Loading...
HomeMy WebLinkAbout01-072 CC ResolutionRESOLUTION NO. 01-72 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TEMECULA ADOPTING SPECIFIC PLAN NO. 13 (PLANNING APPLICATION NO. 99-0418) ON PARCELS TOTALING 550 ACRES LOCATED EAST OF INTERSTATE 15, NORTH OF SANTA GERTRUDIS CREEK, WEST OF MARGARITA ROAD AND SOUTH OF THE NORTHERN CITY LIMIT THE CITY COUNCIL OF THE CITY OF TEMECULA DOES RESOLVE AS FOLLOWS: Section 1. Procedural History. The City Council of the City of Temecula does hereby find, determine and declare that: a. Lennar Communities ("Owner") filed Planning Application No PA99-0419 (General Plan Amendment), PA99-0418 (Specific Plan, Development Code Amendment and Specific Plan Zoning Standards), PA 00-0189 (Environmental Impact Report), PA 99-0245 (Change of Zone), PA99-0446 (Development Agreement), PA00-0295 (Tentative Tract Map 29639), PA01- 0030 (Tentative Tract Map 29928), PA01-0031 (Tentative Tract Map 29929), and PA01-0032 (Tentative Tract Map No. 30088) (the "Application") in accordance with the City of Temecula General Plan and Development Code for land use approvals for a 550 acre planned community located adjacent to and east of Interstate 15, north of Santa Gertrudis Creek, west of Margarita Road, south of the northern City Limit which area includes the following parcels as designated by Assessor Parcel Numbers: 910-261-001,910-261-002, 910-110-013, 910-110-015, 910-110-020, 910-110-021,910-110-027, 910-110-076, 910-100-007, 910-100-008, 910-060-009, 910-120-003, 910-120-007, 910-120-008, 911-630-001,911-830-002, 911-630-003, 911-640-001,911-640-002, 911-180-002, 911-180-003, 911-180-004, 911-180-008, 911-180-009, 911-180-015, 911-180-023 AND 911-180-028 ("Project"). b. On June 20, 2001 and July 12, 2001, the Planning Commission of the City of Temecula held duly noticed public hearings on the Project at which time all persons interested in.the Project had the opportunity and did address the Planning Commission on these matters. c. Following consideration of the entire record of information received at the public hearings and due consideration of the proposed Project, the Planning Commission adopted Resolution No. 2001-025 recommending to the City Council that the Project be approved, subject to certain recommended conditions. d. On July 24, 2001 and August 14, 2001, the City Council of the City of Temecula held duly noticed public hearings on the Project at which time all persons interested in the Project had the opportunity and did address the City Council on these matters. e. Following consideration of the entire record of information received at the public hearings before the Planning Commission and the City Council, and due consideration of the proposed Project, the City Council adopted Resolution No. 01-70, entitled "A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TEMECULA CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT PREPARED FOR THE HARVESTON SPECIFIC PLAN AND RELATED ACTIONS, AND ADOPTING THE FINDING PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT, A STATEMENT OF OVERRIDING CONSIDERATIONS, AND A MITIGATION MONITORING AND REPORTING PROGRAM IN CONNECTION THEREWITH FOR THE R:/Resos 2001/Resos 01-72 I HARVESTON SPECIFIC PLAN, LOCATED EAST OF INTERSTATE 15, NORTH OF SANTA GERTRUDIS CREEK, WEST OF MARGARITA ROAD AND SOUTH OF THE NORTHERN CITY LIMITS (PLANNING APPLICATION NO. 00-0189)." The Final Environmental Impact Report (FEIR) and mitigation monitoring reporting program accurately addresses the impacts associated with the adoption of this Resolution. Section 2. Findin.qs. That the City Council, in approving the Application, hereby makes the following findings: A. The Project as proposed and conditioned is compatible with the health, safety and welfare of the community. The Project has been reviewed and determined to be in conformance with the City's General Plan. These documents set policies and standards that protect the health, safety and welfare of the community. Access and circulation are adequate for emergency vehicles. The two excluded parcels not under the applicant's ownership that are located within the Specific Plan shall hereby be re-designated to become compatible with the surrounding land uses of the Harveston Specific Plan. The City hereby finds it necessary to change the Land Use Designation of the two excluded parcels to ensure the public health, safety and welfare of the City and to facilitate future development of these two parcels by removing the requirement for a separate Specific Plan. B. The Project is compatible with surrounding land uses. The Project proposes similar residential neighborhoods adjacent to existing surrounding neighborhoods, with interface buffers and full roadway improvements. The limited neighborhood commercial development is proposed within a Village Center and is designed to be pedestrian oriented to serve the needs of the Harveston community. The Service Commercial is west of Ynez Road, adjacent to Interstate 15 where similar commercial and retail uses currently exist along the Interstate corridor. C. The proposed Project will not have an adverse effect on the community because it remains consistent with the goals and policies of the adopted General Plan. The Project does not represent a significant change to the planned land uses for the site. The General Plan Amendment is a relocation and reallocation of existing land use designations that conforms to the design of the specific plan. Section 3. Further Findings. That the City Council, in approving the Application, hereby makes the following findings as required in Chapter 17.16 of the Temecula Municipal Code: A. The proposed specific plan is consistent with the General Plan, as it is proposed to be amended, and compatible with the Development Code. The findings of General Plan consistency are attached as Exhibit A and incorporated herein as though set forth in full. The proposed Specific Plan is consistent with the goals and policies of the general plan. The Specific Plan is a reallocation and redistribution of the majority of the existing Land Use Designations and serves as an implementation tool for the General Plan. Therefore, as proposed, the Specific Plan is consistent with the general plan, as it is proposed to be amended, and development code. B. The proposed Specific Plan would not be detrimental to the public interest, health, safety, convenience or welfare of the city. The proposed Specific Plan has been reviewed and determined to be in conformance with the City's General Plan (as it is proposed to be amended), and Growth Management Action Plan. These documents set policies and standards that protect the health, safety and welfare of the community. In addition, the Specific Plan is a master planned community with specific design guidelines and standards that ensure compatibility and interlace with the surrounding community in terms of density, design and circulation. Therefore, as proposed, conditioned and designed, the Specific Plan is compatible with the health, safety and welfare of the R~ Resos 2001/Resos 01-72 2 community. C. The subject property is physically suitable for the requested land use designations and the anticipated land use developments. There are no physical constraints of the site which would preclude or prohibit the requested land use designations or anticipated developments. Moreover, the proposed Specific Plan land uses are consistent with the land uses of the General Plan and will serves as the tool to regulate and implement the goals and policies of the General Plan. The applicant has submitted applications for Tentative Tract Maps which indicate that the site is physically suitable for the land uses and development proposed in the Specific Plan. D. The proposed Project shall ensure development of desirable character which will be compatible with existing and proposed development in the surrounding neighborhood. The Project proposes similar residential land uses adjacent to the existing surrounding neighborhoods, with extensive landscape buffers and interfaces. The limited neighborhood commercial development is proposed within a Village Center and is designed to be pedestrian oriented to serve the needs of the Harveston community. The proposed Service Commercial land uses west of Ynez Road, adjacent to Interstate 15 where similar commemial and retail uses currently exist along the Interstate corridor. The Specific Plan took under consideration the existing developments and surrounding zoning classifications to ensure development that will be complementary and compatible with the surrounding neighborhood. Section 4. Approval of Harveston Specific Plan. The City Council of the City of Temecula hereby approves mixed use specific plan known as the Harveston Specific Plan (SP No. 13), on property located east of Interstate 15, north of Santa Gertrudis Creek, west of Margarita Road and south of the northern City, and known as Assessor Parcel Nos. 910-261-001,910-261 - 002, 910-110-018, 910-110-015, 910-110-020, 910-110-021,910-110-027, 910-110-076, 910-100- 007, 910-100-008, 910-060-009.910-120-008, 911-630-001,911-630-002, 911-630-003, 911-640- 001,911-640-002, 911-180-002, 911-180-003, 911-180-004, 911-180-008, 911-180-009, 911-180- 015, 911-180-023, and 911-180-028 as set forth in Exhibit B, the Harveston Specific Plan (SP13), and subject to those certain Conditions of Approval set forth in Exhibit C. Exhibit B is on file in the Official Records of the City Clerk and is expressly incorporated herein by this reference as though set forth in full. Exhibit C is attached hereto and incorporated herein as though set forth in full. Section 5. Future Sales Tax Revenues. The City Council of the City of Temecula further commits, that an amount equal to one-half of the sales tax revenues received from Planning Area 12, will be committed to the future improvements associated with the Interchange of Interstate 15 and Date/Cherry Streets. Section 6. Future Traffic Studies. The City Council of the City of Temecula further directs staff to forward copies of all future traffic studies associated with the Harveston Specific Plan to the City of Murrieta. Section 7. The City Clerk shall certify to the adoption of this Resolution. R:/Resos 2001/Resos 01-72 3 PASSED, APPROVED AND ADOPTED by the City Council of the City of Temecula this 14th day of August, 2001. ATTEST: [SEAL] ,.~ -J-e~f'Cb'~erchero, Mayor STATE OF CALIFORNIA ) COUNTYOF RIVERSIDE ) ss CITY OF TEMECULA ) I, Susan W. Jones, CMC, City Clerk of the City of Temecula, do hereby certify that Resolution No. 01-72 was duly and regularly adopted by the City Council of the City of Temecula at a regular meeting thereof held on the 14th day of August, 2001, by the following vote: AYES: 3 COUNCILMEMBERS: Roberts, Stone, Comerchero NOES: 1 COUNCILMEMBERS: Naggar ABSENT: 0 COUNClLMEMBERS: None ABSTAIN: I COUNCILMEMBERS: Pratt Susan .Jon ,CMC R:/Resos 2001/Resos 01-72 4 EXHIBIT A GENERAL PLAN CONSlSTANCY ANALYSIS R:\S P~Harveston SP~City Council\SP Reso. DOC 4 GENERAL PLAN CONSISTENCY GENERAL PLAN CONSISTENCY The Specific Plan is consistent with the General Plan and serves to implement all aspects of the General Plan relevant to the designated area. A Specific Plan is a plan adopted either by ordinance or resolution for a particular area of land. A Specific Plan may contain its own development standards (zoning), and thus provides greater flexibility in the distribution of the land uses. The Harveston Specific Plan is intended to be supportive of, and consistent with, the goals and policies of the Temecula General Plan. It has been written to implement the Specific Plan designation assigned to Harveston Specific Plan area by the General Plan, updated on November 9, 1993. The purpose of this section is to ensure that the Specific Plan is consistent with the goals and policies of the City of Temecula's General Plan as required per Government Code Section 65454. The following are the ten elements included within the Temecula General Plan: 1. Land Use Element 2. Circulation Element 3. Housing Element 4. Open Space/Conservation Element 5. Growth ManagemenffPublic Facilities Element 6. Public Safety Element 7. Noise Element 8. Ah' Quality Element 9. Community Design Element 10. Economic Element The goals and policies for each General Plan element have been evaluated in the following pages. Following each goal of the General Plan elements, specific policies are laid out. Following each goal and policy, a statement is made in italics, indicating how the Specific Plan is consistent with that goal and/or policy. In some cases, it is indicated that the specific goal or policy is not applicable to the Specific Plan. The following sections list the applicable goals and policies of the above elements of the General Plan. FEBRUARY 2001 LAND USE ELEMENT USE ELEMENT Goal 1: A complete and integrated mix of residential, commercial, industrial, recreational, public and open space land uses. Discussion: The proposed Harveston Specific Plan has been prepared in conformance with the City of Temecula General Plan and is consistent with the City of Temecula's zoning code and General plan densities and intensities. The Specific Plan Project seeks to create a community character and quality that compliments the surrounding area. The proposed plan contains a variety of housing products and designs, which would cater to different groups of home buyers/renters in the City of TemecuIa. Additionally, development of the service commercial component of the Specific Plan will provide opportunities for the region and Har~eston area. The Plan also includes a generous amount of open space and recreational opportunities ( 5 70 acres), and more than adequate public facilities and setwices. Policies 1.1 1.2 Review all proposed development plans for consistency with the community goals, policies and implementation programs of this General Plan. The proposed Harveston Specific Plan has been prepared in conformance with the City of Temecula General Plan and is consistent with community goals, policies, and implementation programs outlined in the General Plan. Promote the use of innovative site planning techniques that contribute towards the development of a variety of residential product styles and designs including housing suitable to the community's labor force. The proposed plan contains a variety of housing products and innovative site planning designs (see Section 3.0. Land Use Plan and Section 10.0, Design Guidelines), which would cater to different groups of home buyers/renters in the City of Temecula. 1.3 Require the development of unified or clustered community-level and neighborhood-level commercial centers and discourage development of strip commercial uses. The Harveston Specific Plan proposes a Mixed Use Village Center, which would include uses such as retail, restaurant, office, daycare, worship, and a private club facility and fimess center. Additional commercial uses are located in the Service Commercial area of the Specific Plan. The Specific Plan does not encourage development of strip commercial uses. 1.4 Consider the impacts on surrounding land uses and infrastructure when reviewing proposals for new development. The proposed plan is consistent with the City of Temecula general plan densities and intensities and seeks to create a community character and quality that reflects the surrounding area. The Harveston EIR provides an analysis of the project's impacts on surrounding land uses and infrastructure. Infrastructure is consistent with the General Plan requirements and will be installed concurrently with development. FEBRUARY 2001 2 LAND USE ELEMENT 1.5 1.6 1.7 1.8 1.9 1.10 Support the development of light industrial, manufacturing, research and development, and office uses to diversify Temecula's economic base. The Harveston Specific Plan proposes a ll2.4-acre service commercial area that includes a mixture of uses that could serve or expand upon the adjacent business park development. This service commercial component of the Specific Plan will provide employment opportunities and needs for the region and Harveston area. Provide well-defined zoning and development standards and procedures to guide private sector planning and development. The Harveston Specific Plan creates development standards consistent with the philosophy of the City of Temecula Development Code. Detailed development standards for the Specific Plan have been prepared (see Section ILO, Development Standards) to manage implementation of general or unique conditions in each Planning Area. Require the preparation of specific plans as designated on the Specific Plan Overlay to achieve the comprehensive planning and phasing of development and infrastructure. The Harveston Specific Plan has been prepared in order to achieve comprehensive planning and phasing of development and infrastructure. Consider talcing the lead on preparing specific plans for areas designated on the Land Use Plan that have multiple landowners. This policy is not applicable, because it is a City directed policy. However, the subject site is designated Specific Plan on the General Plan Land Use Map. Encourage flexible zoning techniques in appropriate locations to preserve natural features, achieve innovation site design, achieve a range of txansition of densities, provide open space and recreation facilities, and to provide necessary amenities and facilities. The Harveston Specific Plan includes components that achieve many innovative site designs and a range of densities within the proposed residential development and the mixed use Village Center. The plan also provides for a variety of open space and recreation facilities including a Lake, a Lake Park, Paseo Park, Arroyo Park, and three mini park, a comprehensive trail system and bike paths. Pursue opportunities to locate higher density housing with supporting commercial and public uses on the west side of 1-15. This policy (locating higher density housing with supporting commercial and public uses on the west side of 1-15) is not the responsibility of the Harveston development. This development is located on the east side of l-I5. Although the Specific Plan area is located east of 1.15 it does include higher density housing and supporting commercial and public uses. FEBRUARY 2001 3 LAND USE ELEMENT Goal 2: A City of diversified development character where rural and historical areas are protected and co-exist with newer urban development. Discussion: The Harveston Specific Plan has been designed with sensitivity to its surrounding uses and seeks to conform to the overall character of the area. However, Harveston Specific Plan area is not located within a historical or rural area of the City. Policies 2.1 Provide physical and visual buffer areas to create a transition between rural residential and agricultural areas and commercial, industrial and other higher density residential development. The proposed plan includes extensive uses of paseos and landscaping setbacks/buffers to create physical and visual buffers to create appropriate transitions within the different types of development. 2.2 Apply rural development standards to specified areas of the City to maintain the rural character of those arcas. The policy is not applicable because the rural development standards do not apply to this project. The proposed project is in an area adjacent to existing development and the 1-15 Freeway and has been designated for mixed use development by the City's General Plan. 2.3 Define the rural and historical areas of the community to be conserved, and establish a procedure for adding areas or altering boundaries as necessary. This policy is not applicable to the Harveston project. It is the responsibility of the City of Temecula to define the rural and historical areas of the community to be conserved and establishing a procedure for adding or altering the boundaries if necessary. The City has already defined rural areas within the community and assigned L (.5-2 dwelling units per acre), VL (.2-.4 dwelling units per acre) and HR (0-. 1 dwelling units per acre)residential designation on the General Plan Land Use Map. In addition, the City has adopted the Old Town Specific Plan which has defined a histoHcal area of the community to be conserved. 2.4 Require the use of landscaped, open space buffers along roadways in-lieu of residential subdivision walls where feasible in light of noise and other constraints. The Harveston Specific Plan Design Guidelines (Section 10.0) has incorporated the use of landscape and open space buffers along the roadways in-lieu of residential subdivision walls where feasible in light of noise and other constraints. Figure 10.4 (Community Fencing and Walls Plan) presents a variety of wall and fence types within Harveston to meet the intent of this General Plan Policy. The project perimeter walls are required for noise mitigation; however, they will be planted with vines to create a green wall. The interior of the project will allow a variety of walls, fences and landscaping that will be well landscaped. FEBRUARY 2001 4 .~:~200~NIOOMt'CON$1~2tC~90E LAND USE ELEMENT Goal 3: A land use pattern that will protect and enhance residential neighborhoods. Discussion: The design of the Harveston Specific Plan is sensitive to and compatible with the surrounding uses and takes into account existing conditions and natural features. While the plan seeks to create a distinguishable character for the Harveston Specific Plan area, it will be compatible with and will enhance the adjacent uses. Po~ci~ 3.1 Consider the compatibility of proposed projects on surrounding uses in terms of the size and configuration of buildings, use of materials and landscaping, preservation of existing vegetation and landform, the location of access routes, noise impacts, traffic impacts, and other environmental conditions. The design of the Harveston Specific Plan is sensitive to and compatible with the surrounding uses and takes into account existing conditions in terms of the size and configuration of buildings, use of materials and landscaping, the location of access routes, noise impacts, traffic impacts and other environmental conditions. Specific Plan Land Use designations are consistent with the General Plan Land Use designations. The General Plan designations were reviewed for consistency and compatibility with adjacent development. The Specific Plan land uses have been developed to be complimentary to and compatible with the surrounding uses. Residential designations have been appropriately located next to those of like intensity. The Community Park has been situated to provide a buffer to the existing light industrial uses. The Service Commercial area has been located adjacent to 1-15 and west of Ynez Road. In addition, Design Guidelines and Development Standards within the Specific Plan assure the appropriate use of color, materials, architectural styles, landscaping, etc., to ensure compatibility with surrounding uses. 3.2 Provide infill development incentives in the residential sections of the Old Town area through the Old Town Specific Plan. The policy is not applicable because this is a City directed policy and the proposed project is not located in Old Town. 3.3 Require parcels developed for commercial or industrial uses to incorporate buffers that minimize the impacts of noise, light, visibility of activity and vehicular traffic on surrounding residential uses, Location of the service commercial uses with their l'ack of direct roadway access to the residential uses and special features such as landscape buffers, incorporated into the design of the service commercial, will minimize the impacts on surrounding residential uses. 3.4 Protect single-family residential areas fi.om encroachment by commercial uses. The Harveston Specific Plan proposes a service commercial area (adjacent to the existing business park) away from existing residential and the proposed residential planning areas. Landscape buffers will provide separation between the Service Commercial and residential uses. FEBRUARY 2001 5 LAND USE ELEMENT 3.5 3.6 3.7 Additionally, the Specific Plan area consists of distinct planning areas with specific development standards that will prevent any encroachment by the commercial uses into residential areas. Obtain aviation easement as required by the Comprehensive Land Use Plan for the French Valley Airport to ensure that landowners acknowledge the impacts associated with aircraft. This policy is not applicable because the Harveston Specific Plan area is not within the Comprehensive Land Use Plan for the French Valley Airport, and therefore, no aviation easement is required for the project. Require proposed development to evaluate the incremental traffic impacts on local roads throughout the proposed project phasing in order to ensure that any adverse impacts to local roads in residential areas are avoided or adequately mitigated. A Traffic Analysis for this project was prepared by Wilbur Smith Associates (dated July 19, 2000) and reviewed and approved by the City's Traffic Engineer. According to the Analysis, impacts from the project at opening year (2002) and at project buildout (2005) result in a minimum Level of Service D at all critical intersections within the vicinity of the project provided that certain transportation improvements are made by the project. These improvements have been identified and included as mitigation measures within the project's Environmental Impact Report. The project has already paid approximately 2.5 million and 1.8 million into Assessment Districts 156 and 161 (respectively), which contributed to improvements on Ynez, Winchester and Margarita Roads. In addition, the project will pay its fair share of Development Impact Fees (DIF); implement all recommendations contained within the Traffic Analysis for traffic improvements; as well as support the City's efforts to design and secure jurisdictional approval for the construction of a new interchange at 1-15 at Cherry and/or Date Street. Require proposed development to evaluate the incremental traffic impacts on local roads throughout the proposed project phasing in order to ensure that any adverse impacts to local roads in residential areas are avoided or adequately mitigated. Please see consistency analysis for Policy 3.6, above. Goal 4: A development Study Area. patterns that preserve and enhance the environmental resources of the Discussion: The Harveston Specific Plan has taken into consideration the natural and man-made opportunities and constraints in determining its land use designations and their intensities. Except for the preservation and enhancement of the Arroyo Park in its natural state, there are no other natural features/hazards that would affect the land use designation within the project site. FEBRUARY 2001 6 LAND USE ELEMENT Policies 4.1 Enforce hillside grading standards to naturalize the effects of grading, require the preservation of unique natural featttres and to encourage a broad range of hillside architectural and site planning solutions. 4.2 The project site will be mass graded and will result in a balance of cut and fill materials on the site. The project will be graded in a manner which is similar to the other specific plans in the City of Temecula (Paloma del Sol, Margarita Village, Roripaugh Estates, Campas Verde& Rancho Highlands) and surrounding Riverside County (Warm Springs, Vail Ranch, Red Hawk). The grading will result in modifications to the natural terrain. This type of grading is necessary to achieve the General Plan~Specific Plan land use designations for the site. Hillside grading standards are more appropriately applied in the areas designated L (.5-2 dwelling units per acre) , VL (.2-.4 dwelling units per acre) and HR (0-.1 dwelling units per acre) on the General Plan l_zznd Use Map. Consider the constraints of natural and man-made hazards in determining the location, type and intensities of new development. The Harveston Specific Plan takes into consideration the natural and man-made realities and constraints in determining its land use designations and their intensities. Except for preservation of the Arroyo Park in its natural state, there are no other natural features/hazards that would affect the land use designation within the project site. Man-made hazards such as existing and future roadways have been also considered. Additionally, the proposed project incorporates contour grading techniques in grading the site in order to maintain the integrity of the natural setting. 4.3 Cooperate with other agencies to develop Multi-species Habitat Conservation Plans in western Riverside and northern San Diego Counties. This policy is not applicable, because it is a City directed policy, and it is the responsibility of the City of Temecul~ 4.4 Work with the utility districts to develop a trail system and enhance the natural resources along the San Diego Aqueduct, creeks, and other utility easements where feasible. 4.5 The proposed Specific Plan area is not in the vicinity of the above aqueduct, however, the Specific Plan provides a comprehensive trail system with connection point to the off-site trails along Santa Gertrudis Creek. The project also proposes enhancement and preservation of a 13.8-acre Arroyo Park consistent with U.S. Army Corps and Fish and Game guidelines. The Arroyo Park includes a nature trail system. Work with the Riverside County Flood Control District and other responsible agencies on the design of the flood control project for Murrieta Creek, Temecula Creek, Pechanga Creek, and other waterways in the City. The Specific Plan preparation has included contact with the Riverside County Flood Control and other responsible agencies on the issue of waterways and flood control in the City of Temecula. FEBRUARY 2001 7 LAND USE ELEMENT 4.6 4.7 Consider alternative flood contxol methods to reduce capital and maintenance costs and provide recreational and open space opportunities. Section 5.0, Infrastructure Plan, of the Specific Plan includes the proposed drainage plan, which incorporates existing drainage courses into recreational open space areas (i.e., IO.5-acre Arroyo Park and 2.5-acre Paseo Park). Conserve the resources of Pechanga, Temecula and Murrieta Creeks through appropriate densities of development, setbacks, landscaping, and site design of surrounding projects. This policy is not applicable, because it is a City directed policy. The project is however consistent with the General Plan density designations for the property. Goal 5: A land use pattern and intensity of development that encourages alternative modes of transportation, including transit, bicycling, and walking. Discussion: The Harveston Specific Plan includes a transit plan, which provides for alternative mode of transportation. The transit plan has been developed with input provided from the Riverside Transit Authority (RTA ) and incorporates the service needs of the RTA. The Village Center, High- density residential (13-20 dwelling units/acre) and the M2 (Medium-density residential 7-13 dwelling units/acre) are located at the "core" of the project to provide the critical density needed to support public transit. Bus turnouts and shelters are included, as required by the RTA and approved by the Department of Public Works. Additionally, the Harveston Specific Plan includes a comprehensive paseo and trail system providing the project's residents the opportunity' to walk, jog, or bike around the entire community. Bike trails and transit facilities will also be provided along the project roadways. The Specific Plan includes a Mixed Use Village Center, which consists of a mixture of compatible uses such as retail, restaurant, office, daycare, worship, and a private club facility and fitness center. The Mixed Use Village Center creates an environment where walking is encouraged. For ease of access this "core area" is connected to various residential areas within the development via walking and biking trails. Policies 5.1 Include in the Development Code and through other ordinances a package of incentives to encourage development to include: 2. 3. 4. 5. 6. 7. 8. Additional active parkland Development of parkland and trails Preservation of historic buildings or sites Additional open space Preservation and enhancement of natural habitat Additional public or community facilities Additional or improved public spaces or plazas for community use Additional amenities in multifamily developments FEBRUARY 2001 8 ~:eoo~s~oz~rco~stsr~cr.~oc ~ LAND USE ELEMENT 10. 11. Transit facilities and/or additional right-of-way along future transit corridors Housing that meets the needs of very low and low income households. Provision of cultural facilities. The Harveston Specific Plan has included many of these items. This is further discussed below. Additional Active Parkland. The project provides 57.4 acres of parkland/recreation facilities (including the Winchester Creek Park). This figure does not include the 15.9 acres within the LDZ's, which brings the total to 73.3 acres. Development of Parkland and Trails. The parkland acreage is discussed above. The Open Space and Recreation Plan (Figure 6.1 of the Specific Plan) and Bicycle Plan (Figure 4.8 of the Specific Plan) depict the open space/recreational opportunities within the Plan, as well as comprehensive walking and bicycle network within the project. A ten foot (10') wide trail easement along the western perimeter of the project. In addition to providing opportunities within the project, these networks also tie into the existing City wide bicycle plan. Further, it is anticipated that these systems will ultimately become a component of the City's Trails Master Plan (currently under development). Preservation of Historic Buildings or Sites. There are no known historic buildings or sites at the project location~ Additional Open Space. As discussed above, the project is providing 57.4 acres of recreation facilities. Based upon the requirements of the City of Temecula Community Services Department, 26. 75 acres or parkland is required. The project exceeds this amount by 30. 65 Preservation and Enhancement of Natural Habitat. As part of the Environmental Impact Report, a biological assessment was prepared for the project site. No sensitive or endangered species were identified on-site. The project will impact 2.86 acres of "waters of the United States." As mitigation for this impact, the creation of 8 acres of a riparian corridor must be created on-site. The Arroyo Park has been developed to serve as this mitigation and will encompass 13.8 acres. This is greater than what was required by the United States Army Corps of Engineers for mitigatior~ In attrlition, should the Cherry Street interchange be approved for this project, this acreage may be subject to an increase. Additional Public or Community Facilities. Public and Community facilities are included within many of the recreation facilities within the project. It is anticipated that people residing within the project and those within the vicinity of the project will use those facilities. These include the elementary school, the Lake, Lake Park, Paseo Park, Village Green as well as the Community Parle In addition, private facilities will be provided to serve the Harveston residents. Additional or lmproved Public Spaces or Plazas for Community Use. These have been listed above. In addition, public and quasi-public spaces will be provided within the Village Center. Also, mini-parks are included within most of the residential neighborhoods. FEBRUARY 2001 9 r:~oo~w~oza~co~s~sr~cr, voc LAND USE ELEMENT 5.2 5.3 5.4 Additional Amenities in Multifamily Developments. It is anticipated that the multifamily component of the project will contain amenities, which are typically found within these types of development. The multi-family development is centrally located adjacent to the Village Center and within immediate proximity of the project's recreation facilities. Transit Facilities and/or additional right-of-way Along Future Transit Corridors. The transit plan has been developed with in'ut provided from the Riverside Transit Agency (RTA). Potential Transit Routes & Stops have been developed for current and future transit needs, with input from RTA. A transit station is planned within the Village Center and will be integrated into the design of the streetscape. The transit station will be installed when adjacent development occurs, in accordance with the requirements of the RTA. It is anticipated that the buses will initially make a small loop through the project, entering the site from Margarita Road, passing by the Elementary School, lake and Lake Park, Village Green and Village Center and exiting the site via Margarita Road. Future transit stops will be provided within the project, along the Loop Road. Transit stops are also proposed on the perimeter of the project, along Date Street, Ynez Road and Margarita Road. In addition, transit stops will be provided in key locations within the Service Commercial portion of the project. All of the transit stops are anticipated to connect to the current and future major transit hubs within the area, including the Promenade Mall. Housing That Meets the Needs of Very Low and Low Income Households. The project includes a variety of housing types, which will provide a wide array of housing opportunities for both owners and renters. It is not anticipated that Harveston will provide housing that meets the needs of very low and low income households. Provision of Cultural Facilities. These are discussed above in the recreation facilities. Require the provision of pedestrian and bicycle linkages from residential areas to open space/recreation facilities, commercial and employment centers. The Harveston Specific Plan includes a comprehensive paseo and trail system providing the project's residents the opportunity to walk, jog, or bike around the entire community. Bike trails and transit facilities will also be provided along the project roadways. (See Figures 4.8, Bicycle Plan and 11.5, Mixed Use Vehicular Circulation and Parking). Encourage variety in the design of sidewalks and trails with respect to alignment and surface materials to provide a convenient and enjoyable experience for the users. The sidewalks and paseos included in the proposed plan incorporate unique design features, landscaping, and amenities offering users a variety of different recreational experiences. Many of the proposed paseos will meander through the adjacent landscape. Provide grade separated bike paths along major arterials where feasible. Ensure that non-grade separated bike paths are designated for safety. The proposed Specific Plan includes Class I1 bike lane along Margarita Road, consistent with the City of Temecula General Plan (see Figure 10.1-4, Margarita Road). FEBRUARY 2001 10 LAND USE ELEMENT 5.5 5.6 5.7 5.8 5.9 5.10 Designate Mixed Use Village Centers on the Land Use Plan to provide areas within the community that are urban in character, contain a mixture of compatible uses, and are designed to reduce or eliminate the need for the automobile in traveling to or within Mixed Use Village Centers. The Specific Plan includes a Mixed Use Village Center, which consists of a mixture of compatible uses such as retail, restaurant, office, daycare, worship, and a private club facility and fitness center. The Mixed Use Village Center creates an environment where walking is encouraged. For ease of access this "core area" is connected to various residential areas within the development via walking and biking trails. Encourage higher density residential, mixed use development, and supporting public and community facilities within Mixed Use Village Centers. The Mixed Use Village Center proposed within the proposed Harveston plan includes mixed use development, public and community facilities, and higher density residential uses. Establish design guidelines, development standards, and incentive programs for uses within Mixed Use Village Centers. The proposed plan establishes guidelines, development standards, and incentive programs for Mixed Use Village Center uses. (See Section 11.4. 7' Mixed Use Overlay Zone). Develop a plan to link Mixed Use Village Centers by trails and potential transit systems including bus, shuttle and light rail. The Harveston Specific Plan includes extensive system of paseos and potential transit facilities that link the Mixed Use Village Center to the remainder of the community. (See Figure !1.15, Mixed Use Vehicular Circulation and Parking). Ensure that architecture, landscape design, and site planning within Mixed Use Village Centers emphasizes a pedestrian scale and safe and convenient access between uses. The Mixed Use Village Center is pedestrian oriented and facilitates access between uses within the Village. Walking and biking trails are provided to connect the Mixed Use Village Center to other areas within the Specific Plan. (See Figure 11.16, Mixed Use Village Center Pedestrian Circulation). Ensure that adequate public gathering areas or plazas are incorporated within Mixed Use Village Centers to allow for social interaction and community activities. The Mixed Use Village Center proposed within the Harveston Specific Plan allows for gathering areas and plazas. Additionally, the Village Green creates a public gathering place, which will encourage social interaction and community activities, such as concerts or farmers markets. 5.11 Discourage the development of strip commercial centers that increase automobile dependency. FEBRUARY 2001 11 p:,~o~o~sj~z,a~cot~stsr~cr, voc LAND USE ELEMENT The Harveston Specific Plan does not propose the development of strip commercial uses within the Specific Plan area. Its objective is to create a pedestrian friendly environment where the use of the car is not encouraged. Goal 6: A plan for Old Town Temecula that enhances economic viability, preserves historic structures, addresses parking and public improvement needs, and establishes design standards to enhance and mainLqin the character and economic viability of Old Town. This goal is not applicable because the Specific Plan is not located within the Old Town area of the City of Temecnia. This goal is not applicable because it is a City directed goal. Goal 7: Orderly annexation and development of unincorporated area within Temecula's Sphere of Influence. This goal is not applicable because the Har~eston Specific Plan is not located within the unincorporated areas of Temecula' s Sphere of lnfluence. Goal 8: A City that is compatible and coordinated with regional land use patterns. Discussion: The Specific Plan land uses have been laid out consistent with the City of Temecula General Plan, which takes into account larger regional goals and policies. Additionally, the Specific Plan was coordinated with the U.S. Army Corps of Engineers and the State Department of Fish and Game, which take a more regional and comprehensive approactr Policies 8.1 Provide a patlem of land uses that maintain and enhance the viability of neighboring communities including the City of Murrieta, and the counties of Riverside and San Diego, through compatible uses and linkages. The compatibility between the Harveston project and the adjacent developments has been discussed in Policy 3.1. The architectural styles, design guidelines and development standards will create a development that will maintain and enhance the viability of neighboring communities including the City of Murrieta and the Counties of Riverside and San Diego. Compatible uses and linkages have been provided throughout the project. 8.2 Provide a system of open space that is coordinated with regional open space uses to comprehensively address the management and conservation of resources. The Arroyo Park open space proposed within the Harveston Specific Plan was coordinated with the United States Army Corps of Engineers and the California Department offish and Game as FEBRUARY 2001 12 LAND USE ELEMENT 8.3 8.4 a mitigation measure to address the management and conservation of resources. The Harveston Open Space and Recreation Plan (Figure 6.1) provides a system of open space that is coordinated with the City-wide and regional system. The project will tie into the Santa Gertrudis Trail System, as well as provide a 10' wide easement along the western project boundary for regional trial systems. Participate with the Airport Land use Commission in the planning process in the preparation of the Comprehensive Land use Plan for the French Valley Airport, to the extent feasible. The policy is not applicable because the Harveston Specific Plan is not within the Comprehensive Land Use Plan for the French Valley Airport. Continue to participate with the Western Riverside Council of Governments in the preparation of plans and programs addressing regional issues, including the Growth Management Strategy, Comprehensive Transportation Plan, Water Resources Stxategy, and School Facilities Plan. This Policy is the responsibility of the City of Temecula and not that of the Harveston project. The project will be reviewed for consistency with the City of Temecula Growth Management Program Action Plan. In addition, transportation items have been a&tressed above (see Policy 3.3). Water resources and project impacts have been discussed and mitigated as necessary in the project's Environmental Impact Report. An elementary school site is currently under construction on the project site and su~cient resources are available to accommodate the middle and high school students generated by the project. FEBRUARY 2001 13 ~:eooo~m~z~coss~sr~cz~oc CIRCULATION ELEMENT CIRCULATION ELEMENT Goal 1: Strive to maintain a Level of Service 'CD" or better at all intersections within the City during peak hours and Level of Service "C" or better during non-peak hours. Discussion: A Traffic Analysis for this project was prepared by Wilbur Smith Associates (dated July 19, 2000) and reviewed and approved by the City's Traffic Engineer. According to the Analysis, impacts from the project at opening year (2002) and at project buildout (2005) result in a minimum Level of Service D at all critical intersections within the vicinity of the project provided that certain transportation improvements are made by the project. Ten intersections have been identifed as needing improvements (2005 with 2 of the 10 requiring improvements at year 2002). These improvements are located at the following intersections: · Winchester & Ynez Roads; · Winchester Road & 1-15; Winchester Road & Jefferson Avenue; · Winchester & Margarita Road; · Overland Drive & Margarita Road; · Overland Drive & Ynez Road; · Overland Drive & Jefferson Avenue; · Murrieta Hot Springs & Margarita Roads; · Murr~eta Hot Springs & Alta Murrieta Roads; · Murrieta Hot Springs & Jefferson Avenue. Overall project impacts (percentage) to these intersections have been identified in the EIR. Mitigation measures have been included within the project's Environmental Impact Report to ensure that this Goal is met. Policies 1.1 Establish street standards and all new roadway facilities shall be constructed or upgraded to meet City standards where feasible. The proposed Specific Plan includes a Circulation Plan and standards, which will dictate construction and upgrade of the roadway facilities consistent with City standards. All roadway and intersection designs will comply with City standards providing safe and efficient traffic patterns and circulation. 1.2 Require an evaluation of potential t~affic impacts associated with new development prior to project approval, and requixe adequate mitigation measures prior to, or concurrent with, project development. 1.3 Please see consistency analysis for Goal 1, above. Use the Circulation Element Roadway Plan to guide detailed planning and implementation of the City's roadway system. FEBRUARY 2001 14 CIRCULATION ELEMENT ' 1.4 1.5 The Circulation Plan within the Harveston Specific Plan has been produced based on the City's Circulation standards. Pursue trip reduction and ~xansportation systems management measures to redtice and limit congestion at intersections and along streets within the City. Please see consistency analysis for Goal 1, above. Trip reduction measures include: Transit provisions · Location of housing near employment areas · An extensive bicycle path network · An extensive walking/pedestrian network. Transportation System Management measures include (General Plan): · Adding turn lanes or restricting turning movements during peak traffic periods at congested intersection,* · Widening of intersection approaches to accommodate additional through movement lanes or to improve visibility · Installation of bus turnout bays · Pavement marking modifications/improvements · Completion of "missing links" in the roadway network Update every three years, or as needed, "build-out" traffic forecasts to monitor the impact of development approvals and the adequacy of the Circulation Element Roadway Plan. The policy is not applicable because it is a City directed policy. Goal 2: Enhance traffic safety on City streets. Discussion: The Circulation Plan within the Harveston Specific Plan minimizes traffic conflicts and promotes safe traffic circulation within the Specific Plan area. A Loop Road is included within the circulation plan for ease of access to different residential planning areas, reducing undesirable through traffic within the residential areas. The Circulation Plan encourages safety for all pedestrian traffic by separating vehicular and pedestrian traffic, especially in commercial and high-density areas. As such, the plan includes a safe and efficient paseo, urban trail and sidewalk network, providing pedestrian and bicycle circulation in conjunction with the roadway network. Policies 2.1 The City shall enforce speed restrictions throughout the City. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 15 r:~:ooo~z~coNstrr~vcr, ooc CIRCULATION ELEMENT 2.2 2.3 2.4 2.5 Require that future roads and improvements to existing roads be designed to minimize traffic conflicts such as those which result from curb parking maneuvers and uncontrolled access along heavily traveled roadways. The Circulation Plan within the Harveston Specific Plan minimizes traffic conflicts and promotes safe traffic circulation within the Specific Plan area. A Loop Road is included within the circulation plan for ease of access to different residential planning areas, reducing undesirable through traffic within the residential areas. Require that the development of new private driveways do not introduce significant traffic conflicts along major streets and primary residential collectors roads. The Harveswn Specific Plan does not propose new private driveways off of the major streets or primary residential collector roads. Three project entries are proposed off the major streets (2 on Margarita Road and I on Date Street). Internal to the project, neighborhoods will access the' Loop Road. All driveway locations are subject to review and approval of the Director of Public Works. Require that vehicular and pedesffian traffic be separated to the maximum extent feasible. The Circulation Plan within the Harveston Specific Plan encourages safety for all pedestrian traffic by separating vehicular and pedestrian traffic, especially in commercial and high density areas. As such, the plan includes a safe and efficient paseo, urban trail and sidewalk network, providing pedestrian and bicycle circulation in conjunction with the roadway network. Establish an ongoing maintenance.program to ensure the safety of the City's roadway system. This policy is not applicable because it is a City directed policy. Goal 3: A regional transportation system that accommodates the safe and efficient movement of people and goods to and from the community. Discussion: The Harveston Specific Plan includes City-wide and regional circulation roadways. The Specific Plan currently includes roadway segments, which are consistent with the City's General Plan Circulation Element (Margarita Road, Date Street, Ynez Road). In addition, a City directed alternative has been included in the Plan. With the inclusion of the project's roadway network, transit provisions, bicycle and pedestrian pathways, the project will contribute to this goal of accommodating the safe and efficient movement of people and goods to and from the community. Poficies 3.1 Support the completion of the Riverside County Master Plan of Arterial Highways. The Circulation Plan within the Harveston Specific Plan includes roadway extensions and future improvements consistent with the City's existing Circulation Element Plan. FEBRUARY 2001 16 r:eoo~s~oo~cosstsrwcr~oc CIRCULATION ELEMENT 3.2 3.3 3.4 3.5 3.6 3.7 Actively pursue the construction of a new interchange north of Winchester Road and other recommended system improvements'outside its jurisdiction in cooperation with Caltrans, the City of Murrieta, Riverside County, and local developers. Measures should be taken to preserve anticipated right-of-way needs and to identify funding mechanisms for the interchange improvements. The location of a new interchange north of Winchester Road is currently being reviewed through a Project Study Report (PSR) by Caltrans. It is anticipated that Caltrans will complete this review by mid-2OOJ and the location for this interchange will be determined. The project contains two alternatives for the location of this interchange. Subdivision maps are also being processed which will reserve ,~dditional right-of-way for the ultimate location for the interchange. It should be noted that the applicant will support the City's efforts to design and secure jurisdictional approval for the construction of a new interchange at 1-15 at Cherry and/or Date Street. Actively pursue the improvements to existing interchanges within the City and construction of new overpasses as required to achieve the adopted service level standards. Reference response to Policy 3.2. In addition, a mitigation measure in the project's EIR requires improvements to the 1-15/Winchester Road interchange. This mitigation would help achieve level of service standards required in Goal 3. Coordinate with the Riverside Transit Agency to provide fixed route transit service (bus or shuttle) along major txansportation corridors connecting to regional employment and commercial areas, ah-pons, health care facilities, and major recreation areas. The Harveston Specific Plan will comply with the City of Temecula and the Riverside Transit Agency to facilitate provision of transit service. Coordination and correspondence with the Riverside Transit Agency was completed as part of the Harveston EIR preparation. Provide for express transit service through implementation of park-and-fide facilities along regional transportation corridors. This policy is not applicable because it is a City directed policy, and park-and-fide facilities are not proposed with the Harveston project. Coordinate with Western Riverside Council of Governments to identify, protect, and pursue opportunities for a light rail transit along major transportation corridors which conneCt Temecula to other population centers. This policy is not applicable because it is a City directed policy, and it is the responsibility of the City of Temecula. Encourage the formation of a special Southwest County agency or task force which would be responsible for identifying and prioritizing seleCted system improvements having regional significance and the development of funding sources which would allow for the timely implementation of these improvements. FEBRUARY 2001 17 CIRCULATION ELEMENT This policy is not applicable because it is a City directed policy, and it is the responsibility of the City of Temecula. Goal 4: An efficient City circulation system through the use of transportation system management and travel demand management strategies. Discussion: This goal is not applicable because it is a City directed goal However, the Harveston EIR incorporates Travel Demand Management (TDM) requirements, as mitigation measures, consistent with the Air Quality Management Plan (AQMP). The proposed project will comply with the conditions and requirements set forth by the City of Temecula and will implement all traffic signals as required by the traffic study in order to maximize efficient flow of traffic. The Harveston Specific Plan includes a comprehensive pedestrian trail system and incorporates features such as bus turnouts and shelters, as required by the Director of Public Works and the Riverside Transit Agency (RTA). Policies 4.1 Establish a City-wide Circulation System Phasing and Financing Program for the orderly implementation of system improvements identified in the Circulation Element. This policy is not applicable because it is a City directed policy. 4.2 Require proper spacing and interconnect traffic signals where feasible to maximize the smooth progression of traffic flows and to minimize delay and stop and go conditions which result in higher vehicle emissions and noise levels. The proposed project will comply with the conditions and requirements set forth by the City of Temecula and will implement all traffic signals as required by the traffic study in order to ma.~imize efficient flow of traffic. 4.3 Discourage the provision of on-street (curbside) parking along principal arterial roadways to minimize traffic conflicts and increase the traffic carrying capacity of these roadways. The Specific Plan does not propose on-street parking along the principal arterial roadways (i.e., Date Street, Margarita Road, and Ynez Road). 4.4 Require new development to incorporate design features which facilitate transit service and encourage transit ridership such as bus pullout areas, covered bus stop facilities, efficient la'ail systems through projects to transit stops, and incorporation of pedestrian walkways that pass through subdivision boundary walls. The Harveston Specific Plan includes a comprehensive pedestrian trail ~ystem and incorporates features such as bus turnouts and shelters, as required by the Director of Public WorIcs and the Riverside Transit Agency (RTA). FEBRUARY 2001 18 CIRCULATION ELEMENT 4.5 4.6 4.7 4.8 4.9 4.10 4.11 Require specific plans and other mixed use projects to provide aa internal system of trails linking schools, shopping centers, transit, and other public facilities within residential areas. The Harveston Specific Plan includes an extensive internal system of trails/paseos that connect the Mixed Use Village Center to the school, the lake/lake park and community park, and different residential areas. Provide a comprehensive system of Class I and/or Class II bicycle lanes to meet the needs of cyclist traveling to and from work and other destinations within the City. Consistent with the City of Temecula General Plan, the Harveston Specific Plan provides Class H bicycle lanes along most roadways within the Specific Plan area for recreational as well as ease of access between different planning areas and uses. (See Figure 4.8, Bicycle Plan). Encomage a mix of uses within a project designed to maximize internal trip making, maximize the use of parking facilities, and to promote a shift from auto use to pedestrian and bicycle medes of travel. The proposed project is pedestrian oriented encouraging internal movement between the different uses and planning areas via trails and bike lanes. Encourage the provision of additional regional public transportation services. The Harveston Specific Plan will comply with the City of TemecuIa and the Riverside Transit Agency to facilitate provision of transit service. Coordination and correspondence with the Riverside Transit Agency was completed as part of the Harveston EIR preparation. Require transportation demand management plans to be submitted for preliminary review at the Specific Plan or Plot Plan stage of site development and subm/tted for final approval prior to the issuance of building permits, in accordance with the City's Transportation Demand Management Ordinance. The Harveston EIR incorporates Travel Demand Management (TDM) requirements, as mitigation measures, consistent with the Air Quality Management Plan (AQMP). Encourage the implementation of employer Travel Demand Management (TDM) requirements included in the Southern California Ah' Quality Management District's Regulation 15 of the Air Quality Management Plan. The Harveston EIR incorporates TDM requirements as mitigation measures consistent with the AQMP. The City shall establish a local Congestion Management Plan and monitor the performance and effectiveness of travel demand management progxams within the City. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 19 CIRCULATION ELEMENT Goal 5: An adequate supply of private and public parking to meet the needs of residents and visitors of the City. Discussion: The proposed Specific Plan contains parking requirements and standards (see Section ILO, Development Standards) to provide adequate parking facilities on-site. A tapered street secffon will be used at internal neighborhood intersections and in locations where on-street parking is otherwise adequately provided. Adequate on-street parking has been defined in Section 11 of the Specific Plan. The Mixed Use Village Center provides the opportunity for "shared joint use parking' which helps minimize the number of ingress and egress points. Policies 5.1 Enforce City parking ordinances and standard design requirements which apply. The Harveston Specific Plan is prepared based on the City's General Plan and other applicable ordinances (i.e., parking ordinances) and standard design requirements. Parking standards are contained in Section 1LO, Development Standards, of the Specific Plan. 5.2 Require the consolidation of parking, and related circulation facilities, where appropriate, to minimize the number of ingress and egress points onto arterials. 5.3 The Mixed Use Village Center provides the opportunity for "shared joint use parking" which helps minimize the number of ingress and egress points. Provide additional public parking in the Old Town area where feasible through common parking areas or establishment of a parking district. This policy is not applicable because the Harveston Specific Plan is not within the Old Town Specific Plan area. 5.4 5.5 Require project developers to provide adequate on-site parking and/or to contribute to a program to acquire and maintain off-site facilities. The proposed Specific Plan contains parking requirements and standards (see Section ILO, Development Standards) to provide adequate parking facilities on-site. Encourage underground parking or parking sU-uctures where economically feasible in commercial 5.6 The proposed Specific Plan contains parking requirements and standards (see Section 11.0, Development Standards) to provide adequate parking facilities on-site. Additional measures will be incorporated to meet the demand and requirement in commercial areas. Encourage joint development of parking facilities (e.g. joint-use of parking facilities) where feasible to maximize the efficient use of available parking. FEBRUARY 2001 20 p:~zo~o~N~oz~rcoNstrr~crvoc CIRCULATION ELEMENT The proposed Specific Plan contains parking requirements and standards (see Section 11.0, Development Standards) to provide adequate parking facilities on-site. Additional measures will be incorporated to maximize efficiency. Goal 6: Safe and efficient alternatives to motorize travel throughout the City. Discussion: The proposed project provides for a separate system of paseo/truils that will be utilized by pedestrians and non-motorized modes of transportation. This system provides for ease of access between the different planning areas. This system of trails will also connect to the regional trails for ease access to other areas within the City. PoHcies 6.1 6.2 Promote the safety of pedestrians and bicyclist by adhering to uniform trail standards and practices and communicating safety practices to the public. Unless modified through this Specific Plan, all trails shall be constructed to ultimate City standards and practices that will ensure public safety. Off-street bicycle and equestrian trails should minimize the number of locations where automobile cross traffic will be experienced. The proposed project provides for bicycle trails throughout the project site (see Figure 4.8, Bicycle Plan). The Specific Plan's loop road system will minimize the number of locations for automobile cross traffic. 6.3 Ensure accessibility of pedestrian facilities to the elderly and disabled. 6.4 The Harveston Specific Plan seeks to ensure accessibility of facilities to all users, including the elderly and the disabled. ADA standards will be complied with throughout the Specific Plan. Traffic signals along bike routes and where significant pedestrian activity is present shall be properly timed and periodically adjusted to allow for the safe movement of these non-motorized modes. 6.5 The proposed Specific Plan includes a Circulation Plan and standards, which will dictate construction and upgrade of the roadway facilities consistent with City standards. All roadway and intersection designs will comply with City standards providing safe and efficient traffic patterns and circulation. Adequate linkages shall be provided for non-motorized modes, between residential areas and commercial / employment activity centers, public institutions, and recreation areas. The proposed project provides for ease of access between the different planning areas by non- motorized modes of trunsportation. As such, the project includes designated trail systems for use by pedestrians and bicycles and other non-motorized modes of transportation. FEBRUARY 2001 21 CIRCULATION ELEMENT 6.6 Motorized vehicles and motorized cycles shall be prohibited from using the City's recreation trail system~ The Harveston Specific Plan provides for a separate system of paseos/trails that will be utilized by pedestrians and non-motorized cycles only. Motorized vehicles and motorized cycles will be prohibited from using the pedestrian designated paseos/trails within the Specific Plan. Goal 7: A truck circulation system that provides for the safe and efficient transport of commodities and also minimizes noise, air pollution and traffic impacts to the City. Discussion: The Circulation Plan for Harveston project is based on the City of Temecula Circulation Element and does not designate primary truck routes on roadways providing access to different residential areas within the project site. The proposed project provides for measures to facilitate access and loading by trucks in order to minimize any potential circulation conflicts. Policies 7.1 Designate prim. au truck routes on selected arterial streets to minimize the impacts of mack traffic on residential areas. The Harveston Specific Plan Circulation Plan is based on the City of Temecula Circulation Element and does not designate primary truck routes on roadways providing access to different residential areas within the project site. 7.2 Require loading areas and access ways for trucks that minimize or eliminate conflicts with automotive and pedestrian areas to maintain safe and efficient traffic circulation. The proposed project provides for measures (see Section 1LO, Development StandardS) to facilitate access and loading by trucks in order to minimize any potential circulation conflicts. FEBRUARY 2001 22 ~:~ooo~N~oo~rcoNstrr~vcr. z~oc HOUSING ELEMENT HOUSING ELEMENT Goal 1: A diversity of housing opportunities that satisfies the physical, social and economic needs of existing and future residents of Temecula. Discussion: The Specific Plan will provide 1,921 dwelling units on a wide range of lots to accommodate the existing and projected housing needs in the City. The residential development will provide a range of housing type options in terms of cost, density and type. The Harveston Specific Plan includes a wide variety of housing types within each density category and proposes a sustainable land use concept by incorporating the open space and recreational opportunities through a generous selection of park types. Policies 1.I 1.2 Provide an inventory of land at varying densities sufficient to accommodate the existing and projected housing needs in the City. The Harveston Specific Plan provides 1,921 dwelling units on individual lots ranging in size.from 2,000 to 5,000 square feet. The target density for the proposed project is 6.3 dwelling units per acre. The Harveston Specific Plan also includes 300 high-density residential dwelling units at a target density of 17.8 units per acre. In addition to the high density, three densities of Low Medium (578 dwelling units), Medium 1 (475 dwelling units), and Medium 2 (568 dwelling units), are included in the Specific Plan. The proposed housing types will provide a range of opportunity, which will satisfy the needs of various segments of the local housing market. Encourage residential development that provides a range of housing types options in terms of cost, density and type, and provides the opportunity for local residents to live and work in the same community by balancing jobs and housing types. The proposed project introduces a wide range of housing type in terms of cost, density and design in order to meet the needs of the different segments of the local population. The project also includes commercial uses, which would create jobs locally and regionally. 1.3 1.4 Require a mixture of diverse housing types and densities in new developments around the mixed use village centers to enhance their people-orientation and diversity. The Harveston Specific Plan proposes high density housing in the Mixed Use Village Center overlay along with other uses. Additionally, in close proximity to the Mixed Use Village Center are proposed a variety of housing types and densities. Support the use of innovative site planning and architectural design in residential development. The proposed project includes a wide variety of housing types within each density category. These varieties are achieved through innovative site planning and design and will cater to the needs of different groups of clients. FEBRUARY 2001 23 ~:vooo~m~o~,anroNs~sr~czooc HOUSING ELEMENT 1.5 1.6 Encourage the use of clustered development to preserve and enhance important environmental resources, and maintain important areas in open space. The Hameston Specific Plan proposes an efficient land use concept where different residential development types, including clustered development, are introduced and vast areas of open space are incorporated throughout the Specific Plan in the form ora community park, mini parks, paseo park, lake, lake park, arroyo park, and paseos. Promote the development of compatible mixed use projects that promotes and enhances the village concept, facilitates the efficient use of public facilities, and supports alternative ~xansit options. The Harveston Specific Plan is a project that incorporates different types of uses such as residential, service commercial, school, parks, and Mixed Use Village Center. Within the Mixed Use Village Center there is a wide range of uses which promote a pedestrian oriented concept (see Figure 11.16, Mixed Use Village Center Pedestrian Circulation). Paseos, trails, and bike lanes are provided for ease of access to recreational and other public facility uses (i.e., school, and church). Goal 2: Affordable housing for all economic segments of Temecula. Discussion: The Harveston Specific Plan is promoting a variety of housing opportunities that accommodate the needs of all economic levels of the population, and is providing opportunities to meet the City's fair share of low- and moderate-ineome housing. The project includes housing affordable to households with earnings in excess of approximately 120percent of the current median income of the County of Riverside. The higher density dwelling units will be more affordable to buyers as well as renters. Policies 2.1 Promote a variety of housing opportunities that accommodate the needs of all economic levels of the population, and provides opportunities to meet the City's fair share of Iow- and moderate- income housing. The Harveston Specific Plan provides 1,921 dwelling units on individual lots ranging in size from 2,000 to .5,000 square feer The target density for the proposed project is 6.3 dwelling units per acre. The Harveston Specific Plan also includes 300 high-density residential dwelling units at a target density of 17.8 units per acre. In ,~rMition to the high density, three densities of Low Medium (578 dwelling units), Medium 1 (475 dwelling units), and Medium 2 (568 dwelling units), are included in the Specific Plan. The proposed housing types will provide a range of opportunity, which will satisfy the needs of various economic levels of the local housing market. 2.2 Support innovative public, private and non-profit efforts in the development of affordable housing, particularly for special needs groups. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 24 HOUSING ELEMENT 2.3 2.4 Encourage the use of non-traditional housing models, including single-room occupancy structures (SRO) and manufactured housing, to meet the needs of special groups for affordable housing, temporary shelter md/or t~ansitional housing. This policy is not applicable because it is a City directed policy. Pursue all available forms of private, local, state and federal assistance to support development and implementation of the City's housing programs. The proposed Harveston project includes housing affordable to households with earnings in excess of approximately 120 percent of the current median income of the County of Riverside. The higher density dwelling units will be mare affordable to buyers as well as renters. Goal 3: Removal of governmental constraints in the maintenance, improvement and development of housing, where appropriate and legally possible. This goal is not applicable because it is a City directed goal Policies 3.1 Provide reasonable processing time and fees for new construction or rehabilitation of housing. This policy is not applicable because it is a City directed policy. 3.2 Consider mitigating development fees for projects providing affordable and senior citizen housing. This policy is not applicable because it is a City directed policy. 3.3 Periodically review City development standards to ensure consistency with the General Plan and to facilitate high-quality affordable housing. This policy is not applicable because it is a City directed policy. Goal 4: Conservation of the existing affordable housing stock. This goal is not applicable because it is a City directed goal. Policies 4.1 Monitor and regulate, if necessary, the number of affordable units eligible for conversion to market-rate units and develop programs to rrdnimize the loss of these units. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 25 HOUSING ELEMENT 4.2 4.3 Develop rehabilitation programs that are directed at preserving the integrity of the housing stock. This policy is not applicable because it is a City directed policy. Support the efforts of private and public entities in maintaining the affordability of units through implementation of energy conservation and weatherization programs. This policy is not applicable because it is a City directed policy. Goal 5: Equal housing opportunity for all residents in Temecula. Discussion: The Harveston Specific Plan promotes housing opportunities for all person.* regardless of race, religion, sex, marita! status, ancestry, national origin, age, physical handicap, or color. PoHci~ 5.1 5.2 Encourage and support the enforcement of laws and regulations prohibiting the discrimination in lending practices in the sale or rental of housing. The Harveston Specific Plan promotes housing opportunities for all persons regardless of race, religion, sex, marital status, ancestry, national origin, age, physical handicap, or color. Assure and support the efforts of others to ensure that unrestricted access to housing is available to all segments of the community. The proposed project supports and encourages unrestricted access to housing to all interested clients without discrimination. 5.3 Encourage housing design standards that promote the accessibility of housing for the elderly and disabled. The Specific Plan anticipates the use of certain residential product types by elderly and disabled, therefore, it incorporates the City's building codes and ADA measures in order to accommodate such use. 5.4 Encourage and consider supporting local private non-profit groups that address the housing needs of the homeless and other disadvantaged groups. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 26 p:,~ooo~N~oz~pcoNs~rr~crvoc OPEN SPACE / CONSERVATION ELEMENT OPEN SPACE / CONSERVATION ELEMENT Goal 1: A high quality parks and recreation system that meets the varying recreational needs of residents. Discussion: A major feature of the Harveston Specific Plan is the system of parks and landscaped parkways with paseos, which link the lake complex, and school recreational facilities and the community park in the Open Space and Recreation Program. The Project Park Program is extensive and provides a vast array of recreational opportunities in which all members of the community can participate. Further, the program incorporates many diverse elements in a coordinated, cohesive plan that interrelates with and links the various neighborhoods of the community with each other and to certain destination points, such as the lake, school, parks and mixed-use village. Policies 1.1 Apply the policies and standards contained in the City's Park and Recreation Master Plan to acquire sufficient parkland and recreation facilities to support new development. The Harveston Specific Plan includes a substantial amount of open space as community park, mini parks, arroyo park, lake park, paseo park and paseos and trails throughout the development. The provision of parks and open space complies with the City's Park and Recreation Master Plan. 1.2 Require the dedication of parkland and development of facilities to be consistent with the Parks and Recreation Master Plan. The proposed plan complies with the Parks and Recreation Master Plan. 1.3 Require developers of residential projects greater than fifty dwelling units to dedicate land based on the park acre standard of five (5) acres of usable parkland to one thousand (1,000) population, or the payment of in-lieu fees in accordance with the parks and Recreation Master Plan. Adequate amount of parks and open space has been dedicated based on the above standards and calculations. 1.4 Park credit for land with floodplains shall be given in accordance with the Parks and Recreation Master Plan. This policy is not applicable because the project site does not contain any flood plains. 1.5 Pursue the joint use of public lands available and suitable for recreation purposes, including lands under the jurisdiction of the Riverside County Flood Control District, Southern California Edison, water districts, and other public agencies. This policy is not applicable because the project proposes community and neighborhood parks throughout the development, and it is not in close vicinity of any public lands that can be utilized for joint use. FEBRUARY 2001 27 OPEN SPACE / CONSERVATION ELEMENT 1.6 Encourage the enhancement and preservation of significant natural features, including riparian areas, rock outcroppings, sensitive habitat areas and viewpoints through park design and site development. One feature of the Harveston Specific Plan is the Arroyo Park, which is a naturalistic park that preserves the existing creek bed and creates a Hparian environment. The Arroyo Park will provide a different recreational experience to the residents of the community. 1.7 Encourage the enhancement and preservation of historic stxuctures and landscape features in the design, development and use of parks. The design and development of the different parks within the Specific Plan area will be based on extensive use of landscape features to create a unique experience. No historic structures exist within the project area. 1.8 Encourage public safety and compatibility with adjacent use in park design and development, including location of buildings, activity areas, lighting and parking. Design features such as special architectural treatment, perimeter and interior landscaping, and lighting will be incorporated into the project for safety and compatibility with the adjacent uses. The Community Park has been designed consistent with City standards (see Figure 6.3, Community Park Detail). 1.9 Coordinate long range park and open space planning with Riverside County and the City of Murrieta. 1.10 This policy is not applicablq because it is a City directed policy. Maximize pedestrian and bicycle access to existing and new parks as an alternative to automobile access. The Specific Plan project proposes extensive trails and bike lanes that would connect to all the different planning areas and uses, including parks. 1.11 Encourage joint recreational use between school and park facilities when appropriate. 1.12 This policy is not applicable because the community park and the proposed elementary school are not in close adjacency to one another, therefore making it difficult to encourage true joint use. Consider the establishment of development impact fees to cover the cost of capital improvements for parks and recreation facilities needed to serve new development. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 28 OPEN SPACE / CONSERVATION ELEMENT Goal 2: Conservation and protection of surface water, groundwater and imported water resources. Discussion: The l-larveston Specific Plan will coordinate with Riverside County Flood Control District to design necessary flood control improvements for Murrieta Creek and Temecula Creek that preserve the important natural features and resources of the local creeks and the riparian forest of the Santa Margarita River Watershed, to the maximum extent feasible. The project will protect groundwater in cooperation with the Rancho California Water District and conserve potable water by requiring water conservation techniques in all new developmenZ. The project will also encourage utilization of reclaimed water, if available, for irrigation and other appropriate uses. Policies 2.1 Coordinate with Riverside County Flood Control District to design flood control improvements for Murrieta Creek and Temecula Creek that preserve the important natural features and resources of the local creeks and the riparian forest of the Santa Margarita River, to the maximum extent feasible. The Harveston Specific Plan provides for drainage and flood control facilities and improvements in accordance with the City of Temecula and the Riverside County Flood Control District requirements. (See Section 5.0, Infrastructure Plan). 2.2 Identify and protect groundwater resources from depletion and sources of pollution in cooperation with the Rancho California Water District. The proposed project will comply with standard specifications to protect groundwater resources from depletion and sources of pollution in cooperation with the Rancho California Water District. 2.3 Conserve potable water by requiring water conservation techniques in alt new development. The Harveston Specific Plan will comply with Title 20, California Administrative Code Section 1604 09 (Appliance Efficiency Standards), which establish efficiency standards that set the maximum flow rate of all new showerheads, lavatory faucets, etc., as well as Health and Safety Code Section 17621.3 which requires low-flush toilets and urinals in virtually all buildings. 2.4 Use reclaimed water for the irrigation of parks, golf courses, publicly landscaped areas and other feasible applications as service becomes available from RCWD and EMWD. The proposed project will encourage utilization of reclaimed water, if available, for irrigation and other appropriate uses. FEBRUARY 2001 29 OPEN SPACE / CONSERVATION ELEMENT 2.5 2.6 2.7 2.8 2.9 2.10 Require the use of soil management techniques to reduce erosion, eliminate off-site sedimentation, and prevent other soil-related problems that may adversely affect waterways in the community. All construction activities that results in the disturbance of at least five acres of total land area or activity which is part of a larger common plan of development of five acres or greater, will obtain the appropriate State general permit for National Pollution Discharge Elimination System (NPDES) perraits and pay the appropriate fees. All development within the Specific Plan boundaries will be subject to future requirements adopted by the City to implement the NPDES program. Mitigation measures may include, but not be limited to: onsite retention; covered storage of all outside storage facilities; vegetated swales; monitoring programs, etc. Regulate and manage lands adjacent to or affecting watercourses as stipulated by the Regional Water Resources Control Board. This policy is not applicable because it is a City directed policy. The Specific Plan Project has, however, obtained 401 permits from the RWQCB. Ensure that approved projects have filed a Notice of Intent and Stormwater Pollution Prevention Plan in accordance with the Federal Clean Water Act, prior to issuance of building permits. This policy is not applicable because it is a City directed policy. The EIR does, however, require filing ora Notice of lntent as mitigation. Ensure adequate inspection and enforcement of the requirements of General ConsWacfion Permits, particularly related to erosion control during grading and construction. This policy is not applicable because it is a City directed policy. Participate in regional planning for the Santa Margarita River Watershed in conjunction with Federal, State, Regional and local agencies, and non-profit organization. This policy is not applicable because it is a City directed policy. Participate in water resources management planning to facilitate the long-term availability of water resources for western Riverside County. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 30 OPEN SPACE / CONSERVATION ELEMENT Goal 3: Conservation of important biological' habitats and protection of plant and animal species of concern, wildlife movement corridors, and general biodiversity. Discussion: Based upon the findings of the biological studies performed for the site, the proposed project site does not include significant onsite biological resources. The project proposes an arroyo park, which will include the creation ora riparian habitat. The Arroyo Park will be developed consistent with the mitigation requirement and permits of the U.S. Army Corps and State Department of Fish and Game. The Specific Plan will also incorporate local native vegetation, mature trees, and/or other significant vegetation into the landscape design of the proposed development. PoHci~ 3.1 Require development proposals to identify significant biological resources and provide mitigation, including the use of adequate buffering; selective preservation; the provision of replacement habitats; the use of sensitive site planning techniques including wildlife corridor/recreational trails; and other appropriate measure. Based upon the findings of the biological studies performed for the site, the proposed project site does not include significant onsite biological resources. The project proposes an arroyo park, which will include the creation of a riparian habitat. The Arroyo Park will be developed consistent with the mitigation requirement of the U.S. Army Corps and State Department ofFish and Game. 3.2 Work with State, regional and non-profit agencies and organizations to preserve and enhance significant biological resources on publicly owned lands. This policy is not applicable because it is a City directed policy. 3.3 Coordinate with the County of Riverside and other relevant agencies in the adoption and implementation of the Riverside County Multi-Species Habitat Conservation Plan. This policy is not applicable because it is a City directed policy. 3.4 Encourage developers to incorporate native drought-resistant vegetation, mature trees, and other significant vegetation into the site and landscape design for proposed projects. The Harveston Specific Plan will incorporate local native vegetation, mature trees, and/or other significant vegetation into the landscape design of the proposed development (see Section I0.0, Design Guidelines). 3.5 Maintain an inventory of existing natural resources in the City through periodic updates of the Master Environmental Assessment. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 31 OPEN SPACE / CONSERVATION ELEMENT 3.6 Limit the recreational use of designated open space areas where sensitive biological resources are present. This policy is not applicable because it is a City directed policy. 3.7 Maintain and enhance the resources of the Temecula Creek, Santa Margarita River, Pechanga Creek and other water ways to ensure the long-term viability of the habitat, wildlife, and wildlife movement corridors. This policy is not applicable because it is a City directed policy. Goal 4: Conservation of energy through the use of available technology and conservation practices. Discussion: To reduce energy use, the proposed Specific Plan will utilize energy saving techniques such as orienting buildings properly (i.e., north/south lot orientation), planting trees to take advantage of the sun, ensuring adequate roof overhangs, providing properly insulated walls and providing simple heat storage systetns such as dual-paned windows. The project development will also include utilization of energy efficient building materials for construction in order to reduce energy use. Policies 4.1 -Encourage the use of site planning techniques, building orientation and building design that reduce energy use. To reduce energy use, the proposed Specific Plan will utilize energy saving techniques such as orienting buildings properly (i.e., north/south lot orientation), planting trees to take advantage of the sun, ensuring adequate roof overhangs, providing properly insulated walls, aru~ providing simple heat storage systems such as dual-paned windows. 4.2 Require the use of energy efficient building materials to reduce energy use. Besides using the above techniques, the project development will also include utilization of energy efficient building materials for construction in order to reduce energy use. Goal 5: Conservation of open space areas for a balance of recreation, scenic enjoyment, and protection of natural resources and features. Discussion: The Specific Plan will conserve open space areas for a balance of recreation, scenic enjoyment and protection of natural resources and features by including clustered housing as part of its land use proposal, and by dedicating substantial areas of open space as FEBRUARY 2001 32 ~:eooo~sj~o~apcosstsr~c~oc OPEN SPACE / CONSERVATION ELEMENT community park, mini parks, arroyo park, lake, lake park, paseo park, and extensive paseos and trail system PoHcies 5.1 Pursue the conservation of the western and southern ridgelines, the Santa Maxgarita River, slopes in the Sphere of Influence, and other important landforms and historic landscape features through the development review process and as a condition of project approval. This policy is not applicable because it is a City directed policy. 5.2 Identify significant viewsheds to proposed projects that may be preserved through the dedication of open space or the use of sensitive grading, site design and building techniques. This policy is not applicable because it is a City directed policy. 5.3 Encourage the use of clustered development and other site planning techniques to maximize the preservation of open space. The Harveston Specific Plan includes clustered housing as part of its land use proposals, and it dedicates substantial areas of open space as community park, mini parks, arroyo park, lake, lake park, paseo park, and extensive paseos and trail system. 5.4 Retain and improve the quality of landscaping in parkways, public slopes, rights-of-way, parks, civic facilities and other public open areas. The Design Guidelines Section (10.0) of the Specific Plan includes landscaping guidelines, which proposes landscaping of high standards and quality for the entire site. 5.5 Coordinate with Homeowner's Association to maintain landscaping along slopes adjacent to public right-of-ways. The Harveston Specific Plan includes a maintenance plan (see Figure 12.2) which oudines the future maintenance responsibilities of slopes, roadways and public and private open space and recreational facilities. Landscape sections, which identify maintenance responsibilities, are also included in Section 12.0. 5.6 Coordinate with Homeowner's Associations to maintain landscaping along slopes adjacent to public right-of-ways. The Harveston Specific Plan has dedicated parkland in conformance with the policies and standards of the Park and Recreation Master Plan of the City of Temecula. The Specific Plan included a maintenance plan, which addresses maintenance responsibilities adjacent to Public right-of-way. 5.7 Requh'e adequate open space in new development for both passive and active recreation. FEBRUARY 2001 33 OPEN SPACE / CONSERVATION ELEMENT 5.8 5.9 5.10 5.11 5.12 The Harveston Specific Plan has dedicated adequate amounts of open space for both active and passive recreation, based on the requirements of the TCSD. Require the vegetation of graded slopes concurrent with project development to minimize erosion and maintain the scenic character of the community. Vegetation of graded slopes will be required in order to minimize erosion and visual impacts concurrent with project development. Require the connection of open space and recreation areas to adjacent developments and publicly owned recreation areas where appropriate. The proposed trail system will connect to the public Community Park which, is part of the Specific Plan area and also to City wide trails and the existing Margarita Park located off- site. Study the feasibility of establishing a System of Transferable Development Credits, in conjunction with the County, to conserve open space or agricultural uses. This policy is not applicable because it is a City directed policy. Incorporate seismic hazard safety Zones into valley-wide open space and park systems. This policy is not applicable because it is a City directed policy. Encourage the use of native vegetation where re-vegetation and landscaping is to occur. The proposed plan will utilize native vegetation for the re-vegetation of the Arroyo Park. Goal 6: Preservation of significant historical and cultural resources. Discussion: This goal is not applicable because according to the Initial Study (and the City of Temecula General Plan), the site does not contain any sensitive archaeological resources. Although the study found no paleontological sites, project implementation could expose fossils through grading and other development activities. Implementation of EIR mitigation measures will ensure that exposure of cultural resources during grading/construction does not occur. Policies 6.1 Maintain an inventory of areas of sensitive archaeological/paleontological sensitivity in the planning area. According to the Initial Study (and the City of Temecula General Plan), the site does not contain any sensitive archaeological resources. The cultural resources study that was prepared concluded the same. Although paleontological sites were not found on the site, FEBRUARY 2001 34 p:,:oo~oza~co~s, sr~c~ooc OPEN SPACE / CONSERVATION ELEMENT 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 project implementation could expose fossils through grading and other development activities. Implementation of E1R mitigation measures will ensure that exposure of cultural resources during grading/construction does not occur. Require sites proposed for future development to be evaluated for archaeological resources in accordance with the procedures established in a Memorandum of Agreement with the Eastern Information Center at UC Riverside. A cultural resource study was performed evaluating for archaeological resources in conformance with the procedures established in a Memorandum of Agreement with the Easter Information Center at UC Riverside. Require sites proposed for furore development that are identified in this Element as being of high or undetermined paleontological sensitivity to be evaluated by a qualified vertebrate paleontologist. Although the study found no paleontological sites, project implementation could expose fossils through grading and other development activities. Implementation of EIR mitigation measures will ensure that exposure of cultural resources during grading/construction does not occur. Require sites containing significant archaeological or paleontological resources to either preserve identified sites or provide for the professional retrieval of artifacts prior to development. Implementation of the mitigation measures contained in the EIR will ensure that exposure of cultural resources during grading/conservation does not occur. Require that a certified archaeologist and/or paleontologist be present on site during grading, earth moving, or demolition of smactures when these resources have been discovered during consmaction, and for sites designated or potentially designated as culturally significant ia order to ensure these sites are preserved and protected. Native American observers may be requested to be present on site to observe and reffieve cultural resources when deemed necessary by a certified archaeologist or paleontologist and/or when mandated by state law. Although the cultural resources study performed did not identify any paleontological sites, project implementation couM expose fossils through grading and other development activities. Implementation of mitigation measures will ensure that exposure of cultural resources during grading/construction does not occur. Not applicable because project is not in Old Town Specific Plan area. Not applicable because project is not in Old Town Specific Plan area. Not applicable because project is not in Old Town Specific Plan area. Not applicable because project does not contain historic structures on-site. FEBRUARY 2001 35 OPEN SPACE / CONSERVATION ELEMENT 6.10 Not applicable because project does not contain historic structures on-site. 6.11 Not applicable because project does not contain historic structures on-site. Goal 7: Protection of prime agricultural land from premature conversion to urbanized uses. This goal is not applicable because the Harveston Specific Plan site does not contain any prime agricultural land, which would be converted to urbanized uses. Goal 8: A trail system that serves both recreational and transportation needs. Discussion: The proposed Harveston Specific Plan trail system proposed connections to the City wide trail system. It also seeks to create a pedestrian friendly environment where extensive trails and bike lanes are provided for ease of access between different planning areas and land uses. Policies 8.1 Provide a City-wide recreation system that connects to the County's regional trail system through adoption of a Master Plan of Trails that provides for bicycling, equestrian, hiking and jogging trails and support facilities. This policy is not applicable because it is a City directed policy. 8.2 Negotiate land deeds as necessary to implement the City-wide trail system. This policy is not applicable because it is a City directed policy. 8.3 Require proposed development to provide trail connections to the cit};-wide trail system as defmed by the Parks and Recreation Master Plan and Master Plan of Trails. The proposed Harveston Specific Plan trail system proposes connections to the City-wide trail system, according to the Parks and Recreation Master Plan and Master Plan of Trails. 8.4 Require development plans to identify locations for an internal u'ails/sidewalk system that links land uses and provides convenient travel to transit facilities. The Specific Plan seeks to create a pedestrian friendly environment where extensive trails and bike lanes are provided for ease of access between different planning areas and land FEBRUARY 2001 36 p:~ooozN~oz~rco~s~rr~cr, voc OPEN SPACE / CONSERVATION ELEMENT Goal 9: Protection of dark skies from intrusive light sources, which may impact the Palomar Observatory Discussion: The Harveston Specific Plan is located within thirty (30) miles of Mount Palomar Observatory. In order to reduce light and glare impacts to the operations at the Observatory, outdoor lighting will be from Iow-pressure sodium lamps that are oriented and shielded to prevent direct illumination above the horizon plane passing through the luminare. Current supplies of electrical service hove been strained due to recent de-regulation of the power industry. Recent shortages in generation capacity may require residents and business owners to pay higher costs for electricity or accept limitations required by the utility purveyors during periods of limited supply. The State of California is in the process of addressing this issue, as it is a Statewide and regional issue. ~'mitations will be resolved as new generating capacity is brought on line over the next few years. The project will be developed in stages and is anticipated to commence construction in early-2001. Policies 9.1 Coordinate with the County of Riverside and California Institute of Technology for Economic Research Purposes to ensure preservation procedures for dark skies are incorporated into the City development review process. This policy is not applicable because it is a City directed polio'. Please see consistency analysis for Goal 9, above._ 9.2 Participate in Palomax Observatory's dark sky conservation areas. The Harveston Specific Plan is located within thirty (30) miles of Mount Palomar Observatory. In order to reduce light and glare impacts to the operations at the Observatory, outdoor lighting will be from low pressure sodium lamps thor are oriented and shielded to prevent direct illumination above the horizon plane passing through the luminare. FEBRUARY 2001 37 ~:x:ooo~t~o~arcosstrr~c~ooc GROWTH MANAGEMENT ELEMENT GROWTH IVIANAGEMENT / PUBLIC FACILITIES ELEMENT Goal 1: Cooperate management of growth among local governments within Riverside County. Discussion: This goal is not applicable because it is a City directed goal. However, the Harveston Specific Plan provides ample amounts of open space for the enjoyment of the future residents of the Harveston community as well as the residents of neighboring development and the City in general. Also, the infrastructure standards have been prepared in coordination with the adjacent jurisdiction and property owners to help ensure compatibility. The plan does create unique development standards that will maintain the quality of life and the integrity of the proposed development. .Policies 1.1 Continue to participate with the Western Riverside Council of Governments in the preparation of plans and programs addressing regional issues, including the Growth Management Strategy, Comprehensive Transportation Plan, Water Resources Strategy, and School Facilities Plan. This policy is not applicable because it is a City directed poIicy. Sffive to achieve the policies of WRCOG's Growth Management Strategy as appropriate through Temecula's Growth Management Program. 1.2 1.3 1.4 1.5 This policy is not applicable because it is a City directed policy. Assist in the establishment of cooperative efforts to implement development standards, which address quality of life issues. The Har~eston Specific Plan contains extensive development standards, which strive to enforce a set of standards that would enhance and maintain a high quality of life for the community residents. Strive to achieve economic growth and prosperity, while preserving natural beauty and the social quality of life in southwestern Riverside County. The Harveston Specific Plan has been prepared in conformance with the City of Temecula General Plan, and as such the goal of the Specific Plan is to introduce a development within the southwestern Riverside County that will achieve economic growth (i.e., 112.4 acres of Service Commercial proposed) and yet preserve the beauty and quality of life in the area (Le., extensive park and open space program proposed). Encourage or assist in the establishment of natural reserves for the preservation of sensitive and endangered species, and to provide open space for residents. The Harveston Specific Plan provides ample amounts of open space for the enjoyment of the future residents of the Harveston community as well as the residents of neighboring developments and the City in general. The plan also includes a lO. 5-acre arroyo park, which will create a riparian habitat and preserve the defined U.S. waters creek bed in its natural state. The project site does not contain any sensitive or endangered species. FEBRUARY 2001 38 GROWTH MANAGEMENT ELEMENT 1.6 1.7 1.8 1.9 1.10 Seek to establish minimum compatibility with adjacent jurisdictions for basic development standards related to infrastructure and engineering, while preserving unique zoning and design standards. The Harveston Specific Plan infrastructure standards have been prepared in coordination with the adjacent jurisdiction and property owners to help ensure compatibility. The plan does create unique development standards that will maintain the quality of life and the integrity of the proposed development. Establish a joint planning process with the County to plan for future development in the Sphere of Influence. This policy is not applicable because it is a City directed policy. Establish a joint review process with the County to ensure that proposed projects in the Sphere of Influence can be adequately served in the future by the City. This policy is not applicable because it is a City directed policy. Guide the timing and provision of facilities and services to support development and protect or enhance the quality of life. The Harveston Specific Plan proposes'a phasing plan of development (see Figure 12. I, Phasing Plan, in Section 12.0, Implementation and Administration) that would ensure provision of facilities and services to support development as the project buildout proceeds. Require development to pay its fair share of the costs of facilities and services required to serve the resulting level of growth. The Harveston Specific Plan will be conditioned to pay Development Impact Fees and other required fees to mitigate its share of impacts on facilities and services that will serve the future growth. 1.11 Pursue joint efforts to achieve fiscal stability for both City and County government. 1.12 This policy is not applicable because it is a City directed policy. Consider options to jointly contract with other jurisdictions for the provisions of services or facilities to achieve economies of scale. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 39 p:~ooo~s~s*apcosstrrv~cr, ooc GROWTH MANAGEMENT ELEMENT Goal 2: Orderly and efficient patterns of growth within Temecula that enhance the quality of life for residents. Discussion: In an effort to enhance the quality of life for residents, the Harveston Specific Plan includes a Mixed Use Village Center that proposes a mix of uses with an efficient circulation and open space system. The proposed project also includes a variety of housing types in terms of cost, density and design to meet the needs of different segments of the population. In nrMition, it includes commercial uses, which would create jobs locally and regionally, therefore, maintaining a balance between jobs and housing opportunities. Policies 2.1 Prepare and implement a Growth Management Program for Temecula. 2.2 2.3 This policy is not applicable because it is a City directed policy. Ensure that phasing of public facilities and services occur in such a way that new development is adequately supported as it develops. The Harveston Specific Plan proposes a phasing plan of development (see Figure 12.1, Phasing Plan, Section 12.0, Implementation and Administration) that would ensure provision of facilities and services to support development as the project buildout proceeds. Establish and maintain level of service standards in order to document adequacy requkements. 2.4 2.5 2.6 The Harveston Specific Plan E]R provides an analysis of the project's impacts on levels of service and proposes mitigation to ensure adequate level of service standards are maintained with project implementation. Encourage development of Mixed Use Village Centers, as defined in the Land Use and Community Design Elements to reduce public service costs and environmental impacts through compatible land use relationships, and efficient circulation and open space systems. The Harveston Specific Plan includes a Mixed Use Village Center that proposes a mix of uses with an efficient circulation and open space system. Encourage new development that helps to create and maintain a balance between jobs and housing opportunities. The proposed project includes a variety of housing types in terms of cost, density and design to meet the needs of different segments of the population. In addition, it includes commercial uses, which would create jobs locally and regionally, therefore, maintaining a balance between jobs and housing opportunities. Establish priority growth areas within the City and Sphere of Influence where near-term urbanization will be encouraged. FEBRUARY 2001 40 GROWTH MANAGEMENT ELEMENT 2.7 2.8 This policy is not applicable because it is a City directed policy. Discourage the use of assessment disu-icts that promote urban sprawl and premature urbanization in rural and agricultural areas. This policy is not applicable because it is a City directed policy. Coordinate the Growth Management Program with the Congestion Management Program as necessary. This policy is not applicable because it is a City directed policy. Goal 3: Effective and cost efficient sheriff, fire and emergency medial service within the City. Discussion: The Harveston Specific Plan EIR provides an analysis of the project's impacts on police and fire protection levels of service and proposes mitigation to ensure adequate level of service standards is maintained with project implementation. Policies 3.1 Strive to provide a minimum of one full-time officer per 1,000 residents for police protection services. The Harveston Specific Plan EIR provides an analysis of the project's impacts on police protection levels of service and proposes mitigation to ensure adequate level of service standards are maintained with project implementation. 3.2 Strive to provide a minimum response time of between 7 and 10 minutes of an alarm for 90 percent of all fires, in accordance with the Riverside County Fixe Protection and Emergency Master Plan. The Harveston Specific Plan EIR provides an analysis of the project's impacts on fire protection levels of service and proposes mitigation to ensure adequate level of service staadarde are maintained with project implementation. 3.3 Require new development to address fire and police protection in a proactive and preventative way through stxeet design, orientation of en~yways, siting of structures, landscaping, lighting and other security features. The Harveswn Specific Plan design guidelines and standards (see Section 10.0, Design Guidelines) provide for features listed above that would create a safe and secure environment for the residents. Additionally, the Specific Plan and EIR will be reviewed by police and fire so additional recommendation can be incorporated if necessary. 3.4 Coordinate with the County of Riverside in the location and phasing of new sheriff facilities or fire stations to ensure that adequate service levels are maintained. FEBRUARY 2001 41 GROWTH MANAGEMENT ELEMENT 3.5 3.6 3.7 This policy is not applicable because it is a City directed policy. Promote the establishment of Neighborhood Watch Programs in conjunction with the Sheriff's Department to increase the surveillance of neighborhoods. This policy is not applicable because it is a City directed policy. Consider the provision of police services by the City if it is more cost effective than contracting with the County of Riverside. This policy is not applicable because it is a City directed policy. Promote community awareness regarding drug use and gangs through the Police Department, Community Service Department, and public serdce organizations. This policy is not applicable because it is a City directed policy. Goal 4: A quality school system that contains adequate facilities and funding to educate the youth of Temecala. Discussion: The Temecula Valley Unified School District has been actively involved in the Harveston Specific Plan process, aru~ a 12.0-acre site has been designated for an elementary school in response to the District's request. The School District will be made aware of future legislative land use policy decisions. There will be a need to expand school facilities at all levels to accommodate students from the proposed project. The District anticipates funding the school facilities for the proposed project from the fees collected through an existing school agreement, with half of the estimate being funded by the State, so long as those funds are available. PoHci~ 4.1 Provide information to the Temecula Valley Unified School district, when considering General Plan amendments, specific plans, zone changes, or other legislative land use policy decisions, to support the School district in providing adequate school facilities for students for new development to the extent permitted by law. The Temecula Valley Unified School District has been actively involved in the Harveston Specific Plan process, and a 12.0-acre site has been designated for an elementary school in response to the District's request. The School District will be made aware of.future legislative land use policy decisions. 4.2 Promote and encourage the phasing of project development so that the School district may plan, finance, and construct school facilities intended to serve the development. The proposed project applicant is having continual discussions with the School District regarding the phasing of the development plan in relation to the timing of the school site development. FEBRUARY 2001 42 p:~oo~w~oz~co~s~rr~vcv, tx~c GROWTH MANAGEMENT ELEMENT 4.3 Review proposed legislative land use decisions in the context of the adequacy of present and future facilities as permitted by law. The Harveston Specific Plan has been prepared based on the City of Temecula General Plan, and as such adheres to all the requirements of the City and takes into account adequacy of present and future facilities in making land use proposals. 4.4 Provide safe access for school children walking, bicycling, or driving to and from school sites through coordination between the school district, and City departments of Planning, Public Works, and Engineering. The proposed project provides for an extensive system of trails, paseos, and bike lanes. These pedestrian/bicycle circulation systems have been designed through coordination with the City and School District and are consistent with the guidelines and requirements of the City of Temecula~ 4.5 Pursue the establishment of a Ixade school, junior college or 4oyear college in Temecula that offers an emphasis in the education required by the engineering, biotechnical and biomedical industries located in Temecula. 4.6 This policy is not applicable because it is a City directed policy. Plan for the joint use of school/municipal facilities wherever feasible and desirable, including: the joint use of school grounds, buildings, City parks, multi-purpose buildings, and recreation facilities. This policy is not applicable because it is a City directed policy. Goal 5: Public and Quasi-public facilities and services which provide for the social, cultural, civic, religious, and recreational needs of the community. Discussion: The Harveston Specific Plan provides areas (i.e., community park, village green, lake park, club house facility and school) where citizens would come together and participate in community programs. Child care facilities are pennined uses within the Mixed Use Village Center and High-Density Residential areas of the Specific Plan area. Senior citizens centers are permitted uses within the Mixed Use Village Center of the Specific Plan area. Religious institutions and other quasi-public uses are permitted and encouraged within the Mixed Use Overlay Zone. The proposed project encourages promoting such use for the benefit of all the community. Policies 5.1 Acquire a civic center site and construct permanent City Hall facilities when feasible. This policy is not applicable because it is a City directed policy FEBRUARY 2001 43 GROWTH MANAGEMENT ELEMENT 5.2 5.3 Continue to encourage citizens to participate in community programs and volunteer for public service positions. The Harvestan Specific Plan provides areas (i.e., community park, club house facility and school) where citizens would come together and participate in community programs. The proposed project encourages promoting such activities for the benefit of all the community. Evaluate the feasibility of providing child care facilities in connection with employment- generating uses. Child care facilities are permitted uses within the Mixed Use Village Center and High Density Residential areas of the Specific Plan area. The proposed project encourages promoting such use for the benefit of all the community. 5.4 Encourage the development of a senior citizens center(s). Senior citizens centers are permitted uses within the Mixed Use Village Center of the Specific Plan area. The proposed project encourages promoting such use for the benefit of all the comlnunigy, 5.5 Encourage the provision of cultural facilities within the community, including: art museums, theaters, a performing arts center, special exhibitions, an outdoor amphitheater, and Indian Cultural Interpretive Center. The proposed Specific Plan includes an array of uses including, outdoor amphitheater, art displays, outdoor exhibition areas, and more. Such uses are permitted and encouraged within this zone. 5.6 Encourage the provision of special recreation facilities such as a stadimn, a zoo, and an amusement park. This policy is not applicable because the proposed Harveston Specific Plan does not propose a stadium, a zoo, and an amusement park. 5.7 Encourage the sharing or combining of public facilities for educational, cultural, and recreational purposes to more efficiently utilize public spaces and to provide viable community gathering Multi-purpose facilities, which confirm the above listed uses are permitted and encouraged within the Mixed Use Overlay Zone. 5.8 Encourage the availability of sites for religious institutions and other quasi-public uses in the City. Religious institutions and other quasi-public uses are permined and encouraged within the Mixed Use Overlay Zone. 5.9 Cooperate with Riverside County to provide for library facilities and services that are consistent with community needs. FEBRUARY 2001 44 p:~oo~j~z~rcoNstrr~czooc GROWTH MANAGEMENT ELEMENT 5.10 This policy is not applicable because it is a City directed policy. Continue to assist non-profit community organizations in terms of fmanciai and other forms of support to the extent feasible. This policy is not applicable because it is a City directed policy. Goal 6: A water and wastewater infrastructure system that supports development in the Study Area. existing and future Discussion: The proposed waster and wastewater plans for Harveston Specific Plan area will support future development in the area. The proposed Harveston Specific Plan area is located within the Rancho California Water District water service area. The proposed water plan consists of 12- inch and 16-inch backbone pipelines for domestic and fire service to the proposed commercial, residential, and parkland uses. The wastewater flows are proposed to be treated at the Santa Rosa Water Reclamation Plant, which is owned and operated by the RCWD. Sewer from the proposed project area will be directed to the Eastern Municipal Water District sewer system along Santa Gertrudis Creek at two locations. Policies 6.1 Require landowners to demonstrate that an available water supply and sewer treatment capacity exists or will be provided to serve proposed development, prior to issuance of building permits. Section .5.0, Infrastructure Plan, of the Specific Plan requires that future development provide assurance for provision of adequate water supply and sewer treatment capacity prior to issuance of building permits. 6.2 Requh'e landowners, prior to issuance of building permits, to demonstrate that adequate wastewater capacity exists to accommodate the proposed development. Section .5.0, Infrastructure Plan, of the Specific Plan requires that future development provide assurance for provision of adequate wastewater capacity prior to issuance of building permits. 6.3 Coordinate with the water and wastewater districts when considering General Plan amendments, annexations, or development agreements; in order to assist the districts in planning for adequate capacity to accommodate future growth. The Harveston Specific Plan water and wastewater plans have been prepared in coordination with the appropriate districts. The districts were also contacted for input during the EIR process. 6.4 Coordinate with the wastewater district to make reclaimed water available for irrigation purposes in the City. FEBRUARY 2001 45 GROWTH MANAGEMENT ELEMENT 6.5 6.6 The irrigation system will be designed to conform to the State's Water Conservation Assembly Bill 325 and City of Temecula Water Conservation Ordinances in effect. Additionally, the project will utilized reclaimed water, as available, for irrigation. Encourage the preparation of a long-term water management program by the District, and assist the District where appropriate. The District has been contacted for information and requirements during preparation of the utility plan.for the Harveston Specific Plar~ The District was also contacted for input during the EIR process. Requh'e all new construction of water and sewer infrastructure to be consistent with utility master plans and to implement the policies of the Gen*ra~ Plan. The Harveston Specific Plan Section 5.0, Infrastructure Plan, requires all new construction of water and sewer infrastructure be consistent with the utility master plans and policies of the General Plan. All water and sewer lines will be designed per EMWD and/or RCWD District requirements. Goal 7: An effective, safe and environmentally compatible flood control system. Discussion: Drainage and flood control facilities and improvements will be provided in accordance with the City of Temecula and the Riverside County Flood Control District requirements. The proposed drainage plan utilizes the project streets and storm drains to carry storm water to the existing natural drainage courses and to the drainage facilities under the 1-15 freeway. A storm drain system is proposed to carry storm water that exceeds surface street capacity. Policies 7.1 Work with the Riverside County Flood Consol District and other agencies involved in the Murrieta Creek flood control improvements to implement a flood conlxol solution that maximizes the retention of natural resources and the provision of recreation opportunities along the creek. 7.2 7.3 This policy is not applicable because it is a City directed policy. Prepare a City of Temecula Master Drainage Plan, which incorporates the Murrieta Creek Area Drainage Plan and additional planning efforts into one document. This policy is not applicable because it is a City directed policy. Develop master drainage plans, when appropriate, for the Sphere of influence, in conjunction with the Flood Control District. This policy is not applicable because it is a City directed policy. FEBRUARY 200] 46 GROWTH MANAGEMENT ELEMENT .-,,. Goal 8: A solid waste management system that provides for the safe and efficient collection, transportation, recovery and disposal of solid wastes. Discussion: The solid waste produced within the development area will be safely carried to the disposing facilities. Policies 8.1 Coordinate with the County of Riverside to provide and expand service for the collection, storage, transportation, recovery, and disposal of solid waste to meet the needs of the City. The proposed project will comply with the City of Temecula and County of Riverside requirements, and it will implement existing collection, storage, transportation, recovery and disposal of solid waste. 8.2 Provide for the collection and disposal of household hazardous waste through the adoption of a Household H~7ardous Waste Element. This policy is not applicable because it is a City directed policy. 8.3 Provide for solid waste reduction and recycling within the City through the adoption of a Source Reduction and Recycling Element. This policy is not applicable because it is a City directed policy. Goal 9: Adequate electrical, natural gas, and telecommunication systems to meet the demand of new and existing development. Discussion: Electrical service is currently provided in the area by Southern California Edison Company (SCE). Adequate electric power supply can be provided. Natural gas service is currently provided by Southern California Gas Company. SCG indicates that gas service could be provided to the Specific Plan area in accordance with the Company's policies and extension rules on file with the California Public Utilities Commission at the time contractual arrangements are made. Policies 9.1 Coordinate with the responsible companies to provide for the continued maintenance, development, and expansion of electricity, natural gas, and telecommunications systems to serve residents and businesses. 9.2 As part of the Specific Plan EIR process, all utilities companies responsible for providing services to the new development were contacted to inquired about the level of service availability and nrMitional requirements. Pursue the undergxounding of utilities along arterial roads, where feasible. The Harveston Specific Plan requires all new utility lines be undergrounded, in conformance with the requirements of the City of Temecula. FEBRUARY 2001 47 PUBLIC SAFETY ELEMENT PUBLIC SAFETY ELEMENT Goal 1: Protection from natural hazards associated with geologic instability, seismic events, and flooding. Discussion; To protect from natural hazards associated with geologic instability, seismic events, and flooding, the Harveston Specific Plan EIR includes a geatechnical investigation that evaluates soils and geologic condition~ to determine stability. Also, the Specific Plan and the EIR require that all new development onsite comply with the most recent Uniform Building Code seismic design standards. PoHcies 1.1 Require review of soil and geologic conditions to determine stability prior to project approval. Ia areas that may have significant geologic constraints, require analysis by a Registered Geotechnical Engineer. The Harveston Specific Plan EIR includes a geotechnical investigation prepared by a registered geotechnical engineer that evaluates soils and geologic conditions to determine stability. Geotechnical recommendations and mitigation measures will be incorporated as necessary. 1.2 Require mitigation of potential adverse impacts of geologic and seismic hazards, including ground surface rupture and liquefaction, at the project level. Mitigation measures are proposed and will be enforced at the project level for all identified potential geologic and seismic hazard impacts. 1.3 Monitor hazardous buildings in Old Town and work with property owners to remediate these buildings to improve structural integrity. This policy is not applicable because the Harveston Specific Plan is not located within the Old Town, and this is a City directed policy. 1.4 Require all new development to comply with the most recent Uniform Building Code seismic design standards. The proposed Harveston Specific Plan and the EIR will require that all new development onsite comply with the most recent Uniform Building Code seismic design standards. 1.5 Monitor the potential for seismic events and other geologic activity with the County of Riverside and California Division of Mines and Geology. This policy is not applicable because it is a City directed policy. Additionally, the Specific Plan and the E1R require that all new development onsite comply with the most recent Uniform Building Code seismic design standards. FEBRUARY 2001 48 r:eooo~N~oza~cossar~ncr, ooc PUBLIC SAFETY ELEMENT 1.6 Establish development management techniques to lessen the potential for erosion and landslides. Prior to initial grading, a soils report and geotechnical study will be performed that further analyze onsite soil conditions and slope stability and include appropriate measures to control erosion and landslide (see Sections 8.0, Grading Plan and I0.0, Design Guidelines). 1.7 Prohibit development in the floodway portion of the 100-year floodplain. This policy is not applicable because the project site is not located within the lO0-year floodplain. 1.8 Encourage only compatible uses within the 100-year floodplain. This policy is not applicable because the project site is not located within the lO0-year floodplain. 1.9 Minimize the intrusion into and alteration of the 100-year floodplain. This policy is not applicable because the project site is not located within the lO0-year floodplain. Goal 2: Protection of the public and environmental resources from exposure to hazardous materials and waste. Discussion: Based on the results ora Phase I analysis for the site, there are no potential risks associated with hazardous materials. .Policies 2.1 Minimize the risks associated with hazardous materials through careful land use planning. The Harveston Specific Plan provides a comprehensive development plan of all land within the Specific Plan area. Land use determination is based on the best and most appropriate use for the land and situation. Based on the results of a Phase l analysis for the site, there are no potential risks associated with hazardous materials. Goal 3: A safe and secure community, free from the threat of personal injury and loss of property. Discussion: To build a safe and secure community free from the threat of personal injury and loss of property, the Harveston Specific Plan incorporates defensible space into site plan and building design. The proposed project also provides secondary access points in conformance with the City standards to ensure timely emergency service response. Policies 3.1 Ensure adequate facilities and police and fire service personnel are provided in the City. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 49 PUBLIC SAFETY ELEMENT 3.2 Continue to work with the community in operating Neighborhood Watch program.~ that promote mutual assistance and crime prevention activities among residents. This policy is not applicable because it is a City directed policy. 3.3 Reduce the risk of wildland fire through imposition of site-specific development standards during project review. This policy is not applicable because it is a City directed policy. 3.4 Require new development to incorporate defensible space into site plan and building design. The Harveston Specific Plan incorporates defensible space into site plan and building design (see Section 10.0, Design Guidelines). 3.5 Require all residential development with 35 or more dwelling units to provide secondary access that meets all City standards to ensure timely emergency service response. The proposed project does provide secondary access points in conformance with the City standards to ensure timely emergency service response. Goal 4: An effective response of emergency services following a disaster. This goal is not applicable because it is a City directed goal. Policies 4.1 Provide for and maintain a coordinated emergency service response to reduce community risk and proper~y damage in the event of a disaster. This policy is not applicable because it is a City directed policy. 4.2 Coordinate emergency response planning with Riverside County and the Federal Emergency Management Agency. This policy is not applicable because it is a City directed policy. 4.3 Encourag. e community-wide emergency preparedness among City residents and the business commumty. This policy is not applicable because it is a City directed policy. 4.4 Regulate location of critical facilities to ensure their continued functioning following a disaster. This policy is not applicable because it is a City directed policy. 4.5 Establish and maintain an emergency operations center (EOC) for emergency and disaster situations in a safe and secure location. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 50 NOISE ELEMENT NOISE ELEMENT Goal 1: Land Use planning that provides for the separation of significant noise generators from sensitive receptor areas. Discussion: The design of the Ha rveston land use plan has taken into account noise factors and has sought to maintain a balance where no significant noise impact would result. There are no significant noise generators included within the Harveston Specific Plan area. The noise emanating from construction activities is considered temporary, however the EIR provides mitigation measures to mitigate this impact. Policies 1.1 Discourage noise sensitive land uses in noisy exterior environments unless measures can be implemented to reduce exterior and interior noise to acceptable levels. Alternatively, encourage less sensitive uses in areas adjacent to major noise generators but require appropriate interior working environments. The design of the Harveston land use plan has taken into account noise factors and has sought to maintain a balance where no significant noise impact would result. The EIR provides a detailed impact analysis and mitigation measures, as necessary. 1.2 Limit the hours of construction activity in residential areas in order to reduce the intrusion of noise in the early morning and late evening hours, and on weekends and holidays. As part of the Harveston Specific Plan EIR, a noise study was conducted m analyze potential noise impacts and introduce mitigation measures, including limitations on hours of construction. 1.3 Incorporate noise standards in the Development Code to ensure that residents are not exposed to excessive levels of noise bom stationary sources. As pan of the Harveston Specific Plan EIR, a noise study was conducted to analyze potential noise impacts and introduce mitigation measures. The Development Code includes standards that ensure the residents are not exposed to excessive noise levels from stationary sources. 1.4 Require proposed industrial or commercial projects located near existing or planned residential areas to demonstrate that the project when constructed, will comply with the City noise requirements. The Harveston Specific design guidelines and development standards require the Service Commercial uses comply with the City noise requirements. 1.5 Work with the school district to relocate the school bus maintenance yard to an area that will not adversely impact sensitive receptors. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 51 NOISE ELEMENT 1.7 1.8 1.6 Ensure that current noise hazard areas in the City are identified, quantified, and mapped in a form that is available to decisionmakers. This policy is not applicable because it is a City directed policy. Utilize the information from the noise contour map in the General Plan in the development review process to ensure that noise sensitive land uses are not located near major stationary noise SOurCeS. Development of the land use plan of the proposed project utilized information from the noise contour map to ensure that the noise sensitive land uses are not located near major stationary noise sources. Additionally, as part of the Harveston Specific Plan EIR, a noise study was conducted to analyze potential noise impacts and introduce mitigation measures, including noise standards in the Development Code. Minimize noise conflicts between land uses and the circulation network. The land use relationships of the Harveston Specific Plan area have been arranged in a manner to minimize any potential noise conflicts between land uses and the circulation network. Additionally, as part of the Harveston Specific Plan EIR, a noise study was conducted to analyze potential noise impacts and introduce mitigation measures, including noise standards in the Development Code. Existing light industrial uses will located next to residential uses in Planning Area No. 1. It should be noted that this will not present any conflict, as the side of the existing industrial building will be located at the rear of the residential uses. In addition, an additional landscape buffer has been included at the rear of these parcels. Goal 2: The control of noise between land uses. Discussion: As part of the Harveston Specific Plan EIR, a noise study was conducted to analyze potential noise impacts and to introduce mitigation measures, including noise standards in the Development Code. PoHci~ 2.1 Limit the maximum permitted noise levels which cross property lines and impact adjacent land uses. As pan of the Harveston Specific Plan EIR, a noise study was conducted to analyze potential noise impacts and introduce mitigation measures, including noise standards in the Development Code. FEBRUARY 2001 52 e:eoo~w~z~cosstsre~cr, voc NOISE ELEMENT Goal 3: Consider noise issues in the planning process. Discussion: The Harveston Noise Study evaluates potential noise conflicts from project buildout and based upon identified noise impacts proposes the use of site design and building design techniques, including the use of landscape setbacks or berrns, building orientation, and buffering of noise sensitive areas, as a means to minimize noise impacts and/or additional mitigation measures as appropriate. Policies 3.1 Establish standards for acceptable limits of noise for various lands use in the City. This policy is not applicable because it is a City directed policy. 3.2 Work with the County of Riverside and the City of Murrieta in minimizing or avoiding conflicts between land use and noise prior to project approvals. This policy is not applicable because it is a City directed policy. 3.3 Encourage the use of site design and building design techniques, including the use of landscape setbacks or berms, building orientation, and buffering of noise sensitive areas, as a means to minimize noise impacts. The Harveston Noise Study evaluates potential noise conflicts from project buildout and based upon identified noise impacts proposes the above techniques and/or additional mitigation measures as appropriate. 3.4 Evaluate potential noise conflicts for individual sites and projects. The Noise Study evaluates potential noise conflicts, and based upon identified noise impacts proposes mitigation measures as appropriate. 3.5 Require mitigation of all significant noise impacts as a condition of project approval. The Noise proposes mitigation measures, as necessary, which will be enforced as conditions of project approval. Goal 4: M~nimiT. e noise impacts from transportation noise sources. Discussion: To minimize noise impacts from transportation noise sources the Noise Study in the EIR evaluates the potential noise impacts and proposes mitigation measures as appropriate. Additionally, the proposed Specific Plan has been coordinating efforts with Caltrans and will comply with the requirements set forth by that agency. FEBRUARY 2001 53 p:eooo~s~o~z,~co,~str;~cr.~ NOISE ELEMENT Policies 4.1 Develop a program to construct barriers to mitigate sound levels where necessary or where feasible to ensure the peace and quiet of the community. The Noise Study as part of the E1R, evaluates the potential noise impacts and proposes mitigation measures as appropriate, in order to ensure peace and quiet within the community. 4.2 Ensure the effective enforcement of City, State, and Federal noise standards by all appropriate City Divisions. This policy is not applicable because it is a City directed policy. 4.3 Enforce the speed limit on arterials and local roads to reduce noise impacts from vehicles, particularly in residential areas. This policy is not applicable because it is a City directed policy. 4.4 Coordinate with Caltrans to ensure the inclusion of noise mitigation measures in the design of new highways projects or improvements to existing facilities including, interchange improvements along 1-15, widening of SR 79 South, SR 79 North and the proposed Date Street/I- 15 interchange. The proposed Specific Plan has been coordinating efforts with Caltrans and will comply with the requirements set forth by that agency 4.5 The City shall participate in the planning and impact assessment activities of the Airport Land Use Commission and other regional or state agencies relative to any proposed expansion of the ah-pon or change in flight patterns. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 54 COMMUNITY DESIGN ELEMENT AIR QUALITY ELEMENT Goal 1: Improvement of air quality through proper land use planning in Temecula. Discussion( The Harveston Specific Plan contains a balanced mix of residential and employment opportunities, therefore, reducing vehicle miles traveled. The circulation plan and the land use plan have been coordinated to minimize land use conflicts and prevent potential impacts. As part of the EIR document, an Air Quality analysis was conducted to evaluate the air pollutant emission~ and introduce mitigation measures, which will be enforced in order to reduce air pollution. ~Policies 1.1 Encourage new development that provides employment opportunities for residents of Temecula to improve the balance of jobs relative to housing. The Harvestan Specific Plan contains a balanced mix of residential and employment opportunities, therefore, reducing vehicle miles traveled. The Specific Plan area contains a service commercial area, and a Mixed Use Village Center, which also includes commercial and retail. 1.2 Encourage in-fill development near activity centers and along transportation corridors. This policy is not applicable because it is a City directed policy. 1.3 Minimize land use conflicts between emission sources and sensitive receptors. The circulation plan and the land use plan have been coordinated to minimized this conflict and prevent potential impacts. 1.4 Reduce air pollutant emissions by mitigating air quality impacts associated with development projects to the greatest extent feasible. As part of the EIR document, an Air Quality analysis was conducted to evaluate the air pollutant emissions and introduce mitigation measures, which will be enforced in order to reduce air pollution. Goal 2: Enhanced mobility to minimize air pollutant emissions. Discussion: The Harveston Specific Plan proposes a pedestrian-friendly environment where walking and biking are encouraged through provision of extensive walking trails/paseos and bike lanes that connect different planning areas and uses within the community. To have an effcient flow of traffic, the Specific Plan proposes a hierarchy of streets, in which arterials circumvent the FEBRUARY 2001 55 r:~ooo~sz~cosstrmvc~z~c COMMUNITY DESIGN ELEMENT community, collector roads proceed into the community, and internal neighborhood streets web throughout the neighborhoods. Policies 2.1 Implement transpo~ation demand management techniques to reduce motor vehicle trips, including walking, bicycling, ridesharing, local transit, staggered work schedules and telecommunications. The Harveston Specific Plan proposes a pedestrian-friendly environment where walking and biking are encouraged through provision of extensive walking trails/paseos and bike lanes that connect different planning areas and uses within the community. 2.2 Maintain an orderly flow of traffic and improve mobility through the use of transportation systems management techniques. A Traffic and Circulation Analysis was prepared as part of the EIR, which analyzed the future traffic flow and proposed mitigations to improve the flow. Additionally, the Specific Plan proposes a hierarchy of streets, in which arterials circumvent the community, collector roads proceed into the community, and internal neighborhood streets web throughout the neighborhoods. This system allows an efficient flow of traffic. 2.3 Pursue development of a pubhc transit system including local shuttle and bus routes, and bicycle and pedestrian trails that are linked to regional light rail. The Harceston Specific Plan will comply with the City of Temecula and the Riverside Transit Agency to facilitate provision of transit sereice. Coordination and correspondence with the Riverside Transit Agency was completed as part of the Harveston E1R preparation. All maps will be conditioned during the review stage to ensure compliance. 2.4 Promote alternatives to motorized transportation by establishing a convenient and efficient system of bicycle routes and pedestrian walkways. The proposed Specific Plan introduces a pedestrian and bicycle friendly environment where extensive systems of trails/paseos and bike lanes are provided for ease of access between different planning areas and uses. 2.5 Promote the use of ahemative clean fueled vehicles for personal and business use. This policy is not applicable because it is a City directed policy. 2.6 Encourage programs that reduce local traffic congestion at peak hours and during special events. A Traffic and Circulation Analysis was prepared which analyzes circulation in the Specific Plan area and its potential impact on a larger area during peak hours. The analysis proposes mitigations to reduce potential congestion. FEBRUARY 2001 56 COMMUNITY DESIGN ELEMENT Goal 3: Incorporate energy conservation practices and recycling to reduce emissions. Discussion: The Harveston Specific Plan requires future developments employ passive solar heating techniques in order to save energy consumption. Passive systems will include orienting buildings properly (£e., north/south lot orientation), planting trees to take advantage of the sun, ensuring adequate roof overhangs, properly insulating walls, and incorporating simple heat storage systems, including dual-paned windows. PoHcies 3.1 Encourage community-wide reductions in energy consumption through conservation. The Harveston Specific Plan encourages future developments employ passive solar heating techniques in order to save energy consumption. Passive systems will include orienting buildings properly (i.e., north/south lot orientation), planting trees to take advantage of the sun, ensuring adequate roof overhangs, properly insulating walls, and incorporating simple heat storage systems, including dual-paned windows. 3.2 Promote local recycling of wastes and the use of recycled materials. The Harveston Specific Plan will comply with City of Temecula curb--side recycling programs. Goal 4: Effective coordination of air quality improvement efforts in the Western Riverside area. This goal is not applicable because it is a City, regional, and state agency directed goal. Policies 4.1 Coordinate planning efforts with other local, regional and state agencies, including WRCOG, SCAQMD and SCAG, in theix efforts to improve regional air quality. This policy is not applicable because it is a City, regional, and state agency directed policy. 4.2 Encourage participation of local citizens, the business community and interested groups and individuals in air quality planning and implementation efforts. This policy is not applicable because it is a City, regional, and state agency directed policy. 4.3 Promote prograrr~, which educate the public about regional air quality issues. This policy is not applicable because it is a City, regional, and state agency directed palicy. FEBRUARY 2001 57 COMMUNITY DESIGN ELEMENT COMMUNITY DESIGN ELEMENT Goal 1: Enhancement of the City's image related to its regional and natural setting and its tourist orientation. Discussion: The proposed Harveston Specific Plan project includes plans for a 13. &acre Arroyo Park, which will recapture more naturalistic California landscape and provide a naturalistic setting for walking, hiking, and picnicking, therefore offering a different recreation experience for the residents of the community as well as the City. Additionally, the proposed project offers extensive ~ystems of trails and open space, which will be connected to different areas within the development. Another feature of the project, .which would be attractive for visitors to the community is the lake connected to other pans of the community through trails. Policies 1.1 Promote the development of a comprehensive system of trails and open space areas that connect schools, public recreation areas, residential areas, and commercial centers. The Harveston Specific Plan has incorporated plans for a paseo/trail system that will connect public recreation area, schools, residential areas and commercial areas. 1.2 Promote the development of a comprehensive system of trails and open space areas that connect schools, public recreation areas, residential areas, and commercial centers. This policy is not applicable because the Harveston Specific Plan area is not located within the Old Town area. 1.3 Develop design standards to enhance the visual character of commercial centers that are located adjacent to 1-15. The Harveston Specific Plan includes extensive design guidelines (see Section 10.0) and development standards (see Section 1LO) that will apply to the whale Specific Plan area (including the sen, ice commercial areas - adjacent to blS) and provide unifying elements to visually tie the community and create a distinct character. 1.4 Promote community identity by providing specially designed gateway signage at the primary entrances to the City. The Harveston Specific Plan proposes entry monumentation at the primary and secondary entrances to the community to promote an identity for the project area. (See Figures 10.2-10.5, Section 10.0, Design Guidelines). 1.5 Maintain and incorporate natural amenities such as: rock outcroppings, indigenous vegetation, streams and watercourses into development projects to protect the environment and provide natural landscaping, protect views, and to provide recreational opportunities in order to maintain the quality of life. FEBRUARY 2001 58 COMMUNITY DESIGN ELEMENT The proposed project includes plans for a lO. 5-acre Arroyo Park, which will recapture more naturalistic California landscape and provide a naturalistic setting for walking, hiking, and picnicking, therefore offering residents a different recreation experience. Goal 2: Design excellence in site planning, architecture, landscape architecture and signage in new development and modifications to existing development. Discussion: The Harveston Specific Plan introduces consistent and unifying design guidelines that would apply throughout the community to tie different elements into a design theme that would reflect the image of the community. The Specific Plan includes flexible design standards for the commercial development that are compatible with standards for other uses in the community, yet create an identity for the commercial development. Additionally, the Harveston Specific Plan proposes entry monumentation at the primary and secondary entrances to the community to promote an identity for the project are& Policies 2.1 Establish and consistently apply design standards and guidelines for residential and non- residential development. 2.2 The Harveston Specific Plan introduces consistent and unifying design guidelines (see Section JO.O) that would apply throughout the community to tie different elements into a design theme that would reflect the image of the community. Promote a cohesive and integrated pattern of development for large undeveloped areas, by requiring the preparation of Specific Plans. 2.3 This policy is not applicable because it is a City directed policy. Provide development standards to ensure higher quality design that is well integrated with the infrastructure and circulation systems. 2.4 The Harveston Specific Plan as well as the Planning Area Development Standards (see Section 11.0) is compatible and well integrated with other elements in the Specific Plan document. Formulate flexible design standards for commercial development that enhances the special identity and visual character of the commercial development. The Specific Plan includes flexible design standards for the commercial development that are compatible with standards for other uses in the community, yet create an identity for the commercial development. 2.5 Limit light/glare pollution through design standards for outdoor lighting and the use of low intensity lights. FEBRUARY 2001 59 COMMUNITY DESIGN ELEMENT 2.6 The Harveston Specific Plan is located within thirty (30) miles of Mount Palomar Observatory. In order to reduce any potential impacts from light and glare, outdoor lighting will be from low pressure sodium lamps that are oriented and shielded to prevent direct illumination above the horizontal plane passing through luminare. Enhance the individuality and special visual identity of commercial dis~icts and unified streetscape plans. The proposed plan includes guidelines for different uses within the community and streetscape plans that seek to enhance the individuality and identity of each district and yet unify the whole community into a distinct design theme. Goal 3: Preservation and neighborhoods. enhancement of the positive qualities of individual districts or Discussion: Although this goal is not applicable because it pertains to existing older communities, the Specific Plan seeks to create neighborhoods with distinct character, yet tying them with unifying architectural and landscape themes. The use of landscaping is an important element in design of the Harveston Specific Plan. Landscape features from passive turf areas to group shade arbors and thematic and buffer landscape treatments all play important roles in creating a visually interesting development and reduce conflicts between different land uses. The Mixed Use Village Center in the Specific Plan area creates a pedestrian.friendly environment where City residents can enjoy amenities such as plazas, gardens, gathering places, benches, and much more to hove a recreational as well as social experience. Policies 3.1 Improve the appearance of neighborhood areas and the "edge" between neighborhoods through, landscaping, location of open space buffers, and special landscape features. The Harveston Specific Plan provides for special landscaping techniques as buffers between different planning areas and uses. 3.2 Preserve the scale and character of residential development by creating appropriate transitions between lower density, rural areas, and higher density development. The different land uses within the Specific Plan are arranged in a manner that creates transitions between different densities and different uses. Special design elements and landscaping achieves this transition~ 3.3 Encourage the use of creative landscape design to create visual interest and reduce conflicts between different land uses. The use of landscaping is an important element in design of the Harveston Specific Plan. Landscape features from passive turf areas to group shade arbors and thematic and buffer FEBRUARY 2001 60 t:eooo~s~oz~coss~rr~c~t~oc COMMUNITY DESIGN ELEMENT 3.4 landscape treatments all play important roles in creating a visually interesting development and reduce conflicts between different land uses. Improve the pedestrian orientation, convenience and safety of commercial centers through the provision of pedestrian amenities such as benches, plaza areas, information kiosks and other street furniture, and through careful site planning and architectural design. The Mixed Use Village Center in the Specific Plan area creates a pedestrian friendly environment where pedestrians can enjoy amenities such as plazas, gardens, gathering places, benches, and much more to have a recreational as well as social experience. Goal 4: A streetscape system that provides cohesiveness and enhances community image. Discussion: The sidewalks and paseos included in the proposed plan incorporate unique design features, landscaping, and amenities. Many of the proposed paseos will meander through the adjacent landscape; generous landscape parkways between roads and sidewalks create a positive image and provides identity for the community. Policies 4.1 Promote the development of a continuous sidewalk and txail system throughout the City. The Harveston Specific Plan includes an extensive system of trails/paseos, bike lanes, and sidewalks that circulate throughout the development and connect to city wide trail systems off- site. 4.2 Formulate a comprehensive streetscape program for the major streets in the City, including unified landscaping, lighting, paving patterns, and other public improvements. 4.3 This policy is not applicable because it is a City directed policy. Encourage variety in the design of sidewalks and trails, with respect to alignment and surface materials, to provide a convenient and enjoyable experience for the users. The sidewalks and paseos included in the proposed plan incorporate unique design features, landscaping, and amenities offering users a different recreational experience. Many of the proposed paseos will meander through the adjacent landscape. 4.4 Establish a city-wide street tree and median/slope planting program. Section 10.0, Design Guidelines, of the Harveston Specific Plan requires that a detailed landscape program and guidelines for roadways and slopes be prepared by a qualified landscape architect, subject to review by City staff. The landscaping guidelines include a special street tree and median/slope planting program. The City (TCSD) will maintain all the landscaped medians and LDZ's adjacent to single family residential, on roadways with a 66-foot ROW of larger. The applicant or master developer will be responsible for maintenance of all slopes planting areas until such time as these operations are the responsibility of other parties. FEBRUARY 2001 61 p:~oo~~j~o~arco~strr~czvoc COMMUNITY DESIGN ELEMENT 4.5 4.6 4.7 4.8 Where feasible, requixe the provision of landscaped parkways between roads and sidewalks. The roadway sections contained in Section 10.0, Design Guidelines, of the Specific Plan depict generous landscaped parkways between roads and sidewalks. Arterial roads should be designed as landscaped parkways that serve as unifying urban design elements. The Design Guidelines (Section 10.0) of the Specific Plan include a unifying urban design theme for the arterial roads. Encourage the use of drought tolerant landscape materials that are easy to maintain and are approved by the City's Parks and Recreation Department. The plant material selection for common landscape areas for Harveston is presented in a plant palette that is broken down into different types of uses within the Specific Plan area (see Section I0.0, Design Guidelines). The plant material guidelines provide flexibility and diversity in plant material selection, while maintaining a limited palette in order to give greater unity and thematic identity to the community. The plant palette includes drought tolerant materials and will be subject to approval by the City's Community Services Department. Establish and enforce weed abatement programs on undeveloped properties and along major arterials. An effort to enforce weed abatement programs along major arterials will be part of the maintenance program.for roadways identified in Section I O. O, Design Guidelines, of the Specific Plan. Goal 5: Protection of public views of significant natural features. Discussion: The Harveston Specific Plan will not impact public views of the surrounding significant natural features. The project site does not include any natural features that would be impacted by the development. Policies 5.1 Work with the County of Riverside to protect the sun'ounding hillside areas. This policy is not applicable because it is a City directed policy. 5.2 Promote the development of turn-outs on scenic roads. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 62 p:eooo~m~oz~tcoNstsrts~ooc COMMUNITY DESIGN ELEMENT 5.3 Require the revegetation and maintenance of graded slope areas. The Harveston Specific Plan (see Section 8.0, Grading Plan and 9.0, Landscaping) requires the revegetation and maintenance of graded slope areas. Goal 6: Maintenance and enhancement of the City's public spaces and resources. Discussion: The Harveston Specific Plan promotes public spaces within the development. In areas of high pedestrian activity (Le., the Mixed Use Village Center) provisions for street furniture and shade trees are included. Outdoor sitting area and plazas are part of the Mixed Use Village Center. In addition, in paseos and passive recreation parks, trees and benches are provided for the convenience and comfort of the users. Policies 6.1 Provide for street furniture in areas with high pedestrian activity and provide for shade trees in shopping areas. The Design Guidelines of the Specific Plan provides detailed description of roadways, including street furniture and other elements. In areas of high pedestrian activity (i.e., the Mixed Use Village Center) provisions for street furniture and shade trees are included. In addition, in paseos and passive recreation parks, trees and benches are provided for the convenience and comfort of the users. 6.2 Establish improvement plans for ~he City's public spaces and include these plans in the Capital Improvement Program. This policy is not applicable because it is a City directed policy. 6.3 Assure that operating and maintenance costs are adequately provided for public facilities. Section 12.0, Implementation and Administration, of the Specific Plan addresses costs of operating and maintaining public facilities. Adztitionally, Development Impact Fees, to be paid by the project, will provide for capital improvements. Goal 7: Community gathering areas, which provide for the social, civic, cultural and recreational needs of the community. Discussion: The Harveston Specific Plan proposes gathering areas and plazas within the commercial developments (Mixed Use Village Center) that will also accommodate social events. Additionally, the Village Green creates a public gathering place, which will encourage social interaction and community activities, such as concerts or farmers markets. Also, mini parks in FEBRUARY 2001 63 ~:eooo~v~a~constsr~vcr. ooc COMMUNITY DESIGN ELEMENT addition to paseos and passive recreational parks and a clubhouse facility are provided throughout the development where residents will gather for social and recreational activities. PoHcies 7.1 Encourage the development of public spaces and plazas within commercial developments that can accommodate cultural and social events and function as community gathering areas. The Harveston Specific Plan proposes gathering areas and plazas within the commercial developments (Mixed Use Village Center) that will accommodate social events. Additionally, the Village Green creates a public gathering place, which will encourage social interaction and community activities, such as concerts or farmers markets. 7.2 Encourage the development of multi-purpose facilities within commercial developments that may be leased for a variety of public and private events. The Harveston Specific Plan proposes multi-purpose facilities within the commercial developments (Mixed Use Village Center) that will accommodate public and private events. The Village Club will include facilities that can be utilized for events such as weddings. Additionally, uses within the Mixed Use Village Center such as church can accommodate public and private events. 7.3 Encourage the development of a range of uses within commercial developments that provide for day and evening activities. Day and evening activities are permitted and encouraged within the Mixed Use Village Center and Service Commercial areas. 7.4 Encourage development of common areas and facilities within residential developments to provide gathering areas for social and recreational activities. Mini park~ in addition to paseos and passive recreational parks and a clubhouse facility are provided throughout the development where residents will gather for social and recreational activities. 7.5 Encourage the development of employee lunch areas within the indusuial/business park facilities. Some industriaL/business park uses are permitted within Planning Are No. 12 of the Specific Plan. While the Specific Plan does not expressly require employee lunch areas within the industrial/business park areas, the City's Development Code does. Section 12.] of the Specific Plan states: "any development regulation and building requirement not addressed in the Specific Plan shall be subject to the City's adopted regulations." It is anticipated that these employee lunch areas will be provided if these uses are developed. 7.6 Promote the provision of cultural facilities within the community including: art museums, theaters, performing art centers, outdoor amphitheaters, and special cultural exhibitions. The Harveston Specific Plan includes a Village Club where above activities are allowed and encouraged. Additionally, outdoor activities such as exhibitions, outdoor amphitheaters, and public gathering are also permitted in open space areas adjacent to the Mixed Use Village Center. FEBRUARY 200J 64 ~,~oo~n~oz,at, coss~rr~cr, ooc ECONOMIC DEVELOPMENT ELEMENT ECONOMIC DEVELOPMENT ELEMENT Goal 1: Development of a strong base of clean manufacturing activities which employs a skilled labor force and can be successfully integrated into Temecula's community character. Some clean manufacturing uses are allowed in the Planning Area No. 12 of the Specific Plan. This may contribute to the existing strong base of clean manufacturing activities which employs a skilled labor force. This type of development will also be held to the standards required of other clean manufacturing uses, thereby being successfully integrated into Temecula's community character. Goal 2: Diversification of the economic base to include a range of manufacturing, retail and service activities. Discussion: The Harveston Specific Plan has been designed taking into account the City of Temecula' s socio- economic patterns, and therefore, will adapt to the City's both short and long-term economic conditions. The proposed project includes plans for retail, service commercial, and other activities that provides a broad selection of high-quality goods and services for residents, workers and tourists. Policies 2.1 Provide for industrial land uses, which facilitate a variety of user types, including manufacturing space, storage and distribution, back-office space, and research and development space. This policy is not applicable because the Harveston Specific Plan does not include industrial and manufacturing uses. 2.2 Plan for land use and development patterns that allow succession of use and will adapt to Temecula's economic conditions. The Harveston Specific Plan has been designed taking into account the City of Temecula' s socio- economic patlerns, and therefore, will adapt to the City's both short and long-term economic conditions. 2.3 Promote development of properly located and well designed commercial centers to meet the diverse service needs of the City. The Harveston Specific Plan includes plans for well designed commercial centers that will meet the many service needs of the City. The appropriate location of the Service Commercial supports the above policy. 2.4 Promote retail and other support activities that provide a broader selection of high-quality goods and services for residents, workers and tourists, including apparel, general merchandise, home furnishings and appliances. FEBRUARY 2001 65 ECONOMIC DEVELOPMENT ELEMENT 2.5 The proposed project includes plans for retail and other activities that provides a broad selection of high-quality goods and services for residents, workers and tourists. Use redevelopment powers and opportunities to enhance development opportunities. This policy is not applicable because it is a City directed policy. Goal 3: Maintain an economic base to provide a sound fiscal foundation for the City as well as quality community facilities and high service levels. Discussion: The Hameston Specific Plan proposes a broad array of uses ranging from neighborhood retail commercial to service commercial, residential, recreational and school. The uses are phased in a manner to balance revenue generating land uses with uses that have negativefiscal impacts. The commercial activities provided for within the Specific Plan area will greatly help in providing fiscal balance, local tax, and employment opportunities. Policies 3.1 Encourage a pattern of development that balances revenue generating land uses in phase with other uses that have negative fiscal impacts. The Harveston Specific Plan proposes a broad array of uses ranging from neighborhood retail commercial to service commercial, residential, recreational and school. The uses are phased in a manner to balance revenue generating land uses with uses that have negativefiscal impacts. 3.2 Encourage the g~owth or relocation of industries that generate local tax and employment advantages. The commercial activities provided for within the Specific Plan area will greatly help in providing fiscal balance, local tax, and employment opportunities. 3.3 Evaluate fiscal impacts of new development on an ongoing basis and provide appropriate mitigation sU-ategies. This policy is not applicable because it is a City directed policy. 3.4 Take advantage of Temecula's regional capture of taxable sales and continue to establish Temecula as retailing center along the Interstate 15 corridor. The Harveston Specific Plan contains 112.4 acres of service commercial uses, which will help continue to establish Temecula as a retailing center along the Interstate ]5 corridor. FEBRUARY 2001 66 ECONOMIC DEVELOPMENT ELEMENT Goal 4: Establishment of a diverse education and training and job placement system, which will develop and maintain a high quality work force in Temecula. Discussion: The Harveston Specific Plan proposes learning institutions, such as university extension, a junior college, and learning centers (.for elementary through high school) within the Mixed Use Village Center. Policies 4.1 Support economic development goals through a range of education and training activities. The Harveston Specific Plan supports educational programs and activities that would benefit the residents locally and throughout the City of Temecula. The Mixed Use Village Center contained in the Specific Plan permitted uses that would allow for different education and training activities and programs. 4.2 Establish a proactive, periodic dialogue early in the planning process between the City and educational institutions, including school diswicts and community colleges, on issues related to the phasing of development, service standards and demands. During the development and design of the Harveston Specific Plan, the project's planners have continually been in contact with educational institutions on issues such as phasing of development, service standards and demands. The project's impacts on these institutions have been analyzed in the Environmental Impact Report. The project has been particularly in contact with the School District on the issue of locating a 12.0-acre elementary school within the project site. 4.3 Explore the potential for a comprehensive extension center through UC Riverside and/or the California State University system The Harveston Specific Plan proposes learning institutions, such as university extension, a junior college, and learning centers (for elementary through high school) within the Mixed Use Village Center. Goal 5: Promote the advantages to businesses of locating in Temecula, including cost advantages, amenities, housing, comrntmity activities and civic services. Discussion: The Har~eston Specific Plan includes many incentives for businesses locating in Temecula and in the Harveston community. The proposed project provides an array of housing opportunities with varying costs, sizes, and densities, which provide opportunities to different income levels. In addition, it offers diverse amenities, recreation facilities, and open spaces throughout the community, which will appeal to many businesses. FEBRUARY 2001 67 ..¸2 ECONOMIC DEVELOPMENT ELEMENT 5.1 5.2 5.3 5.4 Develop and maintain a marketing program to publicize the virtues of relocating to Temecula. This policy is not applicable because it is a City directed policy. Monitor the economic conditions in Temecula in comparison to other locations in California and throughout the nation to determine relative advantages. This policy is not applicable because it is a City directed policy. Monitor the supply of housing in relation to the supply of jobs in terms of balancing area-wide jobs, households, worker earnings and housing expenses. This policy is not applicable because it is a City directed policy. Monitor existing businesses in Temecula and identify the elements of a business retention program. This policy is not applicable because it is a City directed policy. Goal 6: Develop Temecula as a eomprehensive, recognizable tourist destination, with a range of attractions throughout and beyond the sphere of influence. This goal is not applicable because it is a City directed goal. Policies 6.1 Encourage and enhance cooperative efforts with the wine-making induslxy in the Temecula Valley to promote Temecula as a destination resort. This policy is not applicable because it is a City directed policy. 6.2 Identify commercial recreation, convention and resort activities - including golf-oriented resorts - that can take advantage of Temecula's chaxacter and climate, while complementing wine- making activities. This policy is not applicable because it is a City directed policy. 6.3 Revitalize and enhance Old Town to expand its role in local tourism and to improve its attractiveness, accessibility, and economic vitality. This policy is not applicable because it is a City directed policy. 6.4 Enhance the City's image through development of cultural facilities, including performance arts, museums. This policy is not applicable because it is a City directed policy. FEBRUARY 2001 68 EXHIBIT B SPECIFIC PLAN 13 (Specific Plan 13 is on file in the Official Records of the City Clerk and incorporated herein by this reference as though set forth in full.) R:~S P~Harveston SPiCily Council\SP Reso. DOC 5 EXHIBIT C CONDITIONS OF APPROVAL FOR SPECIFIC PLAN 13 R:\S P~Harveston SPxCity Council\SP Reso. DOC 6 EXHIBIT C CITY OF TEMECULA CONDITIONS OF APPROVAL Planning Application No. PA99-0418 (Specific Plan) - Harveston Specific Plan No. 13 Project Description: A Specific Plan consisting of approximately 550 acres that proposes 1,921 residential units with a variety of residential product types and lot sizes; a 12 acre elementary school site; a 7 acre lake with a 6.9 acre lake park; a 16.5 acre community park; a 13.8 acre arroyo open space park; a Mixed-Use Overlay zone (Village Green) which may be as large as 13 acres; and 112.5 acres of Service Commercial land adjacent to Interstate 15. Assessor's Parcel Nos. 910-261-001, 910-261-002, 910-110-013, 910-110-015, 910-110- 020, 910-110-021, 910-110-027, 910-110-076, 910-100-007, 910- 100-008, 910-060-009, 910-120-008, 911-630-001, 911-630-002, 911-630-003, 911-540-001, 911-840-002, 911-180-002, 911-180- 003, 911-180-004, 911-180-008, 911-180-009, 911-180-015, 911 - 180-023 AND 911-180-028. Approval Date: August14,2001 PLANNING DIVISION Within Forty-Eight (48) Hours of the Approval of this Project The applicant shall deliver to the Community Development Department - Planning Division a cashier's check or money order made payable to the County Clerk in the amount of Nine Hundred Twenty-Eight Dollars ($928.00) which includes the Eight Hundred and Fifty Dollar ($850.00) fee, required by Fish and Game Code Section 711.4(d)(3) plus the Seventy-Eight Dollars ($78.00) County administrative fee, to enable the City to file the Notice of Determination for the Environmental Impact Report required under Public Resources Code Section 21151 and California Code of Regulations Section 15904. If within said forty-eight (48) hour period the Applicant has not delivered to the Community Development Department - Planning Division the check as required above, the approval for the project granted shall be void by reason of failure of condition (Fish and Game Code Section 711.4(¢)). General Requirements The permittee/applicant shall indemnify, defend with counsel of City's own election, and hold harmless, the City and any agency or instrumentality thereof, and/or any of its officers, employees, and agents from any and all claims, actions, or proceedings against the City, or any agency or instrumentality thereof, or any of its officers, employees, and agents, to attack, set aside, void, annul, or seek monetary damages resulting from an approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board or legislative body including actions approved by the voters of the City, concerning the Planning Application which action is brought within the appropriate statute of limitations period and Public Resources Code, Division 13, Chapter 4 (Section 21000 et seq., including but not by the way of limitations Section 21152 and 21167). The City shall promptly notify the permittee/applicant of any claim, action, or proceeding brought forth within this time period. R:\S P\Harveston SP\PC Docs\COA-SP.doc The City shall estimate the cost of the defense of the action and applicant shall deposit said amount with the City. City may require additional deposits to cover anticipated costs. City shall refund, without interest, any unused podions of the deposit once the litigation is finally concluded. Should the City fail to either promptly notify or cooperate fully, permittee/applicant shall not, thereafter be responsible to indemnify, defend, protect, or hold harmless the City, any agency or instrumentality thereof, or any of its officers, employees, or agents. All development within this site shall be in accordance with the requirements of all City ordinances, except as expressly modified herein or by development agreement, and State laws, and shall conform with the approved Specific Plan. Regulations or procedures not covered by the Specific Plan or appurtenant documents shall be subject to the City ordinances in effect at the time entitlement is required. Approval of this Specific Plan is contingent upon and shall not become effective nor shall it vest until a General Plan Amendment (GPA) and Zone Change are approved by the City Council, and an Environmental Impact Report (EIR) or any other environmental review under the provisions of the California Environmental Quality Act (CEQA) are certified by the City Council. Nothing in this approval, as memorialized in this Resolution, shall require or be interpreted to require the City of Temecula to fund or cause to be funded the development of any facilities or improvements, including but not limited to infrastructure improvements, which are necessary or convenient to cause, allow or fudher the development of the subject Specific Plan, except as may be expressly agreed to by the City of Temecula." Notwithstanding any of the conditions contained herein, the Developer and the City may enter into a development agreement, pursuant to Government Code Section 65864 through 65869.5 or other agreement(s) requiring the Developer to: 1) advance the funding or construction of public improvements; 2) redefine the scope of any public improvement; 3) acquire or fund the acquisition of land for public purposes; and 4) waive any right to reimbursement for facilities or the dedication of land. Further, notwithstanding any of the conditions contained herein, Developer may seek an agreement for reimbursement for any improvements or facilities that qualify for reimbursement at such time as the City of Temecula adopts an ordinance-for-suchq'eimbursement pursuant to and-consistentwvlth California Government Code Sections 66485 through 66489, inclusive, and further shall waive the same in the event of agreements, consistent with the foregoing, that require or include any or all of the terms set forth immediately above. Once the Project Study Report (PSR) conducted by Caltrans is completed, the road alignments affecting the individual planning areas (i.e. Ynez Road and Cherry/Date Street) may be altered or modified to implement the PSR. The alternation or modification of the roads will not require a Specific Plan Amendment; however, all applicable text, sections, figures and exhibits in the Specific Plan shall be modified to reflect the actual roadway alignments as determined in the PSR subject to the approval of the Director of Planning and Public Works Director. Within thirty (30) days of approval of the Specific Plan, the applicant shall submit a final copy reflecting all the changes necessary to make the document consistent with City Council's final action. The final Specific Plan shall be reviewed for consistency and approved by the Planning Director. The applicant shall comply with all applicable mitigation measures contained in the adopted City of Temecula General Plan and the Harveston Environmental Impact Report. R:~S P~Harveston SP\PC Docs\COA-SP.doc 2 10. 11. 12. 13. A detailed noise mitigation analysis shall be performed, at the final map stage (for individual planning areas) for all future project noise-sensitive uses potentially exposed to noise levels in excess of 60 dB CNEL to verify that planned noise protection will meet City of Temecula standards. A. Exterior recreational areas shall be protected to achieve noise levels of less than 65 dB CNEL. B. Interior living areas shall be protected to achieve noise levels of less than 45 dB CNEL. Substantial perimeter walls separating rear yards from the roadway right-of-way along Date Street area are anticipated to be necessary. Precise wall geometrics shall be determined once exact setbacks and building pad grades are established. Moderately upgrading window treatments shall be necessary along Date Street in upstairs bedrooms closest to the roadway. Minor acoustical upgrades shall be needed along Margarita or Ynez beyond simply closing windows to shut out roadway noise. The building code requires that supplemental fresh air ventilation be provided in rooms where window closure for traffic noise protection is necessary. A detailed noise attenuation evaluation shall be conducted in a supplemental acoustical study to be submitted when the tract map is filed with the appropriate agency. During staff review of any tentative map, an updated geotechnical/geologic report shall be prepared to include any necessary revisions to earthwork, foundation, design, and construction recommendations. On residential streets that generate less than 250 vehicular trips, the road (curb to curb) shall be thirty-six feet (36') with a parkway separating the sidewalk from the curb. During the development plan review, major employer (more than 250 employees) who locate their businesses within the project shall prepare Transportation Demand Management (TDM) plans in accordance with the Riverside County Transportation Commission/Western Riverside Council of Governments (RCCTC/WRCOG) guidelines. 14. Prior to the approval of a development plan or tentative map for individual planning areas, the developer and City staff will review plans, especially for multi-family housing areas, commercial uses, and parks for the provision of appropriate, necessary, and adequate pedestrian and bicycle facilities. 15. Prior to the approval of a development plan, City staff will review plans, especially for commercial and park uses, for the provision of appropriate, necessary and adequate pedestrian and bicycle facilities. 16. Prior to the approval of a development plan, City staff will review plans, for all service commercial uses and shall encourage the provision of park and ride facilities. 17. Prior to approval of any development projects, appropriate clearances, conditions and approvals from ail agencies with jurisdiction on project review shall be obtained by the developer. These agencies shall be determined by the Director of Planning and the City Engineer. 18. The developer or the developer's successor-in-interest shall be responsible for maintaining the undeveloped portion of the site including weed abatement and litter removal. R:\S P\Harveston SP\PC Docs\COA-SP,doc 3 19. Prior to approval of any development projects, the developer shall investigate the feasibility of a reclaimed water system, to irrigate landscaping within the roadway medians, parkways, drainage channel, schools, the community park, the paseo park, neighborhood parks, and other common open space areas. The developer shall provide evidence that compliance with this condition is in accordance with Senate Bill 2095. 20. The Master Developer shall provide the prospective home buyers a notice that the 16.5-acre community park will include sports field lighting for evening use. Proof of this notification shall be provided to the Planning Department and included in the Master Covenants, Codes and Restrictions (CC&R's) prior to the recordation of the first Final Map. 21. All lighting shall be reviewed by the City to assure compliance with the Ordinance No. 655. 22. The lake park, but not the sudace of the lake, shall be open to the public. 23. The approval granted by this Resolution shall become effective upon the Effective Date of the Development Agreement, as the term Effective Date is defined in the Development Agreement adopted concurrently with this Resolution. In addition to the foregoing, in the event a Development Agreement is entered into that supercedes or alters these conditions of approval and the applicant causes a default or terminates by conduct the Development Agreement, then the City shall immediately consider the revocation of the approval granted by this Resolution. Prior to the Issuance of Grading Permits 24. The applicant shall comply with the provisions of Chapter 8.24 of the Temecula Municipal Code (Habitat Conservation) by paying the appropriate fee set forth in that ordinance or by providing documented evidence that the fees have already been paid. 25. The developer shall provide a Water Quality Management Plan showing conformance to all NPDES requirements (enacted by the Environmental Protection Agency (EPA) and Regional Water Quality Control Board, San Diego Region) for review and approval by the City Engineer. 26. The developer shall provide proof to the Department of Public Works and Planning that the conditions the 404 and 1603 permits pertaining to the Arroyo Park restoration have been bonded for and shall be implemented consistent with the timing requirements of the permits. 27. The applicant shall sign both copies of the final conditions of approval that will be provided by the Community Development Department - Planning Division staff, and return one signed set to the Planning Department for their files. Prior to the Issuance of Building Permits 28. The developer shall provide proof to the City's Traffic Engineer that the project has contributed its fair-share towards regional traffic improvement systems (i.e., traffic impact fees) for the area through a Development Agreement or other agreement. This shall include efforts to synchronize traffic lights on streets impacted by project development. 29. Prior to the approval of a development plan or tentative map, staff shall forward the proposed application to the Riverside County Transit Agency (RTA) for review and comment regarding bus turnouts, shelters, etc. Transit-oriented facilities and design features will be incorporated into the design of the project as appropriate, to the satisfaction of the City and RTA. R:\S P~Harveston SP\PC Docs\COA-SP.doc 30. The developer shall provide proof that energy saving features will be installed in project homes as required by the California Building Code. Features may include: solar or Iow- emission water heaters, solar roof tiles, energy efficient appliances, dual paned windows, Iow pressure sodium parking lights, etc. Additionally, residential products constructed bythe home building division of Lennar shall incorporate "Comfort Wise" energy-efficiency features. 31. Landscaping design and water conservation devices that conform to the California Model Water Conservation Ordinance shall be required, such as Iow flow toilets, faucets and showerheads, shade tree selection and placement. PUBLIC WORKS DEPARTMENT Unless otherwise noted, all conditions shall be completed by the Developer at no cost to any Government Agency. It is understood that the Developer correctly shows on the tentative site plan all existing and proposed easements, traveled ways, improvement constraints and drainage courses, and their omission will subject the project to further review and may require revision. GENERAL CONDITIONS 32. All utility systems such as electric, including those which provide direct service to the project site and/or currently exist along public rights-of-ways adjacent to the site (except electrical lines rated 33 kv or greater), gas, telephone, water, sewer, and cable TV shall be placed underground, with easements provided as required, and designed and constructed in accordance with City Codes and the utility provider. 33. Prior to the issuance of any grading permit, as deemed necessary by the Department of Public Works, the Developer shall consult with the State of California Department of Fish and Game, U.S. Army Corps of Engineers, and U.S. Fish and Wildlife Service to determine if permits or approvals are necessary from such agencies for any action contemplated by this proposal. Such consultation shall be in writing, and copies of said correspondence, including responses from agencies, shall be submitted to the City. Where appropriate, the terms, conditions, and recommendations of the noted agencies shall be incorporated as Conditions of Approval into the areas of development. 34. All easements and/or right-of-way dedications shall be offered for dedication to the public or other appropriate agency and shall continue in force until the City accepts or abandons such offers. A~I dedications shall be free from all encumbrances as approved bythe Department of Public Works. 35. Landscaping and permanent irrigation facilities shall be installed with all street improvements on and off-site grading. Perimeter walls, where required, shall be treated with graffiti- resistant coating and shall be installed adjacent to street improvements within each phase. 36. A phasing plan addressing the schedule of necessary infrastructure requirements shall be approved by the Department of Public Works and the Planning Director prior to approval of any subsequent application. 37. The Developer shall pay to the City the Public Facilities Development Impact Fee as required by, and in accordance with, Chapter 15.06 of the Temecula Municipal Code and all Resolutions implementing Chapter 15.06, unless otherwise provided for by a written agreement between the City and the Developer. 38. The Developer shall make a good faith effort to acquire the required real property interests necessary to carry out these conditions, and if he or she should fail to do so, the Developer R:\S P\Harveston SP\PC Docs\OOA-SP,doc 5 shall, prior to submittal of the Final Map for recordation, enter into an agreement to complete the improvements pursuant to the Subdivision Map Act, Section 66462 and Section 66462.5. Such agreement shall provide for payment by the Developer of all costs incurred by the City to acquire the real property interests required in connection with the subdivision. Security of a portion of these costs shall be in the form of a cash deposit in the amount given in an appraisal report obtained by the Developer, at the Developer's cost. The appraiser shall have been approved by the City prior to commencement of the appraisal. CIRCULATION 39. Prior to Final Map recordation, the Developer is responsible to bond for or construct the traffic signals at the project's accesses, as required, including the associated street improvements, based on traffic signal warrants analysis relative to subsequent tentative maps and/or development applications. 40. Adequate primary and secondary access shall be provided for each phase of development as approved by the Department of Public Works. Access to office and commercial areas shall be reviewed by the Department of Public Works at the time of submittal of individual tentative maps and/or development applications. Additional rights-of-way at entries to the aforementioned sites may be required to provide for turning lanes as directed by the Department of Public Works. 41. The exact location and number of access points shall be subject to review and approval by the Department of Public Works upon future tentative map and/or development plan approvals. 42. All street sections shall correspond with Typical Roadway Cross Sections and requirements of the Circulation Element of City's General Plan, City ordinances and standards or as approved with the Harveston Specific Plan. 43. All intersection intervals shall comply with City standards and requirements. Th~Developer_shalLprovide bus bays.andshelters within~he_SpecificPdan. J_o~ number of bus bays shall be subject to approval of the City and Riverside Transportation Agency (PTA). Additional rights-of-way dedications associated with bus bays shall be provided by the Developer. 45. Necessary improvements have been/will be conditioned based on the project traffic studies and the conceptual phasing plan shown on Section 12 of the Specific Plan. Any substantive rephasing of the development must be approved by the Planning and Public Works Director through a rephasing application. Prior to the issuance of occupancy permits within any phase, all on and offsite improvements as referred to in the Traffic Reports and subsequent addenda along with additional requirements set herein, or as set by conditions on individual tracts, must be constructed and/or bonded as required by the Department of Public Works. 46. Ensuing Traffic Reports, analyzing traffic impacts associated with subsequent development stages of the Specific Plan, shall be submitted to identify implementation and timing of the necessary improvements to mitigate cumulative traffic impacts. TRAFFIC MITIGATION MONITORING PROGRAM 47. The Traffic Mitigation Monitoring Program proposes that a traffic study be approved prior to the issuance of first occupancy permit in each additional phases of the development. The R:\S P\Ha~veston SP\PC Docs\COA-SP.doc 6 intent of the Traffic Mitigation Monitoring Program is not to re-define mitigation responsibility, but rather to assist in the refinement of area improvement needs and the timing of the improvements. The traffic study would: 1 ) document ambient traffic volumes conditions; 2) estimate trip generation for the particular development phase; and 3) assess traffic conditions with the traffic added by the particular development phase. The exact study area to be addressed in each of the traffic studies should be defined through discussions with the City Traffic Engineer. In general the study area should include the immediate access intersections and roadways, which would serve the new development phase and those critical off-site intersections and roadways that will provide primary access to the new development. Critical intersections / roadways are defined as those facilities that are experiencing high levels of peak period traffic congestion (at the time the traffic study is to be performed). The traffic study findings would assist the City in proactively planning for area roadway improvements. DRAINAGE 48. Drainage and flood control facilities shall be provided in accordance with the requirements of the City and/or Riverside County Flood Control and Water Conservation District (RCFC&WCD). 49. Prior to approval of any subsequent development applications, the Developer shall submit the master drainage plan to the City and RCFC&WCD' to review the adequacy of the proposed and existing downstream drainage facilities. 50. Drainage facilities within each phase shall be constructed immediately after the completion of the site grading and prior to or concurrently with the initial site development within that phase. 51. All drainage facilities shall be designed to convey 100-year storm flows, subject to the approval of the Department of Public Works and RCFC&WCD, as applicable. 52. The Developer shall construct the proposed on and oftsite drainage facility improvements and the interim detention basin provision as recommended in the Specific Plan and Dr-~h'hag~ Study d0c~mehtsand/o~'§-dir~t~b~-thb D~partmbnt-6f~:~0b3i~s-and RCFC&WCD, as applicable. 53. As required by the Department of Public Works, additional Hydrology and Hydraulic Reports shall be submitted with subsequent tentative maps and/or development applications to study the drainage impacts and analyze necessary measures to mitigate the runoff created as part of the development of this project. 54. The Developer shall accept and properly dispose of all off-site drainage flowing onto or through the site. 55. The Developer shall protect downstream properties from damages caused by alteration of the drainage patterns; i.e., concentration or diversion of flow. Protection shall be provided by constructing adequate drainage facilities, including enlarging existing facilities or by securing drainage easements. WATER AND SEWER 56. Water and sewer facilities shall be installed in accordance with the requirements and specifications of the City, Rancho California Water District (RCWD), and Eastern Municipal R:\S P\Harveston SP\PC Docs\COA-SP.doc 7 57. 58. Water District (EMWD). Such requirements shall be applied at the subdivision or plot plan stages of the development. Prior to the approval of subsequent development applications, the Developer shall submit the master water plan to RCWD to check for adequacy of the proposed water facilities. The Developer shall obtain written approval for the water system from RCWD. Prior to the approval of subsequent development applications, the Developer shall submit the master sewer plan to EMWD to check for adequacy of the proposed sewer facilities. The Developer shall obtain written approval for the sewer system from EMWD. GRADING 59. No grading shall be permitted for any development area prior to tentative map or plot plan approval and issuance of grading permits for the specific area of development. 60. Grading plans and operations shall be in accordance with the Uniform Building Code, City Grading Standards, the, recommendations contained in the Geotechnical Report, or any subsequent reports prepared for the project, the conditions of the grading permit, and accepted grading construction practices and the recommendations and standards specified in the Specific Plan and Environmental Impact Report (EIR) document. 61. Prior to issuance of any grading permit, erosion control plans shall be prepared in conformance with applicable City Standards and subject to approval by the Department of Public Works. The Developer shall post security and enter into an agreement guaranteeing the grading and erosion control improvements. 62. The Developer shall comply with the requirements of the National Pollutant Discharge Elimination System (NPDES) permit regulated by the State Water Resources Control Board, and the Storm Water Pollution Prevention Plan (SWPPP) implemented by the San Diego Regional Water Quality Control Board. 63. Each subsequent application for a phase of development shall include a conceptual grading i~la~ndicate at a rn~himum: a) Preliminary quantity estimates for grading. b) Techniques and methods which will be used to prevent erosion and sedimentation during and after the grading process in compliance with the City Standards and NPDES requirements. c) Preliminary pad and roadway elevations. d) Designation of the borrow or stockpile site location for import/export material. e) Approximate time frames for development including the identification of areas which will be graded during the rainy months. f) Hydrology and hydraulic concerns and mitigations. 64. Major grading activities shall be scheduled during the dry season wherever possible, or as otherwise approved by the Department of Public Works. 65. Soils stabilization, which may include revegetation of graded areas, shall occur within 30 days of completion of grading activities as directed by the Department of Public Works. 66. The site shall be watered during grading operations to control dust. R:\S P\Harveston SP\PC Docs\COA-SP.doc 8 67. Temporary drainage and sediment control devices shall be installed as directed by the Department of Public Works. 68. An import/export route shall be submitted to the Department of Public Works prior to issuance of any grading permit. The plan shall include limitation to the duration of the grading operation and construction activities, a Traffic Control Plan, and a daily time schedule of operations. 69. Prior to issuance of any grading permit, a soils reports shall be submitted to the Department of Public Works for review and approval, to address engineering, geologic, seismic, and soils engineering concerns for each tentative map or commercial parcel map for each phase of proposed development. 70. A Geotechnical Repod shall be prepared by a registered engineer or engineering geologist and submitted to the Department of public Works with the initial grading plan check. The report shall address special study zones and identify any geotechnical hazards for the site including location of faults and potential for liquefaction. The report shall include recommendations to mitigate the impact of ground shaking and liquefaction. 71. All public streets shall be maintained and cleaned if necessary on a daily basis during grading operation and construction activities. Cash deposit, letter of credit or posting of bond to guarantee maintenance of all public rights-of-way affected by the grading operations and construction activities, shall be posted prior to issuance of grading permits. 72. If subsequent Geotechnical and Soils Reports determine that dewatering of the site is necessary during construction, necessary permits (ie. in compliance with NPDES permit) shall be obtained from appropriate agencies prior to approval of the grading plans. PHASING 73. Construction of the development permitted by the Specific Plan, including recordation of final subdivision maps, may be carried out in stages provided that, adequate vehicular access is constructed for all dwelling units in each stage of development and further provided that such development conforms substantially with the intent and purpose of the Specific Plan 74. 75. Phasing Plan. Development applications shall be submitted for each planning unit in each phase. Total acreage and land uses within each phase shall be substantially in accordance with the specifications of the Specific Plan. The Developer shall be permitted to seek a reimbursement agreement for qualifying facilities and improvements, as the same are authorized in Condition 6 of the Resolution. The City and the Developer shall proceed in good faith to allocate appropriate reimbursements to the Developer pursuant to the City's then enforceable ordinance applicable to such reimbursement. 76. PHASE 1 a. CIRCULATION The following improvements shall be completed as part of Phase 1 and prior to 1st building permit in Phase 2. i. Improve Date Street from Margarita Road to the Major Entry at Date Street (Urban Arterial Highway Standards - 134' R/VV) to include dedication of half- R:\S P\Harveston SP\PC Docs\COA-SP,doc 9 width street right-of-way, installation of half-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer), and a 14 foot wide raised landscaped median ii. Improve the Major Entry at Date Street from Date Street to Loop Road (Modified Major Highway Standards - 100' R/VV) to include dedication of full- width right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer) and a 14 foot wide raised landscaped median iii. Improve the Loop Road from Major Entry at Date Street to School Site Modified Collector Road Standards - 66' R/VV) to include dedication of full- width right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer) iv. Improve northbound Margarita Road from Santa Gertrudis Creek to the southerly boundary of Tract Map No. 21340 (Arterial Highway Standards - 110' R/W) to include installation of half-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer), and a 14 foot wide raised landscaped median. CIRCULATION The following improvements shall be completed prior to the first occupancy permit in Phase I i. Improve the Loop Road from the Major Entry at Margarita Road to the westerly boundary of Planning Area 5 ( Modified Collector Road Standards - 66' R/VV) to include dedication of full-width right-of-way, installation of full- width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer) ii. iii. iv. 1. Provide an Eastbound Free Right Turn Lane from the Loop Road onto the Major Entry at Margarita Road Improve Southbound Margarita Road from Santa Gerirudis Creek to Date Street (Arterial Highway Standards - 110' R/VV) to include dedication of half- width street right-of-way, installation of half-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer), and a 14 foot wide raised landscaped median. Improve the Major Entry at Margarita Road from Margarita Road to Loop Road (Modified Street Section per the Specific Plan - 106' RJW) to include dedication of full-width right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer), and a 20 foot wide raised landscaped median Improve the Minor Entry at Margarita Road from Margarita Road to Loop Road (Modified Street Section per the Specific Plan - 82' R/VV) to include dedication of full-width right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and R:\S P'd-larveston SP\PC Docs\COA-SP,doc 10 sewer) v. Improve the Village Center Road from the Loop Road to the Maior Entry at Margarita Road (Modified Street Section per the Specific Plan - 63' R/W) to include dedication of full-width right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer) The following improvements shall be completed prior to the first occupancy permit in Phase 1 of the Service Commercial area vi. Improve Ynez Road from the southerly Specific Plan boundary to Equity Drive (Arterial Highway Standards - 110' RA, V) to include dedication of half- width street right-of-way, installation of half-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer), and a 14 foot wide raised landscaped median. vii. On or before January 1,2003 the Developer shall reserve for the City's use or commitment to use the same for freeway intemhange and/or freeway- related traffic circulation purposes, a component of real property that is: (i) approximately twenty (20) contiguous acres in area; (ii) identified and defined by the City Engineer of City of Temecula; reserved for a twenty (20) year period for the purpose of offering a permanent dedication for freeway related purposes to the City of Temecula if and when the City represents to Developer that a freeway interchange is to be constructed on the burdened property. Any portion of the Reserved real property shall be released from the reservation at the time the City determines such real property is not necessary for the freeway improvements. "Reservation" shall mean the Owner~n/or_Developer_of_the_subject_[ealJ~r_ol:~P,~/shall not improve the real property but shall instead maintain the property in a non-nuisance condition and in an undeveloped/unimproved state during the term of the Reservation. The Owner or Developer shall submit an enforceable written instrument so burdening the subject real property for the review and approval of the City Attorney and Director of Public Works prior to, and have the same approved, in such time so as to allow the Reservation to be enforceable on or before January 1, 2003. OFFSITE CIRCULATION Prior to issuance of 326th occupancy permit for the Phase 1 Residential and more than 8 acres of Phase 1 Service Commercial development (southern portion of Planning Area 12), the developer(s) shall implement the improvements for the following: i. Improve the intersection of Winchester Road at Ynez Road 1. Add Eastbound Through Lane 2. Add Southbound Right Turn Overlap Phase 3. Modify Signal to Provide Northbound Right Turn Overlap Phase R:\S P\Harveston SP\PC Docs\COA-SP.doc 11 ii. Improve the intersection of Winchester Road at Margarita Road 1. Add Right Turn Lane and Modify Signal to Provide Southbound Right Turn Ovedap Phase 2. Add Eastbound Left Turn Lane (Dual Left) TRAFFIC SIGNALS i. Prior to the first occupancy permit or as warranted, the developer shall install a traffic signal with conduits for future interconnect at the following intersections: 1. Margarita Road and Major Entry at Margarita Road 2. Major Entry at Margarita Road and Loop Road 3. Margarita Road and Date Street 4. Date Street and Major Entry at Date Street 5. Modify the existing traffic signal at the intersection of Margarita Road and Rustic Glen Drive DRAINAGE i. Construct backbone channel and/or drainage facilities and all associated improvements per Riverside County Flood Control and Water Conservation District and the City of Temecula WATER AND SEWER i. Install water mains per Rancho California Water District requirements and sewer mains per Eastern Municipal Water District requirements 77. PHASE 2 a. ClRCUEATION The following improvements shall be completed as part of Phase 2 and prior to first building permit in Phase 3. i. Improve Date Street from the Major Entry at Date Street to the westerly boundary of Planning Area 3 (Urban Arterial Highway Standards - 134' R/W) to include dedication of half-width street right-of-way, installation of half-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer), and a 14 foot wide raised landscaped median. ii. Improve the Loop Road from Major Entry at Date Street to the westerly boundary of Planning Area 5 (Modified Collector Road Standards - 66' RNV) to include dedication of full-width right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer). iii. Improve Ynez Road from Equity Drive to Service Commercial Access (Arterial Highway Standards - 110' PA, V) to include dedication of full-width right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities R:\S p'd-iarveston SP\PC Docs\COA-SP.doc 12 iv, (including but not limited to water and sewer) and a 14 foot wide raised landscaped median. On or before January 1,2003 the Developer shall reserve for the City's use or commitment to use the same for freeway interchange and/or freeway- related traffic circulation purposes, a component of real property that is: a) approximately twenty (20) contiguous acres in area; b) identified and defined by the City Engineer of City of Temecula; c) reserved for a twenty (20) year period for the purpose of offering a permanent dedication for freeway related purposes to the City of Temecula if and when the City represents to Developer that a freeway interchange is to be constructed on the burdened property. Any portion of the Reserved real properbJ shall be released from the reservation at the time the City determines such real property is not necessary for the freeway improvements. "Reservation" shall mean the Owner an/or Developer of the subject real property shall not improve the real property but shall instead maintain the property in a non-nuisance condition and in an undeveloped/unimproved state during the term of the Reservation. The Owner or Developer shall submit an enforceable written instrument so burdening the subject real property for the review and approval of the City Attorney and Director of Public Works prior to, and have the same approved, in such time so as to allow the Reservation to be enforceable on or before January 1, 2003. Improve Equity Drive from County Center Drive to the new Ynez Road (Modified Principal Collector Road Standards - 78' R/W) to include to include dedication of full-width right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and OFFSITE CIRCULATION Prior to the issuance of occupancy permits for the Phase II build-out of Residential (defined as issued building permits in excess of 476 for single family detached units and 346 for attached multiple family units) and Service Commercial (defined as development that involves real property that in the aggregate exceeds twenty (20) net acres of real property within Planning area 12) and Village Center neighborhood commercial (beyond an aggregate of eight thousand (8000) square feet of developed area) the improvements generally described hereafter shall have been completed to the reasonable satisfaction of the City and the Developer shall be authorized to seek a reimbursement agreement as provided for in condition 6, unless waived pursuant to condition 6. 1. 2. 3. R:\S P~Harveslon SP\PC Bocs\COA-SP.doc Winchester Road at Jefferson Avenue Add Eastbound Right Turn Lane Add a Southbound Left Turn Lane (Dual Left) Convert Southbound Right Turn Lane to Shared Through and Right Turn Lane 13 4. Add Northbound Right Turn Lane (Dual Right) ii. Winchester Road at I-15 Southbound Ramp 1. Add Eastbound Right Turn Lane 2. Add Southbound dedicated Left Turn Lane (Dual Left) and widen off ramp to accommodate the added lane iii. Winchester Road at Ynez Road 1. Add Eastbound Left Turn Lane (Dual Left) 2. Add Eastbound Through Lane 3. Add Northbound Left Turn Lane (Triple Left) 4. Modify Signal to provide Northbound Right Turn Overlap Phase 5. Split Northbound and Southbound Signal Phases 6. Add Westbound Through Lane 7. Add Southbound Shared Through and Right Turn Lane (300' Minimum) iv. Overland Drive at Jefferson Avenue 1. Modify Signal to Provide Westbound Right Turn Overlap Phase 2. Modify Signal to Provide Northbound Right Turn Overlap Phase 3. Split Northbound and Southbound Signal Phases 4. Add Eastbound Right Turn Lane v. Overland Drive at Ynez Road 1. Add Westbound Right Turn Lane 2. Modify Westbound Shared Through and Right Turn Lane to Through Lane 3. Modify Signal to ProvideWestbound Rightq'urnOverlapPha~ 4. Modify Signal to Provide Southbound Right Turn Overlap Phase vi. Overland Drive at Margarita Road 1. Modify Northbound Through Lane to Shared Through and Left Turn Lane 2. Split Northbound and Southbound Signal Phases vii. Winchester Road at 1-15 Northbound Ramp 1. Add Westbound right turn lane (Dual right) CITY OF MURRIETA CIRCULATION A fair-share contribution shall be made to the City of Murrieta prior to the first occupancy permit in Phase 2 to improve the intersection of: i. Murrieta Hot Springs Road at Jefferson Avenue 1. Add Westbound Left Turn Lane (Dual Left) 2. Channelize Northbound Right Turn Lane to Allow Free Right Turn Movement R:\S P~Ha~eston SP\PC Docs\COA-SP,doc 78. ii. Murrieta Hot Springs Road at Alta Murrieta Drive 1. Add Westbound Right Turn Lane 2. Modify Westbound Shared Through and Right Turn Lane to Right Turn Only Lane iii. Murrieta Hot Springs Road at Margarita Road 1. Modify Eastbound Through Lane to Shared Through Lane/Right Turn Lane 2. Modify Northbound Through Lane to Shared Through Lane/Left Turn Lane d. TRAFFIC SIGNALS i. Prior to the first occupancy permit, or as warranted, the developer shall install a traffic signal with conduits for future interconnect at the following intersections: 1. Date Street and Major Entry at Date Street e. DRAINAGE i. Construct backbone channel and/or drainage facilities and all associated improvements per Riverside County Flood Control and Water Conservation District and the City of Temecula requirements. f. WATER AND SEWER i. Install water mains per Rancho California Water District requirements and sewer mains per Eastern Municipal Water District requirements. PHASE 3 a. CIRCULATION The following improvements shall be completed as part of Phase 3 and prior to the first building permit in Phase 4: ii. Improve Date Street from the westerly boundary of Planning Area 3 to Ynez Road (Urban Arterial Highway Standards - 134' R/VV) to include dedication of full-width street right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer), and a 14 foot wide raised landscaped median 1. Provide Eastbound Right Turn Lane onto Ynez Road per EIR ID. No. 32 2. Provide Westbound Right Turn Lane onto Ynez Road per EIR ID. No. 32 Improve Ynez Road from Service Commercial Access III to Date Street (Arterial Highway Standards - 110' R/W) to include dedication of full-width right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer) and a 14 foot wide raised landscaped median 1. Provide Southbound Right Turn Lane onto Date Street per EIR ID. No. 37 R:\S P\Harveston SP\PC Docs\COA-SP,doc 15 iii. 2. Provide Northbound Right Turn Lane onto Date Street per EIR ID. No. On or before January 1,2003 the Developer sha[l reserve for the City's use or commitment to use the same for freeway interchange and/or freeway- related traffic circulation purposes, a component of real property that is: a) approximately twenty (20) contiguous acres in area; d) identified and defined by the City Engineer of City of Temecula; 79. c) reserved for a twenty (20) year period for the purpose of offering a permanent dedication for freeway related purposes to the City of Temecula if and when the City represents to Developer that a freeway interchange is to be constructed on the burdened property. Any portion of the Reserved real property shall be released from the reservation at the time the City determines such real property is not necessary for the freeway improvements. "Reservation" shall mean the Owner an/or Developer of the subject real property shall not improve the real property but shall instead maintain the property in a non-nuisance condition and in an undeveloped/unimproved state during the term of the Reservation. The Owner or Developer shall submit an enforceable written instrument so burdening the subject real property for the review and approval of the City Attorney and Director of Public Works prior to, and have the same approved, in such time so as to allow the Reservation to be enforceable on or before January 1,2003. DRAINAGE i. Construct backbone channel and/or drainage facilities and all associated improvements per Riverside County Flood Control and Water Conservation District and the City of Temecula requirements. WATER AND SEWER .i._ __lnstalLwater mains pe~BancboJ::;alifornia Water District_requirements_ and sewer mains per Eastern Municipal Water District requirements. PHASE 4 a. CIRCULATION The following improvements shall be completed as part of Phase 4. i. Improve Date Street from Ynez Road to Interstate 15 (Urban Arterial Highway Standards - 134' R/W) to include dedication of full-width right-of- way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer) and a 14 foot wide raised landscaped median ii. Improve Ynez Road from Date Street to the northerly Specific Boundary (Arterial Highway Standards - 110' R/W) to include dedication of full-width right-of-way, installation of full-width street improvements, paving, curb and gutter, sidewalk, street lights, drainage facilities, signing and striping, utilities (including but not limited to water and sewer) and a 14 foot wide raised landscaped median All necessary right-of-way in Planning Areas 8 and 12, including slope areas iii. R:\S P~Harveston SP'd:~C Docs\COA-SP,doc 16 for the Date/Cherry Interchange shall be granted free and clear of encumbrances in fee title. The location and limits of the right-of-way shall be as approved by the City and the California Department of Transportation. DRAINAGE i. Construct backbone channel and/or drainage facilities and all associated improvements per Riverside County Flood Control and Water Conservation District and the City of Temecula c. WATER AND SEWER i. Install water mains per Rancho California Water District requirements and sewer mains per Eastern Municipal Water District requirements FIRE DEPARTMENT The following are the Fire Department Conditions of Approval for this Specific Plan. All questions regarding the meaning of these conditions shall be referred to the Fire Prevention Bureau. 80. Final fire and life safety conditions will be addressed when building plans are reviewed by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC), and related codes which are in force at the time of building plan submittal. 81. 82. 83. The Fire Prevention Bureau is required to set a minimum fire flow for residential land division per CFC Appendix III.A, Table A-iII-A-1. The developer shall provide for this project, a water system capable of delivering 1500 GPM at 20-PSI residual operating pressure with a 2-hour duration. The required fire flow may be adjusted during the approval process to reflect changes in design, construction type, or automatic fire protection measures as approved by the Fire Prevention Bureau. The Fire Flow as given above has taken into account all information as provided. (CFC 903.2, Appendix Ill-A) The Fire Prevention Bureau is required to set minimum fire hydrant distances per CFC Appendix III.B, Table A-III-B-1. Standard fire hydrants (6" x 4" x 2 1/2" outlets) shall be located on Fire Department access roads-andadj~cent-publicstreets.~-lydrants shall be spaced at 500 feet apart, at each intersection and shall be located no more than 250 feet from any point on the street or Fire Department access road(s) frontage to a hydrant. The required fire flow shall be available from any adjacent hydrant(s) in the system. The upgrade of existing fire hydrants may be required. (CFC 903.2,903.4.2, and Appendix III-B The Fire Prevention Bureau is required to set a minimum fire flow for commercial land division per CFC Appendix Ill-A, Table A-III-A-1. The developer shall provide for this project, a water system capable of delivering 4000 G PM at 20-PSI residual operating pressure with a 4 hour duration. The required fire flow may be adjusted during the approval process to reflect changes in design, construction type, or automatic fire protection measures as approved by the Fire Prevention Bureau. The Fire Flow as given above has taken into account all information as provided. (CFC 903.2, Appendix Ill-A) 84. The Fire Prevention Bureau is required to set minimum fire hydrant distances per CFC Appendix Ill-B, Table A-III-B-1. Super fire hydrants (6" x 4" x 2-2 1/2" outlets) shall be located on Fire Department access roads and adjacent public streets. Hydrants shall be spaced at 350 feet apart, at each intersection and shall be located no more than 210 feet from any point on the street or Fire Department access road(s) frontage to a hydrant. The required fire flow shall be available from any adjacent hydrant(s) in the system. The upgrade of existing fire hydrants may be required. (CFC 903.2,903.4.2 and Appendix Ill-B) R:\S P~-iarveston SP\PC Docs\COA-SP.doc 85. Maximum cul-de-sac length shall not exceed 1320 feet. Minimum turning radius on any cul- de-sac shall be thirty-seven (37) feet for residential and forty-five (45) feet for commercial. (CFC 902.2.2.3, CFC 902.2.2.4) 86. If construction is phased, each phase shall provide approved access and fire protection prior to any building construction. (CFC 8704.2 and 902.2.2) 87. Prior to building construction, alt locations where structures are to be built shall have approved temporary Fire Department vehicle access roads for use until permanent roads are installed. Temporary Fire Department access roads shall be an all weather surface for 80,000 lbs. GVW. (CFC 8704.2 and 902.2.2.2) 88. Prior to building final, all locations where structures are to be built shall have approved Fire Department vehicle access roads to within 150 feet to any portion of the facility or any portion of an exterior wall of the building(s). Fire Department access roads shall be an all weather surface designed for 80,000 lbs. GVW with a minimum AC thickness of .25 feet. (CFC sec 902) 89. Fire Department vehicle access roads shall have a clear paved section of thirty-six (36) feet and an unobstructed vertical clearance of not less than thirteen (13) feet six (6) inches. (CFC 902.2.2.1 ). 90. Private roads and alleys may be as narrow as 20 feet unobstructed travel width, not including parking with Fire Prevention approval on a map by map basis. 91. Cul-de-sacs with planters must maintain 24 foot clear unobstructed travel width around the planters, not including parking. Hardscape areas are permissible provided that they meet the 80,000 lb. load requirements and are at road level. 92. The gradient for a fire apparatus access roads shall not exceed fifteen (15) percent. (CFC 902.2.2.6 Ord. 99-14) --- 93; A~f~raf ~cfi~lm~n~h~g b-vibes that couli~h3~-de--o?'~lbw--errfecgen-cy--vehlcle access are prohibited, except those approved individually on a map by map basis when they maintain the required travel widths and radii. 94. As required by the California Fire Code, when any portion of the facility is in excess of 150 feet from a water supply on a public street, as measured by an approved route around the exterior of the facility, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided. For this project on site fire hydrants are required. (CFC 903.2) 95. Prior to building construction, dead end road ways and streets in excess of one hundred and fifty (150) feet which have not been completed shall have a turnaround capable of accommodating fire apparatus. (CFC 902.2.2.4) 96. Prior to issuance of building permits, the developer shall furnish one copy of the water system plans to the Fire Prevention Bureau for approval prior to installation. Plans shall be signed by a registered civil engineer; contain a Fire Prevention Bureau approval signature block; and conform to hydrant type, location, spacing and minimum fire flow standards. After the plans are signed by the local water company, the originals shall be presented to the Fire Prevention Bureau for signatures. The required water system including fire hydrants shall be installed and accepted by the appropriate water agency prior to any combustible building R:\S P\Harveston SP\PC Docs\OOA-SP.doc 18 materials being placed on an individual lot. (CFC 8704.3, 901.2.2.2 and National Fire Protection Association 24 1-4.1 ) 97. Prior to issuance of a Certificate of Occupancy or building final, "Blue Reflective Markers" shall be installed to identify fire hydrant locations. (CFC 901.4.3) 98. Prior to issuance of a Certificate of Occupancy or building final, approved numbers or addresses shall be provided on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall be of a contrasting color to their background. Commercial, multi-family residential and industrial buildings shall have a minimum twelve (12) inches numbers with suite numbers a minimum of six (6) inches in size. All suites shall gave a minimum of six (6) inch high letters and/or numbers on both the front and rear doors. Single family residences and multi-family residential units shall have four (4) inch letters and/or numbers, as approved by the Fire Prevention Bureau. (CFC 901.4.4) 99. Prior to issuance of a Certificate of Occupancy or building final, a directory display monument sign shall be required for all apartment, condominium, townhouse or mobile home parks. Each complex shall have an illuminated diagrammatic layout of the complex which indicates the name of the complex, all streets, building identification, unit numbers, and fire hydrant locations within the complex. Location of the sign and design specifications shall be submitted to and be approved by the Fire Prevention Bureau prior to installation. 100. Prior to issuance of Certificate of Occupancy or building final, based on square footage and type of construction, occupancy or use, the developer shall install a fire sprinkler system. Fire sprinkler plans shall be submitted to the Fire Prevention Bureau for approval prior to installation. (CFC Article 10, CBC Chapter 9) 101. Prior to issuance of Certificate of Occupancy or building final, based on a requirement for monitoring the sprinkler system, occupancy or use, the developer shall install an fire alarm system monitored by an approved Underwriters Laboratory listed central station. Plans shall be submitted to the Fire Prevention Bureau for approval prior to installation. (CFC Article 10) 102. Pri6r to~h~-i~dAnCe~f ~ Certifioi~t~6f-Occupancy or building final;-a-"Kn~-13ox*-shall be provided, The Knox-Box shall be installed a minimum of six (6) feet in height and be located to the right side of the main entrance door. (CFC 902,4) 103. All manual and e~ectronic gates on required Fire Department access roads or gates obstructing Fire Department building access shall be provided with the Knox Rapid entry system for emergency access by fire fighting personnel. (CFC 902.4) 104. Prior to final inspection of any building, the applicant shall prepare and submit to the Fire Department for approval, a site plan designating Fire Lanes with appropriate lane painting and or signs. 105. Prior to the issuance of a Certificate of Occupancy, building final or occupancy, buildings housing high-piled combustible stock shall comply with the provisions of Uniform Fire Code Article 81 and all applicable National Fire Protection Association standards. The storage of high-piled combustible stock may require structural design considerations or modifications to the building. Fire protection and life safety features may include some or all of the following: an automatic fire sprinkler system(s) designed for a specific commodity class and storage arrangement, hose stations, alarm systems, smoke vents, draft curtains, Fire Department access doors and Fire department access roads. (CFC Article 81 ) R:\S P~Har~eston SP~PC Docs\COA-SP.doc 19 106. 107. Prior to the building final, speculative buildings capable of housing high-piled combustible stock, shall be designed with the following fire protection and life safety features: an automatic fire sprinkler system(s) designed for a specific commodity class and storage arrangement, hose stations, alarm systems, smoke vents, draft curtains, Fire Department access doors and Fire department access roads. Buildings housing high-piled combustible stock shall comply with the provisions California Fire Code Article 81 and all applicable National Fire Protection Association standards. (CFC Article 81) Prior to the issuance of a Certificate of Occupancy or building final, the developer/applicant shall be responsible for obtaining underground and/or aboveground tank permits for the storage of combustible liquids, flammable liquids or any other hazardous materials from both the County Health department and Fire Prevention Bureau. (CFC 7901.3 and 8001.3) Special Conditions 108. Prior to issuance of building permits, fuel modification plans shall be submitted to the Fire Prevention Bureau for review and approval for all open space areas adjacent to the wildland- vegetation interface. (CFC Appendix II-A) 109. Prior to issuance of building permits, plans for structural protection from vegetation fires shall be submitted to the Fire Prevention Bureau for review and approval. The measures shall include, but are not limited to, enclosing eaves, noncombustible barriers (cement or block walls), and fuel modification zones. (CFC Appendix II-A) 110. Prior to building permit issuance, a full technical report may be required to be submitted and to the Fire Prevention Bureau for some commercial occupancies. This report shall address, but not be limited to, all fire and life safety measures per 1998 CFC, 1998 CBC, NFPA - 13, 24, 72 and 231-C. 111. Prior to issuance of a building construction in each phase a simple plot plan or map in an electronic file of the .DWG format must be submitted to the Fire Prevention Bureau. Alternative file formats may be acceptable, contact fire prevention for approval. 112. The applicant shail comply with the requirements of the Fire Code permit process and update any changes ~n-th-e~t~d ~b~titie~'al~pr~ed~s~ o~f~heirFIre-C~fmlt. These changes shall be submitted to the Fire Prevention Bureau for review and approval per the Fire Code and is subject to inspection. (CFC 105) 113. The applicant shall submit for review and approval by the Riverside County Department of Environmental Health and City Fire Department an update to the Hazardous Material Inventory Statement and Fire Department Technical Report on file at the city; should any quantities used or stored onsite increase or should changes to operation introduce any additional hazardous material not listed in existing reports. (CFC Appendix II-E) TEMECULA COMMUNITY SERVICES DEPARTMENT General Requirements: 114. If any of the following conditions of approval differ from the Specific Plan text or exhibits, the conditions enumerated herein shall take precedent. 115. The current park dedication requirement {Quimby) shall be satisfied with the 16.5 acre community park, the existing Winchester Creek Park and the HOA owned and maintained R:\S P\Ha~veston SP\PC Docs\COA-SP.doc 20 recreational areas identified in the Harveston Specific Plan including the 6.9 acre Lake Park, the 1.8 acre Village Green, the 2 acre Village Club and the mini parks totaling 1.5 acres. 116. The actual design of the 16.5 acre community park in Planning Area 1 shall be in substantial conformance with the conceptual designs and guidelines identified within the Specific Plan. Prior to submittal of construction plans, the developer shall meet with the Director of Community Services to determine the location and specifications of the park amenities to be provided on site. Construction plans and specifications must be approved bythe Director of Community Services. 117. All park and slope/landscape plans submitted for consideration shall be in conformance with the City of Temecula Landscape and Irrigation Specifications and Installation Details and the Park Land and Landscape Dedication Process, 1 18. The design of the community park in Planning Area 1 shall provide for pedestrian circulation and access for the disabled throughout the park. 119. 120. 121. Construction of the 16.5 acre community park site and proposed TCSD landscape maintenance areas shall commence pursuant to a pre-job meeting with the developer and TCSD Maintenance Superintendent. Failure to comply with the TCSD review and inspection process may preclude acceptance of these areas into the TCSD maintenance programs. The developer, the developer's successor or assignee, shall be responsible for all maintenance of the park sites and slopes/landscaping areas until such time as those responsibilities are accepted by the TCSD. The 16.5 acre community park shall be improved and dedicated to the City free and clear of any liens, assessment fees, or easements that would preclude the City from utilizing the property for public purposes. A policy of title insurance and a soils assessment report shall also be provided with the conveyance of the property. 122. All perimeter slope/landscape areas adjacent to roadways with a 66 foot right of way or larger adjacent_to sing!e_fam_i!y residentia!_d_¢_velopment shall be offered for dedication to the TCSD for maintenance purposes following compliance to existing City standards and completion of the application process. Alt other landscape areas, entry monumentation, signage, pedestrian portals, bus shelters and walls shall be maintained bythe Homeowners Association (HCA), private maintenance association or property owner. 123. A ten (10) foot wide multi-use trail will be constructed around the Lake Park. An 8' paseo will be constructed within the Paseo Park and along the outside of the Loop Road. 124. Class I1 bicycle lanes will be included on both sides of Ynez Road, Date Street (within the project area), the Loop Road and the three entrance roads, and the adjacent portions of Margarita Road and Date Street (bordering the County line). Class II bike lanes shall be constructed in concurrence with the street improvements. 125. The developer is entitled to receive a credit against the park component of the City's Development Impact Fee (DIF) based upon the actual cost of improving the community park in Planning Area 1. The lee/credit issue shall be addressed pursuant to the execution of a Development Agreement or a Park Improvement Agreement between the applicant and the City prior to approval of the final map. 126. The 16.5~acre community park in Planning Area 1 shall be constructed, including the 90-day R:\S P\Harveston SP~PC Docs\COA*SP.doc 21 maintenance and establishment period, and the conveyance accepted by the City Council prior to the issuance of the first residential building permit in Phase 2 (excluding models). Notwithstanding the foregoing, if the completion of the 16.5 acre Community Park is delayed because the final and permanent alignment of Ynez Road has not been determined which prevents the designation of the boundaries of the subject park, the City may, in the reasonable discretion of the City Manager and which shall not be unreasonably withheld, continue to issue building permits during the term of such uncertainty. The City Manager may require, and the Owner or Developer shall provide, the provision of notice to potential purchasers of the scope of improvements intended to occur within the subject park, including, but not limited to, lighted athletic fields. Notice, as required by the City Manager, may include, but is not limited to, signage (both on and off the anticipated park site), letters, displays or handbills. Prior to Approval of the Final Map: 127. The developer, or his assignee, shall offer for dedication, enter into an agreement and post security with the TCSD to improve the proposed parkland located in Planning Area 1 in accordance with the City standards, prior to the approval of the respective final map. 128. All areas intended for dedication to the TCSD for maintenance shall be identified on each final map by numbered lots and indexed to identify said lots numbers as a proposed TCSD maintenance areas. 129. All TCSD slope/landscaping maintenance easements shall be offered for dedication on each final map. 130. Construction drawings for all landscape medians and proposed TCSD slope/landscape maintenance areas shall be reviewed and approved by the Director of Community Services prior to the approval of each final map. 131. The subdivider shall post security and enter into an agreement to improve all landscape medians and proposed TCSD maintenance areas prior to the approval of each final map. 132. The developer shall file a notice of i~it~h~T~la-C~Fn~h-ity Services to initiate election proceedings for acceptance of residential street lights and perimeter slope/landscape into the TCSD maintenance program prior to approval of each final map. All costs associated with this process shall be borne by the developer. Prior to Issuance of Building Permits: 133. Prior to the installation of street lights or issuance of building permits, whichever comes first, the developer shall file an application and pay the appropriate fees to the TCSD for the dedication of arterial and residential street lights into the appropriate TCSD maintenance program. Prior to Issuance of Certificates of Occupancy: 134. Prior to the issuance of the first certificate of occupancy within each phase map, the developer shall submit the most current I'st of Assessor s Parcel Numbers assigned to the final project. 135. It shall be the developer's responsibility to provide written disclosure of the existence or TCSD and its service level rates and charges to all prospective purchasers. R:~S P~Harveston SP\PC Docs\COA-SP.doc 22 OUTSIDE AGENCY LEI-I'ERS 136. The applicant shall comply with the recommendations set forth in the Eastern Municipal Water District transmittal dated March 31, 1999, a copy of which is attached. 137. The applicant shall comply with the recommendations set forth in the Rancho Water transmittals dated November 9, 1999 and September 8, 2000, a copy of which is attached. 138. The applicant shall comply with the recommendations set forth in the County of Riverside Department of Environmental Health transmittal dated February 1,2000, a copy of which is attached. 139. The applicant shall comply with the recommendations set forth in the Riverside County Flood Control and Water Conservation District transmittal dated January 1,2000, a copy of which is attached. 140. The applicant shall comply with the recommendations set forth in the Department of Transportation transmittal dated November 15, 1999, a copy of which is attached. 141. The applicant shall comply with the recommendations set forth in the Eastern Information Center, Department of Anthropology transmittal dated November 3, 1999, a copy of which is attached. 142. The applicant shall comply with the recommendations set forth in the Temecula Valley Unified School District transmittal dated November 5, 1999, a copy of which is attached. 143. Comply with the terms and conditions of the U.S. Fish and Wildlife and Army Corps of Engineer permits obtained for this project. 144. The applicant shall comply with the recommendations set forth in the Riverside Transit Agency transmittal dated May 31,2001, a copy of which is attached. By placing my signature below, I confirm that I have read, understand ar~d~c~t-~ll~h~ove Conditions of Approval. I further understand that the property shall be maintained in conformance with these conditions of approval and that any changes I may wish to make to the project shall be subject to Community Development Depadment approval. Applicant Name R:\S P~Harveston SP\PC Docs\COA-SP.doc 23 Board of Directors President David J. Slawson ~qce President Clayton A. Record, Jr. Marion V. Ashley Richard R. Hall Rodger D. Sierns X. lary C. White John B. Brudin Director of the Metropolitan Water District of So. Calif. Clayton A. Record, Jr. Kuebler. CPA Legal Cou.sel Redwine and Sherrill October 4, 2000 County of Riverside Environmental Health Department P.O. Box 1206 Riverside, CA 92502 Dear Colleague: Re: SAN53-Sewer Will Serve 1,921 Units, Located west of Margarita Rd., north of Date St. in the County of Riverside. EMWD is willing to provide water and/or sewer service to the subject project. The provisions of service are contingent upon the developer completing the necessary arrangements in accordance with EMWD rules and regulations. The arrangements may include plan check, facility construction, annexation, payment of financial participation charges, coordination with a sub-agency, reclaimed water facilities and other requirements. The developer should contact EMWD's New Business Development Department early in the process to determine the necessary arrangements for service. EMWD's ability to serve is subject to limiting conditions, such as water shortages, regulatory requirements, legal issues, or conditions beyond EMWD's control. Thank you for your cooperation in serving our mutual customers. If you have any questions, please call me at (909) 928-3777, ext. 4518. Sincerely/;7 ./ D ,~---~'~ Civil Engineering Assistant New Business Development MHS/ C: Ms. Patty Anders City of Temecula P.O. Box 9033 Temecula, CA 92589-9033 Mailing .4ddress: \ \ fpsnt s2\ J_\WORDPROC\WORD\NEW_BUSI, 11 \Wi 11 Serve\Yea r2000\ma rg&dat est .doc Post Office Box 8300 Pen-is. CA 92572-8300 Telephone: (909) 928-3777 Fax: (909) 928-6177 Location: 2270 Tremble Road Pen'is. CA 92570 Ralph H. Daily Presldenl Doug Kulberg Sr. Vice Presldenl Lisa D. Herman Cseba F. Ko Scott A. Mclntyre Jeffrey L. Mink]er George M. Woods John F. Hennigar Phillip L. Forbes Kenneth C. Dealy Perry R. Louck Linda M. Fregoso C. Michael Coweti Best Best & Krieger LLP November 9, 1999 Patty Anders, Case Planner City of Temecula Planning Department 43200 Business Park Drive Post Office Box 9033 Temecula, CA 92589-9033 SUBJECT: WATER AVAILABILITY SWEETWATER SPECIFIC PLAN ASSESSMENT DISTRICT NO. 161 VARIOUS ASSESSOR'S PARCEL NUMBERS PLANNING APPLICATION NO. PA99-04'18 AND PA99-0419 Dear Ms. Anders: Please be advised that the above-referenced development is located within the boundaries of Rancho California Water District (RCWD). Water service, therefore, would be available upon completion of financial arrangements between RCWD and the property owner along with the construction of any required on-site and/or off-site water facilities. If fire protection is required, the customer will need to contact RCWD for fees and requirements. Water availability would be contingent upon the property owner signing an Agency Agreement that assigns water management rights, if any, to RCWD. If you have any questions, please contact an Engineering Services Representative at this office. Sincerely, RANCHO CALIFORNIA WATER DISTRICT Steve Brannon, P.E. Development Engineering Manager 99~SB:mc303~'012-T1 ~C F September 8, 2000 Patty Anders, Case Planner City of Temecula Planning Department 43200 Business Park Drive Post Office Box 9033 Temecula, CA 92589-9033 SUBJECT: WATER AVAILABILITY HARVESTON SPECIFIC PLAN Dear Ms. Anders: Please be advised that the above-referenced property is located within the boundaries of Rancho California Water District (RCWD). Water service, therefore, would be available upon completion of financial arrangements between RCWD and the property owner. RCWD has reviewed the Specific Plan for the Harveston development. As stated above, RCWD will provide water service to this project. The proposed demands have been incorporated into both the RCWD Water Resource Master Plan and Water Facilities Master Plan. These plans have been reviewed and adopted by the District's Board of Directors. The review of the above-referenced documents affirms that the water demand for this area was evaluated and incorporated into the RCWD Master Plans. Also, please refer to our letter of August 23, 2000 (copy enclosed) concerning the proposed lake. RCWD highly recommends that the issue of utilizing reclaimed water be completely addressed in the site master plan and specific plan. If you have any questions, please do not hesitate to call. Sincerely, RANCHO CALIFORNIA WATER DISTRICT Steve Brannon, P.E. Development Engineering Manager Enclosure ili~SEP 11 ZOO0 TO: FROM: RE: County of Riverside HEALTH SERVICES AGENCY DEPARTMENT OF ENVIRONMENTAL HEALTH DATE: February 1,2000 CITY OF TEMECULA PLANNING DEPARTMENT ATTN: Patty Anders GREGOR DELLENBACH, Interim Supervisor SWEETWATER SPECIFIC PLAN The Sweetwater Specific Plan dated September 1999 has been received and reviewed. Will-serve letters from the water and sewering agencies will be required and the use of reclaimed water on all parklands and other greenbelt zones and other landscaped zones is highly recommended. In order to serve domestic water and provide sanitary sewer service to the project area, "will-serve" letters from Rancho California Water District (RCWD) and Eastern Municipal Water District (EMWD) respectively will be required. Domestic water demands are calculated to be 2.02 MGD and wastewater flows to be 0.723 MGD. The report advises that RCWD and EMWD can handle those demands. The report identifies that 254.7 acres of park, open space and school sites that should be eligible to receive reclaimed water. These irrigation systems should be designed to accommodate a reclaimed water system. The concerns regarding re-claimed water have not been addressed in the document reviewed. Sincerely, Gregor Dellenbach, In erim Supervisor GD:dr (909) 955-8980 DAVID P. Z:\PPE General Manaaer-Chief Er~aincer RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT City of Temecula Planning Department Post Office Box 9033 Temecula, California 92589-9033 1095 MARKET STREET RIVERSIDE. CA 92501 909.955.1200 909.788.9965 FAX 51180.1 ond~tions for land divisions or other land use cases in incorporated The District does not normally recomm~n~ c.. ,' ...... .~¢. or nrovide State Division of Real Estate let~¢rg, o( &~ti~s. The District also does not .plan cneck.c?~2~%~;7~,o~ehdations for such cases are Do~¢lly other flood hazar¢¢reppas f?r. su~_c¢~;~t~[~i~"6~i~i'&~-~aster Drainage Plan facilities, other rog,chat noou to items o~ ~p~%'~J~stS~% c;~'l'~ be considered a logical compongO.~or e~$~%~i~~ and District Area Uralnagu m~. ~==- . ...... ~ ...... - provided. - d to'oct in detail and the following checked comments do not in any way The District has not r?v~?wed the propose p J nroiect with res oct to flood hazard, public ~nn~titute or imDly District approva or endorsement of the proposed r , P ~l~-~d safet~ 8r any other such ~ssue: This project would not be impacted by District Master Drainage Plan facilities nor are other facilities of regional ~nterest proposed. r P an facilities The District w accept ownership of such facilities on Th' project invo yes District M~e . ' .... ~ ,~ n~.,.~¢+ ~t= ards and D strict plan chec~ and ~i~'n r~auest of the City. Facilities must oe constr~ ,~ ~,,~..,~2%~ ~n'd administratve fees wdl be :' ....... '--~ ill be re uired for District acceptance fflan check, .,op= ........ ~nspecbon w q ' required. · I storm drains 36 riches or larger in diametgr, or other facilities that / This project may ~:o~e ~?~;~, in nature and/or a logical. ?xtens,o~ o¢__:~ - coed ee co~sL~%e2 ~ M**t.r Drainage Plan The D~stnct woul~ co.o,~=~ .... ~ICTA ~' ....... , ~ ~- Cit-' Fac tes must be constru~e~ ~ bwnersmp ct s~cp.(a?ht?s .... ~ ~-~ in¢¢ection will be required for District acceptance Plan checK, inspection and administrative fees will be required. of the District's ¢~61~ ~6~/~gg~¢~ V~&~¢~a This pro'oct is Iocate~ wlthlq the h?ts .... ~¢. ~nn d' aBohcable tees ~ould De pald_~y cashi~? ~ Drain~g~ Plan for ~h,ch ~r~l~ ~2~j~n¢;FSi;~ri~r (5 issuance of building or $%i%~e~r%%%e~s~r%~ ~¢~o%; ;;~;n%uld be at the rate in effect at the time o, issuance u, u ,=- permit. GENERAL iNFORMATION · · i char e Elimination System (NPDES) permit from the State Water This project, ay r¢,~.a ~}~i.~t~d?~, re~rdation, or other final Bppro?f ~hould not be given until the Resources uonFo[PPa?L ~.%.~L%7%** he%n e ~ted a permit or is shown to De exump,. ment A eric (FEMA) mapped flood plain, then the Ci~ should ¢ th ~ nrni¢ct nvoIves a Federal Emergency Mangg~ .. g '--~ *nd O~k .... formation required to meet FEM~ ..... 7-%'2:-%~licant to nrovide all studies, calculat pns.. p~}%:.F~;~;;i Letter of Map Revision CLOMN) requ~ u~.~%~ .k~.ld~¢udher require that the app,cam ou~an~ ~ ~'~"','~&L% ~ ~ Revision (LOMR) pnor to reCuffemen~,L~"-*-~r~2tinn o thor final a royal of the project, and a uu~, ~. ,- F prior to gra~lng, ~:~ ......... r o PP occupancy. ' 'im acted b this project, the City should require the a~p. licant to If a natural wptercourse or mapped flood plain is ' mia ~ a~ment of Fish and e,me an~ a ~.~t~c~ btain a Sect,on 1601/1603 Agr¢~m%nt fro~ th~_~,.~r~ or written corresponcence ,rom tr)u~2 o ction 404 Permit from the U.b. Army ~orp~ ~'~%~¢~n Water Act Section 401 Water Quahty uemncauon ~. .._. k~ ..~i¢ct is exemot from these requ!remum~. ~¢,%.. ¢~ntrn Rn~rd Dr or to issuance of the Corps may be required ~rom ,,,e ,ccal Ca...or...a..e~lO permit. Vow truly yours. STUART E. MGKIBBIN Senior Civil Engineer STATE OF CALIFORNIA--BUSINESS, ~,ND HOUSING AGENCY DEPARTMENT OF TRANSPORTATION DISTRICT 8 t64 W Fourth Street, 6th Floor MS 726 an Bemardino, CA 92401-1400 HONE (909) 383-6327 AX (909) 383-6890 November 15, 1999 08-Riv-79-R3.300 Ms. Patty Anders Assistant Planner PO Box 9033 Temecula, CA 92589-9033 Dear Ms. Anders: NOV 1 7 1999 GRAY DAVIS, Governor Sweetwater Specific Plan The City of Temecula should ensure that the applicant complies with the current Congestion Management Program in place as defined by the Riverside County Transportation Commission (1997). Please forward all future plans and documents to this office regarding this proposal. If you have any questions, please contact Jim Belty at (909) 383-4473 or FAX (909) 383-6890 Sincerely, LINDA GRIMES, Chief Office of Forecasting/ IGPJCEQA Review c: Mosle Boyd, State Clearinghouse ~ovember ~, 1999 11:26am -- SERT ~¥:UCR ALIFORNIA HISTORICAL P, ESOURCES iNFORMATION YSTEM 3-99 ;11:0?AN ; ARCH 90969454??;# EaStern Information Center Department of Anthropology University of car~omla Riverside, CA 92521-0418 Phone (909) 787-6745 Fax (909) 787-5409 DATE: RE: C~e Trensn~t~d Reference De~ign~ion: ~%; R~cords at the Eastetu Information Center oflhe CaJifor teem reviewed to determine ifthb pmj~c~ would adverse{ ~ou:ce(~). A ~mee I eudy b mmmL,~--,,~4_ k na~mmended, ~ A Plm~ ! e~,e,.~l re~u~c~ *tudy 0dF # ) id~tifl .I~--~l f, duri~ eon~tr~, euku mi rcsourc~ arc ~-c, ante Ted, wot · qu~i~ed arcl~teolo,Bi~ ev&'l,~ tix~ ~ nad ma]~:s t'ceo~ Du~ to the ~mlmeoio~ml sam~vky of t]~ area, eanhmov~n; ~ ..._ Thc stg~-,;.~oa of · cult~tl rc,outc~ management fepofl is P.~o ume Idana &.cmt~ kepom p~'ed by ~ Calif~rnli 0 4(4J, Dm:mmber Faue II! COMM];NTS: if you have any queatEons, ple~e conta~ us. RCE REVIKW ~ Hist~rlcnl Resources Information System have effect pr~lstoric or hi~rlc cu]turnl resourcm: cultural ~c,~utc~. A ~ I ltUd,y 0ukurtl rmouroo,. Hov~'wr, dt~ to thc na~fo of tho t6ral n~omcca ia n~ sntloil~tcd. Put'ct study ts not o oukut'll acsottroe~. Pu.rtAcr etud7 ie ~ ~rinS c~n~ should be a~n]~orcclby · professional of Hi~orio Prc~:rv~tion, ~'~J~ Pb~ff~. ,~utbtfa ropme m~Ratlon ~ fur "~l~tat' sil~,] ,resc,~ltkm in pk~e, or a oomb~n of dm Easte. rn Xnformation ~entm* November 5, 1999 TEMECULA VALLEY Unified School District SUPERINTENDENT David B. Aflmen NOV 1 6 1999 - BOARD OF EDUCATION Pa'~i Smith Richard Sharer Ed Elder Jerry Hol3bs Barbara Tooker Ms. Patty Anders City of Temecula P.O. Box 9033 Temecula, CA 92589-9033 SUBJECT: PA99-0419 (Sweetwater) Dear Ms. Anders: Temecula Valley Unified s~-ongly supports the inclusion of a twelve-acre elementary school within the proposed Sweetwater Specific Plan. An elementa~ school within the community will be vital to serve the students generated by the homes there, as well as other City of Temecula residents. There is a need to open this school as early as August of 2000. As was discussed in an earlier meeting with City Manager Shawn Nelson, and Deputy City Manager, Gary Thomhill, this may require an acceleration of the school site portion of the specific plan. Lennar Communities has worked closely with the school district in establishing the location and configuration of the school site shown in the proposed plan. The District encourages an expeditious approval of that aspect of the plan as shown. Sincerely, Temecula Valley UnifiedhSchool Distr!ct Janet Dixon .~ /C~oordinator of Facilities Services Cc: Dave Gallaher, Director of Facilities Services 31350 Rancho Vista Road / Temecula, CA 92592 / (909) 676-2661 May31,200] Riverside Transit Ageno7 1825 Third Sxreex P.O. Box 59968 Riverside, CA 925t7 Phone: (909) 684-0850 F.~x: (909) 684-1007 City of Temccula Planning Department I met recently with Matt Fagan to discuss thc ]-Iarvcston Specific Plan. It appears that ali attempts have bcen made to design the project in a transit-friendly maimer, including thc open-ended clustering ofresidential unit.~. The mixed.uses in the Village Green Center are also conducive to transit usage.. We hope to jointly design a pilot program to encourage transit usage and thc usc of other alternatives to the single occupancy vehicle. It would be beneficial for the community to provide transit access tn adjacent areas, such as thc Promenade Mall, middle and high schools and local employment centers. Please continue to keep os posted so we can maximize coordiuation of planning efforts. Thank you/'or thc opportunity to comment on this project. , Pluming Dirceto-"~--~