Loading...
HomeMy WebLinkAbout02_008 PC ResolutionPC RESOLUTION NO. 2002-008 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. 01- 0539, DEVELOPMENT PLAN TO CONSTRUCT, ESTABLISH AND OPERATE A 18,894 SQUARE FOOT TWO-STORY OFFICE/WAREHOUSE BUILDING ON A .96 ACRE SITE GENERALLY LOCATED ON THE WEST SIDE OF ENTERPRISE CIRCLE NORTH, 230 FEET NORTH OF WINCHESTER ROAD KNOWN AS ASSESSORS PARCEL NO. 909-281-003 WHEREAS, Davcon Development, filed Planning Application No. PA01-0539 Development Plan "Application"), in a manner in accord with the City of Temecula General Plan and Development Code; WHEREAS, the Application was processed including, but not limited to a public notice, in the time and manner prescribed by State and local law; WHEREAS, the Planning Commission, at a regula, r meeting, considered the Application on April 24, 2002, at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to and did testify either in support or in opposition to this matter; WHEREAS, at the conclusion of the Commission hearing and after due consideration of the testimony, the Commission recommended approval of the Application subject to and based upon the findings set forth hereunder; WHEREAS, all legal preconditions to the adoption of this Resolution have occurred. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF TEMECULA DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1. reference. The above recitations are true and correct and are hereby incorporated by Section 2. Findinqs. The Planning Commission, in approving the Application hereby makes the following findings as required by Section 176.05.01 OF of the Temecula Municipal Code: The proposed use is in conformance with the General Plan and with all applicable requirements of state law and other City ordinances. The plan to develop an 18,894 square foot, two-story office/warehouse building is consistent with the Business Park (BP) policies, City-Wide Design Guidelines and development regulations. The proposed plan incorporates architectural and landscape designs, which will achieve the City's General Plan Community Design Goal #3, "Preservation and enhancement of the positive qualities of individual districts or neighborhoods ". The 18,894 square foot office/warehouse building complies with all applicable development standards of the Business Park (BP) zoning district as well as off-street parking and landscaping requirements. R:\D PX2001\01-0539 Gospel Recordings\Staff Report and COAs.doc 7 The overall development of the land is designed for the protection of the public health, safety, and general welfare. The project has been conditioned to conform to the Uniform Building Code, and all construction will be inspected by City staff prior to occupancy. The Fire Department staff has also found that the site design will provide adequate emergency access in the case of a need for emergency response to the site. Section3. Environmental Compliance. The project will have no significant environmental impacts and has been found to be categorically exempt, Pursuant to Section 15332 class 32 of the California Environmental Quality Act Guidelines. Section 4. Conditions. That the City of Temecula Planning Commission hereby conditionally approves the Application, a request to develop an 18,894 square foot, two-story office/warehouse building set forth on Exhibit A, attached hereto, and incorporated herein by this reference together with any and all necessary conditions that may be deemed necessary. Section 5. Commission this 24th day of April 2002. ATTEST: PASSED, APPROVED AND ADOPTED by the City of Temecula Planning Del~ie-Ub'noske, Secretary [SEAL] ST;~TE OF CALIFORNIA ) COONTY OF RIVERSIDE ) SS CITY OF TEMECULA ) I, Debbie Ubnoske, Secretary of the Temecula Planning Commission, do hereby certify that PC Resolution No. 02-008 was duly and regularly adopted by the Planning Commission of the City of Temecula at a regular meeting thereof held on the 24th day of April, 2002, by the following vote of the Commission: AYES: 4 PLANNING COMMISSIONERS: Guerriero, Mathewson, Olhasso, and Chairman Chinaeff NOES: 0 PLANNING COMMISSIONERS: None ABSENT: 1 PLANNING COMMISSIONERS: Telesio ABSTAIN: 0 D~bbie Obnoske, Secretary R:~D 1'x2001\01-0539 Gospel Recordings\Staff Report and COAs.doc 8 EXHIBIT A CONDITIONS OF APPROVAL R:~D P~2001\014)539 Gospel Recordings\Staff Report and COAs.doc 9 EXHIBIT A CITY OF TEMECULA CONDITIONS OF APPROVAL Planning Application No.: PA01-0539 Development Plan Project Description: Planning Application to construct, establish and operate an 18,894 square foot office/warehouse building on .96 acres of vacant land. Development Impact Fee Category: The Development Impact Fee for the project will be Business Park/Industrial Assessor's Parcel No.: 909-281-003 Approval Date: April 24, 2002 Expiration Date: April 24, 2004 PLANNING DIVISION Within Forty-Eight (48) Hours of the Approval of this Project 1. The applicant shall deliver to the Community Development Department - Planning Division a cashier's check or money order made payable to the County Clerk in the amount of Sixty- Four Dollars ($84.00) for the County administrative fee, to enable the City to file the Notice of Exemption required under Public Resources Code Section 21108(b) and California Code of Regulations Section 15075. If within said forty-eight (48) hour period the applicant has not delivered to the Community Development Department - Planning Division the check as required above, the approval for the project granted shall be void by reason of failure of condition [Fish and Game Code Section 711.4(c)]. General Requirements 2. The applicant and owner of the real property subject to this condition shall hereby agree to indemnify, protect, hold harmless, and defend with Legal Counsel of the City's own selection, the City shall be deemed for purposes of this condition, to include any agency or instrumentality thereof, or any of its elected or appointed officials, officers, employees, consultants, contractors, legal counsel, and agents from any and all claims, actions, awards, judgments, or proceedings against the City to attack, set aside, void, annul, seek monetary damages resulting, directly or indirectly, from any action in furtherance of and the approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board or legislative body including actions approved by the voters of the City, concerning the Planning Application. 3. City shall promptly notify both the applicant and landowner of any claim, action, or proceeding to which this condition is applicable and shall further cooperate fully in the defense of the action. The City reserves its right to take any and all action the City deems to be in the best interest of the City and its citizens in regards to such defense. 4. All conditions shall be complied with prior to any occupancy or use allowed by this Development Plan. R:\D P~2001\01-0539 Gospel Recordings\Staff Report and COAs.doc 10 The permittee shall obtain City approval for any modifications or revisions to the approval of this development plan. This approval shall be used within two (2) years of the approval date; otherwise, it shall become null and void. By use is meant the beginning of substantial construction contemplated by this approval within the two (2) year period, which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval. The development of the premises shall substantially conform to the approved Exhibits D (Site Plan), E (Grading Plan), F (Building Elevation), G (Floor Plan), H (Landscape Plan), and I (Color and Material Board) contained on file with the Community Development Depariment - Planning Division. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Planning Director. If it is determined that the landscaping is not being maintained, the Planning Director shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. All mechanical and roof equipment shall be fully screened from public view by being placed below the lowest level of the surrounding parapet wall. The colors and materials for the project shall substantially conform to those noted directly below and with Exhibit "1' (Color and Material Board), contained on file with the Community Development Department - Planning Division. Exterior Colors: Accent at Roofline Body of Building Entry Frames, Base, Corner Columns Building Glazing Frazee paint #8260W "Pavilion" Frazee paint #8262W "Peanut Shell" Frazee paint #8264D "Tucson Clay" Visteon Versalux lA "Green 2000R" 11. The construction landscape drawings shall indicate coordination and grouping of all utilities, which are to be screened from view per applicable City Codes and guidelines. Prior to Issuance of Grading Permits 12. The applicant shall sign both copies of the final conditions of approval that will be provided by the Community Development Department - Planning Division staff, and return one signed set to the Community Development Department - Planning Division for their files. 13. The applicant shall submit to the Community Development Department - Planning Division for permanent filing two (2) 8" X 10" glossy photographic color prints of the approved Color and Materials Board and of the colored version of approved Exhibit "F", the colored architectural elevations to the Community Development Department - Planning Division for their files. All labels on the Color and Materials Board and Elevations shall be readable on the photographic prints. 14. The applicant shall submit a parking lot lighting plan to the Planning Department which meets the requirements of the Development Code and the Palomar Lighting Ordinance. The parking lot light standards shall be placed in such a way as to not adversely impact the growth potential of the parking lot trees. 15. ^ copy of the Grading Plan shall be submitted and approved by the Planning Department. R:XD PX2001\01-0539 Gospel Recordings\Staff Report and COAs.doc 11 16. The applicant shall comply with the provisions of Chapter 8.24 of the Temecula Municipal Code (Habitat Conservation) by paying the appropriate fee set forth in that Ordinance or by providing documented evidence that the fees have already been paid. Prior to Issuance of Building Permit 17. A Consistency Check fee shall be paid per the City of Temecula Fee Schedule. 18. Throe (3) copies of Construction Landscaping and Irrigation Plans shall be reviewed and approved by the Community Development Department - Planning Division. These plans shall conform substantially with the approved Exhibit "H", or as amended by these conditions. The location, number, genus, species, and container size of the plants shall be shown. The plans shall be consistent with the Water Efficient Ordinance. The plans shall be accompanied by the following items: a. Appropriate filing fee (per the City of Temecula Fee Schedule at time of submittal). b. One (1) copy of the approved grading plan. c. Water usage calculations per Chapter 17.32 of the Development Code (Water Efficient Ordinance). d. Total cost estimate of plantings and irrigation (in accordance with the approved plan). 19. The final project site plan shall be modified so as to show a total of three flag poles on the project site. Prior to Building Occupancy 20. The property owner shall fully install all required landscaping and irrigation, and submit a landscape maintenance bond in a form and amount approved by the Planning Department for a period of one-year from the date of the first occupancy permit. DEPARTMENT OF PUBLIC WORKS Unless otherwise noted, all conditions shall be completed by the Developer at no cost to any Government Agency. It is understood that the Developer correctly shows on the site plan ail existing and proposed property lines, easements, traveled ways, improvement constraints and drainage courses, and their omission may require the project to be resubmitted for further review and revision. General Requirements 21. A Grading Permit for precise grading, including all on-site flat work and improvements, shall be obtained from the Department of Public Works prior to commencement of any construction outside of the City-maintained stroet right-of-way. 22. An Encroachment Permit shall be obtained from the Department of Public Works prior to commencement of any construction within an existing or proposed City right-of-way. 23. All grading plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site and shall be submitted on standard 24" x 36" City of Temecula mylars. Prior to Issuance of a Grading Permit 24. A permit from Riverside County Flood Control and Water Conservation District is required for work within their right-of-way. R:~D PX2001\01-0539 Gospel Recordings,Staff Report'and COAs.doc 12 25. A Grading Plan shall be prepared by a registered Civil Engineer and shall be reviewed and approved bythe Department of Public Works. The grading plan shall include all necessary erosion control measures needed to adequately protect adjacent public and private property. 26. The Developer shall post security and enter into an agreement guaranteeing the grading and erosion control improvements in conformance with applicable City Standards and subject to approval by the Department of Public Works. 27. A Soil Report shall be prepared by a registered Soil or Civil Engineer and submitted to the Director of the Department of Public Works with the initial grading plan check. The report shall address all soils conditions of the site, and provide recommendations for the construction of engineered structures and pavement sections. 28. The Developer must comply with the requirements of the National Pollutant Discharge Elimination System (NPDES) permit from the State Water Resources Control Board. No grading shall be permitted until an NPDES Notice of Intent (NOI) has been filed or the project is shown to be exempt. 29. The Developer shall have a Drainage Study prepared by a registered Civil Engineer in accordance with City Standards identifying storm water runoff expected from this site and upstream of this site. The study shall identify all existing or proposed public or private drainage facilities intended to discharge this runoff. The study shall also analyze and identify impacts to downstream properties and provide specific recommendations to protect the properties and mitigate any impacts. Any upgrading or upsizing of downstream facilities, including acquisition of drainage or access easements necessary to make required improvements, shall be provided by the Developer. 30. As deemed necessary by the Director of the Department of Public Works, the Developer shall receive written clearance from the following agencies: a. San Diego Regional Water Quality Control Board b. Riverside County Flood Control and Water Conservation District c, Planning Department d. Department of Public Works e. Rancho California Water District 31. The Developer shall comply with all constraints which may be shown upon an Environmental Constraint Sheet (ECS) recorded with any underlying maps related to the subject property. 32. Permanent landscape and irrigation plans shall be submitted to the Planning Department and the Department of Public Works for review and approval. 33. The Developer shall obtain any necessary letters of approval or slope easements for off-site work performed on adjacent properties as directed by the Department of Public Works. 34. A flood mitigation charge shall be paid. The Area Drainage Plan fee is payable to the Riverside County Flood Control and Water Conservation District by either cashier's check or money order, prior to issuance of permits, based on the prevailing area drainage plan fee. If the full Area Drainage Plan fee or mitigation charge has already been credited to this properb/, no new charge needs to be paid. Prior to Issuance of a Building Permit 35. Precise grading plans shall conform to applicable City of Temecula Standards subject to approval by the Director of the Department of Public Works. The following design criteria shall be observed: RAD PL2001\01-0539 Gospel RecordingskSlaff Report and COAs.doc 13 a. Flowline grades shall be 0.5% minimum over P.C.C. and 1.00% minimum over A.C. paving. b. Driveways shall conform to the applicable City of Temecula Standard No. 207A. c. All street and driveway centerline intersections shall be at 90 degrees. d. Landscaping shall be limited in the corner cut-off area of all intersections and adjacent to driveways to provide for minimum sight distance and visibility. e. All concentrated drainage directed towards the public street shall be conveyed through undersidewalk drains. 36. A construction area Traffic Control Plan shall be designed by a registered Civil or Traffic Engineer and reviewed by the Director of the Department of Public Works for any street closure and detour or other disruption to traffic circulation as required by the Department of Public Works. 37. The building pad shall be certified to have been substantially constructed in accordance with the approved Precise Grading Plan by a registered Civil Engineer, and the Soil Engineer shall issue a Final Soil Report addressing compaction and site conditions. 38. The Developer shall pay to the City the Public Facilities Development Impact Fee as required by, and in accordance with, Chapter 15.06 of the Temecula Municipal Code and all Resolutions implementing Chapter 15.06. Prior to Issuance of a Certificate of Occupancy 39. As deemed necessary by the Department of Public Works, the Developer shall receive written clearance from the following agencies: a. Rancho California Water District b. Eastern Municipal Water District c. Department of Public Works 40. All public improvements shall be constructed and completed per the approved plans and City standards to the satisfaction of the Director of the Department of Public Works. 41. The existing improvements shall be reviewed. Any appurtenance damaged or broken shall be repaired or removed and replaced to the satisfaction of the Director of the Department of Public Works. FIRE DEPARTMENT 42. Final fire and life safety conditions will be addressed when building plans are reviewed by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC), and related codes which are in force at the time of building plan submittal. 43. The Fire Prevention Bureau is required to set a minimum fire flow for the remodel or construction of all commercial buildings per CFC Appendix III.A, Table A-III-A-1. The developer shall provide for this project, a water system capable of delivering 1875 GPM at 20-PSI residual operating pressure, plus an assumed sprinkler demand of 850 GPM for a total fire flow of 2725 GPM with a 3-hour duration. The required fire flow may be adjusted during the approval process to reflect changes in design, construction type, or automatic fire protection measures as approved by the Fire Prevention Bureau. The Fire Flow as given above has taken into account all information as provided. (CFC 903.2, Appendix Ill-A) R:kD P~2001\01-0539 Gospel Recordings~Staff Report and COAs.doc 44. The Fire Prevention Bureau is required to set minimum fire hydrant distances per CFC Appendix Ill-B, Table A-III-B-I. A minimum of 4 hydrants, in a combination of on-site and off- site (6" x 4" x 2-2 1/2" outlets) shall be located on Fire Department access roads and adjacent public streets. Hydrants shall be spaced at 350 feet apart, at each intersection and shall be located no more than 210 feet from any point on the street or Fire Department access nad(s) frontage to a hydrant. The required fire flow shall be available from any adjacent hydrant(s) in the system. The upgrade of existing fire hydrants may be required. (CFC 903.2, 903.4.2, and Appendix Ill-B) 45. As required by the California Fire Code, when any portion of the facility is in excess of 150 feet from a water supply on a public street, as measured by an approved route around the exterior of the facility, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided. For this project on site fire hydrants are required. (CFC 903.2) 46. If construction is phased, each phase shall provide approved access and fire protection prior to any building construction. (CFC 8704.2 and 902.2.2) 47. Prior to building construction, all locations where structures are to be built shall have approved temporary Fire Department vehicle access roads for use until permanent roads are installed. Temporary Fire Department access roads shall be an all weather surface for 80,000 lbs. GVW. (CFC 8704.2 and 902.2.2.2) 48. Prior to building final, all locations where structures are to be built shall have approved Fire Department vehicle access roads to within 150 feet to any portion of the facility or any portion of an exterior wall of the building(s). Fire Department access reads shall be an all weather surface designed for 80,000 lbs. GVW with a minimum AC thickness of .25 feet. ( CFC sec 902) 49. Fire Department vehicle access roads shall have an unobstructed width of not less than twenty-four (24) feet and an unobstructed vertical clearance of not less than thirteen (13) feet six (6) inches. (CFC 902.2.2.1) 50. The gradient for fire apparatus access roads shall not exceed fifteen (15) percent. (CFC 902.2.2.8 Ord. 99-14) 51. Prior to building construction, dead end roadways and streets in excess of one hundred and fifty (150) feet which have not been completed shall have a turnaround capable of accommodating fire apparatus. (CFC 902.2.2.4) 52. Prior to issuance of building permits, the developer shall furnish one copy of the water system plans to the Fire Prevention Bureau for approval prior to installation. Plans shall be signed by a registered civil engineer; conlain a Fire Prevention Bureau approval signature block; and conform to hydrant type, location, spacing and minimum fire flow standards. After the plans are signed by the local water company, the originals shall be presented to the Fire Prevention Bureau for signatures. The required water system including fire hydrants shall be installed and accepted by the appropriate water agency prior to any combustible building materials being placed on an individual lot. (CFC 8704.3, 901.2.2.2 and National Fire Protection Association 24 1-4.1 ) 53. Prior to issuance of a Certificate of Occupancy or building final, "Blue Reflective Markers" shall be installed to identify fire hydrant locations. (CFC 901.4.3) 54. Prior to issuance of a Certificate of Occupancy or building final, approved numbers or addresses shall be provided on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall be of a contrasting color to their background. Commemial, multi-family residential and industrial buildiqgs shall have a minimum twelve (12) inches numbers with suite numbers a minimum R:'d) P~2001\01-0539 Gospel Recordings\Staff Report and COAs.doc 15 of six (6) inches in size. All suites shall have a minimum of six (6) inch high letters and/or numbers on both the front and rear doors. Single-family residences and multi-family residential units shall have four (4) inch letters and/or numbers, as approved by the Fire Prevention Bureau. (CFC 901.4.4) 55. Prior to issuance of Certificate of Occupancy or building final, based on square footage and type of construction, occupancy or use, the developer shall install a fire sprinkler system. Fire sprinkler plans shall be submitted to the Fire Prevention Bureau for approval prior to installation. (CFC Article 10, CBC Chapter 9) 56. Prior to issuance of Certificate of Occupancy or building final, based on a requirement for monitoring the sprinkler system, occupancy or use, the developer shall install an fire alarm system monitored by an approved Underwriters Laboratory listed central station. Plans shall be submitted to the Fire Prevention Bureau for approval prior to installation. (CFC Article 10) 57. Prior to the issuance of a Certificate of Occupancy or building final, a "Knox-Box" shall be provided. The Knox-Box shall be installed a minimum of six (6) feet in height and be located to the right side of the main entrance door. (CFC 902.4) 58. All manual and electronic gates on required Fire Department access roads or gates obstructing Fire Department building access shall be provided with the Knox Rapid entry system for emergency access by fire fighting personnel. (CFC 902.4) 59. Prior to final inspection of any building, the applicant shall prepare and submit to the Fire Department for approval, a site plan designating Fire Lanes with appropriate lane painting and or signs. 60. Prior to the issuance of a Certificate of Occupancy, building final or occupancy, buildings housing high-piled combustible stock shall comply with the provisions of Uniform Fire Code Article 81 and all applicable National Fire Protection Association standards. The storage of high-piled combustible stock may require structural design considerations or modifications to the building. Fire protection and life safety features may include some or all of the following: an automatic fire sprinkler system(s) designed for a specific commodity class and storage arrangement, hose stations, alarm systems, smoke vents, draft curtains, Fire Department access doors and Fire department access roads. (CFC Article 81 ) Special Conditions 61. Prior to building permit issuance, a full technical report may be required to be submitted and to the Fire Prevention Bureau. This report shall address, but not be limited to, all fire and life safety measures per 1998 CFC, 1998 CBC, and NFPA - 13, 24, 72 and 231-C. 62. Prior to issuance of a Certificate of Occupancy or building final a simple plot plan and a simple floor plan, each as an electronic file of the .DWG format must be submitted to the Fire Prevention Bureau. Alternative file formats may be acceptable, contact fire prevention for approval. 63. The applicant shall comply with the requirements of the Fire Code permit process and update any changes in the items and quantities approved as part of their Fire Code permit. These changes shall be submitted to the Fire Prevention Bureau for review and approval per the Fire Code and is subject to inspection. (CFC 105) 64. The applicant shall submit for review and approval by the Riverside County Department of Environmental Health and City Fire Department an update to the Hazardous Material Inventory Statement and Fire Department Technical Report on file at the city; should any quantities used or stored onsite increase or should changes to operation introduce any additional hazardous material not listed in existing reports. (CFC Appendix II-E) R:~D P~2001\O1-0539 Gospel Recordings\Staff Report and COAs.doc COMMUNITY SERVICES 65. All perimeter landscaping and parkways shall be maintained by the property owner or private maintenance association. 66. The developer shall contact the City's franchised solid waste hauler for disposal of construction debris. Only the City's franchisee may haul construction debris. 67. The developer shall provide adequate space for a recycling bin within the trash enclosure area. 68. The applicant shall provide both temporary (during construction) and permanent protection of Santa Gertrudis Creek against runoff, silt, sand and other debris that may drain into the creek. BUILDING AND SAFETY 69. All design components shall comply with applicable provisions of the 1998 edition of the California Building, Plumbing and Mechanical Codes; 1998 National Electrical Code; California Administrative Code, Title 24 Energy and Disabled Access Regulations and the Temecula Municipal Code. 70. Submit at time of plan review, a complete exterior site lighting plans showing compliance with Ordinance No. 655 for the regulation of light pollution. All streetlights and other outdoor lighting shall be shown on electrical plans submitted to the Department of Building and Safety. Any outside lighting shall be hooded and directed so as not to shine directly upon adjoining property or public rights-of-way. 71. A receipt or clearance letter from the Temecula Valley School District shall be submitted to the Building & Safety Department to ensure the payment or exemption from School Mitigation Fees. 72. Obtain all building plans and permit approvals prior to commencement of any construction work. 73. Obtain street addressing for all proposed buildings prior to submittal for plan review. 74. Disabled access from the public way to the main entrance of the building is required. The path of travel shall meet the California Disabled Access Regulations in terms of cross slope, travel slope stripping and signage. Provide all details on plans. (California Disabled Access Regulations effective April 1, 1998) 75. All building and facilities must comply with applicable disabled access regulations. Provide ali details on plans. (California Disabled Access Regulations effective April 1, 1998) 76. Provide disabled access from the public way to the main entrance of the building. 77. Provide van accessible parking located as close as possible to the main entry. 78. Show path of accessibility from parking to furthest point of improvement. 79. Provide house electrical meter provisions for power for the operation of exterior lighting, fire alarm systems. 80. Restroom fixtures, number and type, to be in accordance with the provisions of the 1998 edition of the California Building Code Appendix 29. Obtain the Division of the State Architect recommendation for the accessible restroom dimensions for toddlers from the Building Official, to implement in the building design. 81. Provide an approved automatic fire sprinkler system. R:~,D P~2001\01-0539 Gospel Recordings\Staff Report and COAs.doc 17 82. Provide appropriate stamp of a registered professional with original signature on plans pdor to permit issuance. 83. Provide electrical plan including load calculations and panel schedule, plumbing schematic and mechanical plan for plan review. 84. Truss calculations that are stamped by the engineer of record and the truss manufacturer engineer are required for plan review submittal. 85. Provide precise grading plan for plan check submittal to check for handicap accessibility. 86. A pro-construction meeting is required with the building inspector prior to the start of the building construction. 87. Trash enclosures, patio covers, light standard and any block walls if not on the approved building plans, will require separate approvals and permits. 88. Show all building setbacks. 89. Signage shall be posted conspicuously at the entrance to the project that indicates the hours of construction, shown below, as allowed by the City of Temecula Ordinance No. 0-90-04, specifically Section G (1) of Riverside County Ordinance No. 457.73, for any site within one- quarter mile of an occupied residence. Monday-Friday 6:30 a.m. - 6:30 p.m. Saturday 7:00 a.m. - 6:30 p.m. No work is permitted on Sunday or Government Holidays POLICE DEPARTMENT 90. The construction plans shall indicate the application of painted rooftop addressing plotted on a 9-inch grid pattern with 45-inch tall numerals spaced 9-inch apart. The numerals shall be painted with a standard 9-inch paint roller using fluorescent yellow paint applied over a contrasting background. The address shall be oriented to the street and placed as closely as possible to the edge of the building closest to the street. OUTSIDE AGENCIES 91. The applicant shall comply with the attached letter dated November 14, 2001 from the California Historical Resources Information System. 92. The applicant shall comply with the attached letter dated November 7, 2001 from Rancho Water. 93. The applicant shall comply with the attached letter dated November 14, 2001 from County of Riverside Department of Environmental Health. By placing my signature below, I confirm that I have read, understand and accept all the above Conditions of Approval. I further understand that the property shall be maintained in conformance with these conditions of approval and that any changes I may wish to make to the project shall be subject to Community Development Department approval. Applicant's Signature Name printed Date R:~D P~2001\01-0539 Gospel Recordings~Staff Report and COAs.doc 18