the project(s)listed in the subject heading of this letter: POTABLE WATER AND SANITARY SEWER A general condition shall be placed on this project indicating that it will be serviced by Rancho California Water District(RCWD)for both water and sanitary sewer service. As the sewer agency,RCWD shall have the responsibility of determining any grease interceptor or other requirements, including but not limited to sizing capacity and other structural specifications. Please note that it is the responsibility of the proposed facility to ensure that all requirements to receive potable water service and sanitary sewer service are met with the appropriate purveyors, as well as, all other applicable agencies. Note:A General Condition shall be placed on this project indicating that any existing wells and/or existing onsite wastewater treatment systems(OWTS)shall be properly removed and/or abandoned under permit with the Department of Environmental Health(DEH). ENVIRONMENTAL CLEANUPS PROGRAM Based on the information provided in the environmental assessment documents submitted for this project and with the provision that the information was accurate and representative of site conditions, RCDEH-ECP concludes no further environmental assessment is required for this project. If contamination or the presence of a naturally occurring hazardous material is discovered at the site,assessment,investigation,and/or cleanup may be required. Contact RCDEH-ECP at(95 1) 955-8980, for further information. Office Locations Blythe a Corona + Hemet + Indio + Murrieta Palm Springs & Riverside Phone(888)722-4234 www.rivcoeh.org DISTRICT ENVIRONMENTAL SERVICES (DES) For the food facility prior to issuance of Building and Safety permit, the food facility plans will be reviewed by DES to ensure compliance with applicable California Health and Safety Code/California Retail Food Code. An annual operating permit for the food facility will be required. Please contact your local DES office located in Murrieta at(951)461-0284. HAZARDOUS MATERIALS MANAGEMENT BRANCH (HMMB) Construction plans must be reviewed and approved by the Hazardous Materials Division prior to the installation of the underground storage tank(UST) system. Prior to conducting a Building Final,the facility shall require a business emergency plan for the storage of any hazardous materials, greater than 55 gallons, 200 cubic feet or 500 pounds,or any acutely hazardous materials or extremely hazardous substances. If further review of the site indicates additional environmental health issues, HMMB reserves the right to regulate the business in accordance with applicable County Ordinances. Please contact HMMB at(951)358-5055 to obtain information regarding any additional requirements. INDUSTRIAL HYGIENE As of July 1,2017, this Department no longer conducts any evaluation for noise. It will be the responsibility of the City to address this aspect of the project. Should you have any further questions or require further assistance,please contact me by email at kakim(u;rivco.ors or by phone at(951)955-8980. Sincerely, Kristine Kim,REHS Environmental Protection and Oversight Division Land Use and Water Resources Program emw■`fir...-i March 10, 2017 Mr. Scott Cooper City of Temecula 41000 Main Street Temecula, CA. 92590 Subject: Case No. PA 17-0318 APN: 961-440-010 and 961-440-016 Location: SWC of Temecula Parkway and Pechanga Parkway Project Description: New to Industry Gasoline Service Station Dear Mr. Cooper: Thank you for the opportunity to review the above-referenced project. The subject Project may require either water, sewer and/or recycled water service from EMWD. Detail of the proposed development requires a submittal to EMWD by the project proponent. Upon receipt of submittal, EMWD will review further and provide requirements for obtaining service which include but are not limited to: 1. Review of the project within the context of existing infrastructure, 2. Evaluation of the project's preliminary design and points of connection. 3. Formal Application for Service detailing applicable fees and deposits to proceed with EMWD approved service connections. To begin the submittal process the project proponent may contact EMWD's New Business Department at: Eastern Municipal Water District New Business Department 2270 Trumble Road Perris, CA 92570 (951)928-3777, Extension 2081 2270 Trumble Road - P.O.Box 8300 - Perris,CA 92572-8300 T951.928.3777 - F951.928.6177 emwd.org II Mr.Scott Cooper March 10,2017 Page 2 Again, EMWD appreciates the opportunity to comment on this project. Sincerely, Mindy D. Pry Administrative Assistant I New Business Department Eastern Municipal Water District mdp EASTERN MUNICIPAL WATER DISTRICT JASON E. UHLEY 1995 MARKET STR FET General Manager-Chief Cnginca Ar Im RIVERSIDE,CA 92501 °; 11L 951.955.1200 q ' FAX 95 1.788.9965 tee, , www.rcflood.org RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT March 22,2017 City of Temecula Planning Department Post Office Box 9033 Temecula,CA 92589-9033 Attention: Scott Cooper Ladies and Gentlemen: Re: PA 17-0318 The District does not normally recommend conditions for land divisions or other land use cases in incorporated cities. The District also does not plan check city land use cases, or provide State Division of Real Estate letters or other flood hazard reports for such cases. District comments/recommendations for such cases are normally limited to items of specific interest to the District including District Master Drainage Plan facilities, other regional flood control and drainage facilities which could be considered a logical component or extension of a master plan system, and District Area Drainage Plan fees (development mitigation fees). In addition,information of a general nature is provided. The District has not reviewed the proposed project in detail and the following comment does not in any way constitute or imply District approval or endorsement of the proposed project with respect to flood hazard,public health and safety or any other such issue: This project would not be impacted by District Master Drainage Plan facilities nor are other facilities of regional interest proposed. GENERAL INFORMATION This project may require a National Pollutant Discharge Elimination System(NPDES)permit from the State Water Resources Control Board. Clearance for grading,recordation or other final approval should not be given until the City has determined that the project has been granted a permit or is shown to be exempt. If this project involves a Federal Emergency Management Agency(FEMA)mapped floodplain, the City should require the applicant to provide all studies,calculations,plans and other information required to meet FEMA requirements, and should further require the applicant obtain a Conditional Letter of Map Revision(CLOMR)prior to grading, recordation or other final approval of the project,and a Letter of Map Revision(LOMB)prior to occupancy. If a natural watercourse or mapped floodplain is impacted by this project, the City should require the applicant to obtain a Section 1602 Agreement from the California Department of Fish and Wildlife and a Clean Water Act Section 404 Permit from the U.S.Army Corps of Engineers,or written correspondence from these agencies indicating the project is exempt from these requirements. A Clean Water Act Section 401 Water Quality Certification may be required from the local California Regional Water Quality Control Board prior to issuance of the Corps 404 permit. Very truly yowl, EDWIN QUI, UNI . Engineering Project Manager c: Riverside County Planning Department Attn: K.risti Lovelady HY:mcv P81211172 GEOCON W E S T, I N C. G E O T E C H N I CAL * ENVIRONMENTAL • MATERIALS Project No.T2652-22-05 October 11,2017 Earth Strata Geotechnical Services,Inc. 42184 Remington Avenue Temecula,California 92590 Attention: Mr.Stephen Poole,GE Subject: GEOTECHNICAL THIRD-PARTY REVIEW PA17-0318 76 SERVICE STATION PECHANGA PARKWAY SWC TEMECULA AND PECHANGA PARKWAYS TEMECULA,CALIFORNIA References: 1) Response to Geocon West, Inc.'s Third Geotechnical Third-Party Review, Proposed Commercial Development, Assessor's Parcel Number 961-440-010 and 961-440-016, Located on the Southwest Corner of Temecula Parkway and Pechanga Parkway, City of Temecula,Riverside County, California,Earth Strata Geotechnical Services,Inc.,Project No. 171610-7013,dated October 11,2017. 2) Response to Geocon West, Inc.'s Second Geotechnical Third-Party Review, Proposed Commercial Development, Assessor's Parcel Number 961-440-010 and 961-440-016, Located on the Southwest Corner of Temecula Parkway and Pechanga Parkway, City of Temecula, Riverside County, California,Earth Strata Geotechnical Services,Inc.,Project No. 171610-7013,dated October 4,2017. 3) Response to Geocon West, Inc.'s Geotechnical Third-Party Review, Proposed Commercial Development, Assessor's Parcel Numbers 961-440-010 and 961-440-016, Located Southwest Corner of Temecula Parkway and Pechanga Parkway, City of Temecula, Riverside County, California prepared by Earth Strata Geotechnical Services, Inc.,dated September 15,2017. 4) Preliminary Geotechnical Interpretive Report, Proposed Commercial Development, Assessor's Parcel Number 961-440-010 and 961-440-016, Located on the Southwest Corner of TEMECUAL Parkway and Pechanga Parkway, City of Temecula, Riverside County, California, prepared by Earth Strata Geotechnical Services, Inc., Project 171610-10A dated February 3,2017. Dear Mr.Poole: In accordance with the request of Mr. Scott Cooper with the city of Temecula, Geocon West, Inc. (Geocon) has completed a third-party review of the second response (Reference 1) to our review comments dated September 8,and October 3,2017.The purpose of the review is to present our opinion regarding the suitability of the study,conclusions,and recommendations provided within the referenced document. Geocon's review is based on County of Riverside Technical Guidelines for the Review of Geotechnical and Geologic Reports 2000 Edition, Riverside County Flood Control and Water 41571 Corning Place,Suite 101 a Murrieta,California 92562-7065 + Telephone 951.304.2300 a Fax 951 304.2392 Conservation District Design HandbookforLow Impact Development Best Management Practices dated September 2011,California Geological Survey Special Publication 117A, Guidelinesfor Evaluating and Mitigating Seismic Hazards in California and Note 49 dated 2008,and City of Temecula Standard Plans. CONCLUSIONS Based on our review of the referenced documents,it is our opinion that Geocon's review comments have been adequately addressed and the referenced documents conform to Riverside County Technical Guidelines for Review of'Geotechnical and Geologic Reports(2000 Edition). Should you have any questions regarding this letter, or if we may be of further service,please contact the undersigned at your convenience. Very truly yours, yS%p�IA1 CFO GEOCON WEST,INC Ott, � 1 SA A. 00 �QpOPESS/p SA WIN S �e� RED * f� ?7!4! J to O!'OLAOt8T No.2B9U Z ,'`'Lisa A. Battiato 'FCAChet E.Robinson * # CEG 2316 GE 2890 OF LAB:CER:hd pO�" Distribution:(1)Addressee (1)City of Temecula Planning Department,Attn: Scott Cooper Geocon Project No.T2652-22-05 -2- October 10,2017