HomeMy WebLinkAbout071719 PC Agenda DRAFT PLANNING COMMISSION RESOLUTION PC RESOLUTION NO. 19- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA18-1529, A MODIFICATION TO A PREVIOUSLY APPROVED DEVELOPMENT PLAN (PA15- 1572) FOR AN APPROXIMATELY 1,389 SQUARE FOOT DRIVE-THRU RESTAURANT AND AN APPROXIMATELY 6,281 SQUARE FOOT RETAIL BUILDING LOCATED ON THE SOUTHWEST CORNER OF TEMECULA PARKWAY AND MAHLON VAIL ROAD, AND MAKING A FINDING OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) Section 1. Procedural Findings. The Planning Commission of the City of Temecula does hereby find, determine and declare that: A. On July 6, 2016, the City of Temecula Planning Commission approved PA15-1572, a Development Plan and PA15-1573, a Conditional Use Permit, to allow for the construction of two (2) fast-food drive-thru restaurants and one (1) express car wash within the Vail Ranch Town Center. B. On November 13, 2018, Donnie DeWees and Randy Morine filed Planning Application No. PA18-1529 a Modification to the previously approved Development Plan in a manner in accord with the City of Temecula General Plan and Development Code. C. The Application was processed including, but not limited to a public notice, in the time and manner prescribed by State and local law. D. The Planning Commission, at a regular meeting, considered the Application and environmental review on July 17, 2019, at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to and did testify either in support or in opposition to this matter. E. At the conclusion of the Planning Commission hearing and after due consideration of the testimony, the Planning Commission approved Planning Application No. PA18-1529, subject to and based upon the findings set forth hereunder. F. All legal preconditions to the adoption of the Resolution have occurred. Section 2. Further Findings. The Planning Commission, in approving the Modification to the Development Plan Application hereby finds, determines and declares that: Modification, Development Code Section 17.05.010.F A. The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City; The proposed project consists of a drive thru restaurant and retail building. The General Plan and Vail Ranch Specific Plan allow for restaurant and retail uses at the project site. Therefore, the project is consistent with the General Plan for Temecula. The project, as conditioned, is also consistent with other applicable requirements of State law and local Ordinances, including the California Environmental Quality Act (CEQA), the Citywide Design Guidelines, and Fire and Building codes. B. The overall development of the land is designed for the protection of the public health, safety, and general welfare; As conditioned, the project will meet all requirements of the Development Code, General Plan, and Building and Fire Codes, which provide safeguards for the health, safety and general welfare of the community and the overall design of the site, building, landscaping, parking, circulation and other associated site improvements, is consistent with, and intended to protect the health and safety of those working in and around the site. The project has been reviewed for and has been found to be consistent with all applicable policies, guidelines, standards and regulations intended to ensure that the development will be constructed and function in a manner consistent with the protection of the public health, safety, and welfare. Section 3. Environmental Findings. The Planning Commission hereby makes the following environmental findings and determinations in connection with the approval of the Modification: A. In accordance with the California Environmental Quality Act, the proposed project has been deemed to be categorically exempt from further environmental review (Section 15332, In-Fill Development Projects); The project meets all General Plan and Zoning policies and regulations and is located within City limits on a site of no more than five acres. The site is also surrounded by development and is able to be serviced by all required utilities and public services. The project site has no value as habitat for endangered, rare or threatened species. The project is not anticipated to result in any significant effects relating to traffic, noise, air quality, or water quality as the project, as conditioned, is an allowed use per the City of Temecula General Plan. Furthermore, the supplemental development standards for drive-thru facilities requires a minimum stacking area behind the menu board to accommodate six cars. The project proposes a stacking area of twelve cars. Section 4. Conditions. The Planning Commission of the City of Temecula approves Planning Application No. PA18-1529, a Modification to a previously approved Development Plan (PA15-1572) for an approximately 1,389 square foot drive-thru restaurant and an approximately 6,281 square foot retail building located on the southwest corner of Temecula Parkway and Mahlon Vail Road, and makes a finding of exemption under the California Environmental Quality Act (CEQA), subject to the Conditions of Approval set forth on Exhibit A, attached hereto, and incorporated herein by this reference. Section 5. PASSED, APPROVED AND ADOPTED by the City of Temecula Planning Commission this 17th day of July, 2019. Gary Watts, Chairperson ATTEST: Luke Watson Secretary \[SEAL\] STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE )ss CITY OF TEMECULA ) I, Luke Watson, Secretary of the Temecula Planning Commission, do hereby certify that the forgoing PC Resolution No. 19- was duly and regularly adopted by the Planning Commission of the City of Temecula at a regular meeting thereof held on the 17th day of July, 2019, by the following vote: AYES: PLANNING COMMISSIONERS: NOES: PLANNING COMMISSIONERS: ABSENT: PLANNING COMMISSIONERS: ABSTAIN: PLANNING COMMISSIONERS: Luke Watson Secretary EXHIBIT A DRAFT CONDITIONS OF APPROVAL EXHIBIT A CITY OF TEMECULA DRAFT CONDITIONS OF APPROVAL Planning Application No.: PA18-1529 Project Description: A Modification to a previously approved Development Plan (PA15-1572) for an approximately 1,389 square foot drive-thru restaurant and an approximately 6,281 square foot retail building located on the southwest corner of Temecula Parkway and Mahlon Vail Road 960-020-076, 960-020-077 Assessor's Parcel No.: Commercial MSHCP Category: Retail Commercial DIF Category: TUMF Category: Retail Commercial Quimby Category: N/A (non-residential) N/A (project not within Uptown Temecula Specific Plan area) New Street In-lieu of Fee: Approval Date: July 17, 2019 July 17, 2022 Expiration Date: PLANNING DIVISION Within 48 Hours of the Approval 1. Filing Notice of Exemption. The applicant/developer shall deliver to the Planning Division a cashiers check or money order made payable to the County Clerk in the amount of Fifty Dollars ($50.00) for the County administrative fee, to enable the City to file the Notice of Exemption as provided under Public Resources Code Section 21152 and California Code of Regulations Section 15062. If within said 48-hour period the applicant/ developer has not delivered to the Planning Division the check as required above, the approval for the project granted shall be void by reason of failure of condition (Fish and Wildlife Code Section 711.4(c)). General Requirements 2.Indemnification of the City. The applicant and owner of the real property subject to this condition shall hereby agree to indemnify, protect, hold harmless, and defend the City and its attorneys from any and all claims, actions, awards, judgments, or proceedings against the City to attack, set aside, annul, or seek monetary damages resulting, directly or indirectly, from any action in furtherance of and the approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board or legislative body including actions approved by the voters of the City, concerning the Planning Application. The City shall be deemed for purposes of this condition, to include any agency or instrumentality thereof, or any of its elected or appointed officials, officers, employees, consultants, contractors, legal counsel, and agents. City shall promptly notify both the applicant and landowner of any claim, action, or proceeding to which this condition is applicable and shall further cooperate fully in the defense of the action. The City reserves the right to take any and all action the City deems to be in the best interest of the City and its citizens in regards to such defense. 3. Expiration. This approval shall be used within three years of the approval date; otherwise, it shall become null and void. Use means the beginning of substantial construction contemplated by this approval within the three year period, which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval, or use of a property in conformance with a Conditional Use Permit. 4. Time Extension. The Director of Community Development may, upon an application being filed prior to expiration, and for good cause, grant a time extension of up to five extensions of time, one year at a time. 5. Consistency with Specific Plans. This project and all subsequent projects within this site shall be consistent with Specific Plan No. 10 (Vail Ranch). 6. Conformance with Approved Plans. The development of the premises shall substantially conform to the approved site plan and elevations contained on file with the Planning Division. 7. Signage Permits. A separate building permit shall be required for all signage. 8. Landscape Maintenance. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Director of Community Development. If it is determined that the landscaping is not being maintained, the Director of Community Development shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. 9. Graffiti. All graffiti shall be removed within 24 hours on telecommunication towers, equipment, walls, or other structures. 10. Burrowing Owl Study Submittal. A Burrowing Owl Study shall be submitted prior to plan check approval for the grading permit. If construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. 11. Water Quality and Drainage. Other than stormwater, it is illegal to allow liquids, gels, powders, sediment, fertilizers, landscape debris, and waste from entering the storm drain system or from leaving the property. To ensure compliance with this Condition of Approval: a. Spills and leaks shall be cleaned up immediately. b. Do not wash, maintain, or repair vehicles onsite unless as part of the car wash activities of Phase I. c. Do not hose down parking areas, sidewalks, alleys, or gutters. d. Ensure that all materials and products stored outside are protected from rain. e. Ensure all trash bins are covered at all times. 12. Materials and Colors. The Conditions of Approval specified in this resolution, to the extent specific items, materials, equipment, techniques, finishes or similar matters are specified, shall be deemed satisfied by City staff's prior approval of the use or utilization of an item, material, equipment, finish or technique that City staff determines to be the substantial equivalent of that required by the Conditions of Approval. Staff may elect to reject the request to substitute, in which case the real party in interest may appeal, after payment of the regular cost of an appeal, the decision to the Planning Commission for its decision. Material Color Stucco Parchment Paper (DE5329) Stucco Pasta (DE5331) Stucco Fine Grain (DE6213) Stucco Hot Jazz (DEA107) Stucco Warm and Toasty (DE646) Stucco Red River (DE5125) Stucco Saddle Brown (DE5264) Stucco Whisper (DEW340) Stucco Lighthouse (DEW385) Stucco Brown Eyes (DE5265) Tile Solar Summit (AY01) Roof Tile Madera Blend Steel Canopy Madison Industries 13. Modifications or Revisions. The permittee shall obtain City approval for any modifications or revisions to the approval of this project. 14. Trash Enclosures. The trash enclosures shall be large enough to accommodate a recycling bin, as well as regular solid waste containers. 15. Trash Enclosures. Trash enclosures shall be provided to house all trash receptacles utilized on the site. These shall be clearly labeled on the site plan. 16. Covered Trash Enclosures. All trash enclosures on site shall include a solid cover and the construction plans shall include all details of the trash enclosures, including the solid cover. 17. Reciprocal Use Agreement. Parking for the project shall be shared across the site, including parking spaces in all lots that are a part of the project. If the project involves multiple lots, the applicant shall submit to the Planning Division a copy of a recorded Reciprocal Use Agreement, which provides for cross-lot access and parking across all lots. 18.Phased Construction. If construction is phased, a construction staging area plan or phasing plan for construction equipment and trash shall be approved by the Director of Community Development. 19. Previous Conditions of Approval. All previous Conditions of Approval from PA15-1572 shall remain in full effect unless superseded herein. 20. Construction and Demolition Debrisised solid waste hauler for disposal of construction and demolition debris and shall provide the Planning Division construction and demolition debris. Only the construction debris. 21. Public Art Ordinance Ordinance as defined in Section 5.08 of the Temecula Municipal Code. 22. Property Maintenance. All parkways, including within the right-of-way, entryway median, landscaping, walls, fencing, recreational facilities, and on-site lighting shall be maintained by the property owner or maintenance association. Prior to Issuance of Grading Permit 23. Placement of Transformer. Provide the Planning Division with a copy of the underground water plans and electrical plans for verification of proper placement of transformer(s) and double detector check valves prior to final agreement with the utility companies. 24. Placement of Double Detector Check Valves. Double detector check valves shall be installed at locations that minimize their visibility from the public right-of-way, subject to review and approval by the Director of Community Development. 25. Archaeological/Cultural Resources Grading Note. The following shall be included in the Notes archaeological/cultural resources, or any artifacts or other objects which reasonably appears to be evidence of cultural or archaeological resource are discovered, the property owner shall immediately advise the City of such and the City shall cause all further excavation or other disturbance of the affected area to immediately cease. The Director of Community Development at his/her sole discretion may require the property owner to deposit a sum of money it deems reasonably necessary to allow the City to consult and/or authorize an independent, fully qualified specialist to inspect the site at no cost to the City, in order to assess the significance of the find. Upon determining that the discovery is not an archaeological/ cultural resource, the Planning Director shall notify the property owner of such determination and shall authorize the resumption of work. Upon determining that the discovery is an archaeological/cultural resource, the Planning Director shall notify the property owner that no further excavation or development may take place until a mitigation plan or other correc 26.Cultural Resources Treatment Agreement. The developer is required to enter into a Cultural Resources Treatment Agreement with the Pechanga Tribe. The agreement shall be in place prior to issuance of a grading permit. To accomplish this, the applicant should contact the Pechanga Tribe no less than 30 days and no more than 60 days prior to issuance of a grading permit. This Agreement will address the treatment and disposition of cultural resources, the designation, responsibilities, and participation of professional Pechanga Tribal monitors during grading, excavation and ground disturbing activities; project grading and development scheduling; terms of compensation for the monitors; and treatment and final disposition of any cultural resources, sacred sites, and human remains discovered onsite. The Pechanga monitor's authority to stop and redirect grading will be exercised in consultation with the project archaeologist in order to evaluate the significance of any potential resources discovered on the property. Pechanga and archaeological monitors shall be allowed to monitor all grading, excavation and groundbreaking activities, and shall also have the limited authority to stop and redirect grading activities should an inadvertent cultural resource be identified. 27. Discovery of Cultural Resources. The following shall be included in the Notes Section of the nadvertent discoveries), all work in the area of the find shall cease, and the qualified archaeologist and the 28. Tribal Monitoring Notes. The following shall be included in the Notes Section of the Grading grading activities, in consultation with the project archaeologist and their designated monitors, to evaluate the significance of any potential resources discovered on the property." 29. Relinquishment of Cultural Resources. The following shall be included in the Notes Section of the including all archaeological artifacts that are found on the project area, to the Pechanga Tribe for proper 30. Preservation of Sacred Sites. The following shall be included in the Notes Section of the Grading 31. MSHCP Pre-Construction Survey. A 30-day preconstruction survey, in accordance with MSHCP guidelines and survey protocol, shall be conducted prior to ground disturbance. The results of the 30-day preconstruction survey shall be submitted to the Planning Division prior to scheduling the pre-grading meeting with Public Works. If construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. 32.Burrowing Owl Grading Note. The following shall be included in the Notes Section of the -grading meeting with Public Works. All project sites containing suitable habitat for burrowing owls, whether owls were found or not, require a 30-day preconstruction survey that shall be conducted within 30 days prior to ground disturbance to avoid direct take of burrowing owls. If the results of the survey indicate that no burrowing owls are present on-site, then the project may move forward with grading, upon Planning Division approval. If burrowing owls are found to be present or nesting on-site during the preconstruction survey, then the following recommendations must be adhered to: Exclusion and relocation activities may not occur during the breeding season, which is defined as March 1 through August 31, with the following exception: From March 1 through March 15 and from August 1 through August 31 exclusion and relocation activities may take place if it is proven to the City and appropriate regulatory agencies (if any) that egg laying or chick construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. 33. Precise Grading Plans. A copy of the Precise Grading Plans shall be submitted and approved by the Planning Division. Prior to Issuance of Building Permit 34. Transportation Uniform Mitigation Fee (TUMF). The Western Riverside County of Governments administers and collects the Transportation Uniform Mitigation Fee (TUMF). The City of Temecula adopted an ordinance on March 31, 2003 for a Riverside County area wide Transportation Uniform Mitigation Fee (TUMF). This project is subject to payment of these fees at the time of building permit issuance (paid to WRCOG). The fees are subject to the provisions of Chapter 15.08 of the Temecula Municipal Code and the fee schedule in effect at the time of building permit issuance. Additional information on payment, fees, and points of contact can be found at http://www.wrcog.cog.ca.us/174/TUMF 35. Development Impact Fee (DIF). The developer shall comply with the provisions of Title 15, Chapter 15.06 of the Temecula Municipal Code and all its resolutions by paying the appropriate City fee. 36. Construction Landscaping and Irrigation Plans. Four (4) copies of Construction Landscaping and Irrigation Plans shall be reviewed and approved by the Planning Division. These plans shall be submitted as a separate submittal, not as part of the building plans or other plan set. These plans shall conform to the approved conceptual landscape plan, or as amended by these conditions. The location, number, height and spread, water usage or KC value, genus, species, and container size of the plants shall be shown. The plans shall be consistent with the Water Efficient Ordinance and Water Storage Contingency Plan per the Rancho California Water District. The plans shall be accompanied by the appropriate filing fee (per the City of Temecula Fee Schedule at time of submittal) and one copy of the approved Grading Plan. 37.Landscaping Site Inspections. The Landscaping and Irrigation Plans shall include a note stating, te inspections are required. The first inspection will be conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection will verify property landscape maintenance for release of the one-year inspections. 38. Agronomic Soils Report. The Landscaping and Irrigation Plans shall include a note on the plans 39. Water Usage Calculations. The Landscaping and Irrigation Plans shall include water usage calculations per Chapter 17.32 of the Development Code (Water Efficient Ordinance), the total cost estimate of plantings and irrigation (in accordance with approved plan). Applicant shall use evapotranspiration (ETo) factor of 0.70 for calculating the maximum allowable water budget. 40. Landscape Maintenance Program. A landscape maintenance program shall be submitted to the Planning Division for approval. The landscape maintenance program shall detail the proper maintenance of all proposed plant materials to assure proper growth and landscape development for the long-term esthetics of the property. The approved maintenance program shall be provided to the landscape maintenance contractor who shall be responsible to carry out the detailed program. 41. Specifications of Landscape Maintenance Program. Specifications of the landscape maintenance conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection will verify property landscape maintenance for release of the one-pplicant/owner shall contact the Planning Division to schedule inspections. 42. Irrigation. The landscaping plans shall include automatic irrigation for all landscaped areas and complete screening of all ground mounted equipment from view of the public from streets and adjacent property for private common areas; front yards and slopes within individual lots; shrub planting to completely screen perimeter walls adjacent to a public right-of-way equal to 66 feet or larger; and, all landscaping excluding City maintained areas and front yard landscaping which shall include, but may not be limited to, private slopes and common areas. 43. Precise Grading Plans. Precise Grading Plans shall be consistent with the approved rough grading plans including all structural setback measurements. 44.Landscaping Requirement for Phased Development. If any phase or area of the project site is not scheduled for development within six months of the completion of grading, the landscaping plans shall indicate it will be temporarily landscaped and irrigated for dust and soil erosion control. 45. WQMP Landscape Compliance. The construction landscape plans shall be consistent with Appendix A, Table 31 of the Low Impact Development (LID) Manual for Southern California for plant materials and treatment facilities, and shall reference the approved precise grading plan for WQMP features. 46. Utility Screening. All utilities shall be screened from public view. Landscape construction drawings shall show and label all utilities and provide appropriate screening. Provide a three-foot clear zone around fire check detectors as required by the Fire Department before starting the screen. Group utilities together in order to reduce intrusion. Screening of utilities is not to look like an after-thought. Plan planting beds and design around utilities. Locate all light poles on plans and ensure that there are no conflicts with trees. Prior to Release of Power, Building Occupancy or Any Use Allowed by This Permit 47. Screening of Loading Areas. The applicant shall be required to screen all loading areas and roof mounted mechanical equipment from view of the adjacent residences and public right-of-ways. If upon final inspection it is determined that any mechanical equipment, roof equipment or backs of building parapet walls are visible from any portion of the public right-of-way adjacent to the project site, the developer shall provide screening by constructing a sloping tile covered mansard roof element or other screening reviewed and approved by the Director of Community Development. 48. Landscape Installation Consistent with Construction Plans. All required landscape planting and irrigation shall have been installed consistent with the approved construction plans and shall be in a condition acceptable to the Director of Community Development. The plants shall be healthy and free of weeds, disease, or pests. The irrigation system shall be properly constructed and in good working order. 49. Performance Securities. Performance securities, in amounts to be determined by the Director of Community Development, to guarantee the maintenance of the plantings in accordance with the approved construction landscape and irrigation plan, shall be filed with the Planning Division for a period of one year from final Certificate of Occupancy. After that year, if the landscaping and irrigation system have been maintained in a condition satisfactory to the Director of Community Development, the bond shall be released upon request by the applicant. 50. Installation of Site Improvements. All site improvements, including but not limited to, parking areas and striping shall be installed. 51. Compliance with Conditions of Approval. All of the foregoing conditions shall be complied with prior to occupancy or any use allowed by this permit. PUBLIC WORKS DEPARTMENT General Requirements 52. Conditions of Approval. The developer shall comply with all Conditions of Approval, the Engineering and Construction Manual and all City codes/standards at no cost to any governmental agency. 53.Entitlement Approval. The developer shall comply with the approved site plan, the conceptual Water Quality Management Plan (WQMP) and other relevant documents approved during entitlement. Any significant omission to the representation of site conditions may require the plans to be resubmitted for further review and revision. 54. Precise Grading Permit. A precise grading permit for on site improvements (outside of public right-of-way) shall be obtained from Public Works. 55. Haul Route Permit. A haul route permit may be required when soils are moved on public roadways to or from a grading site. The developer/contractor is to verify if the permit is required. If so, he ngineering and Construction Manual and as directed by Public Works. 56. Encroachment Permits. Prior to commencement of any applicable construction, encroachment permit(s) are required; and shall be obtained from Public Works for public offsite improvements. Prior to Issuance of a Grading Permit 57. Environmental Constraint Sheet (ECS). The developer shall comply with all constraints per the recorded ECS with any underlying maps related to the subject property. 58. Required Clearances. As deemed necessary by Public Works, the developer shall receive written clearances/permits from applicable agencies such as: a. Verizon; b. Rancho California Water District; c. Eastern Municipal Water District; and other affected agencies. 59. Grading/Erosion & Sediment Control Plan. The developer shall submit a grading/erosion & sediment control plan(s) to be reviewed and approved by Public Works. All plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site. The approved plan shall include all construction-phase pollution-prevention controls to adequately address non- at: www.TemeculaCA.gov/ECM 60. Erosion & Sediment Control Securities. The developer shall comply with the provisions of Chapter 24, Section 18.24.140 of the Temecula Municipal Code by posting security and entering into an agreement to guarantee the erosion & sediment control improvements. 61. NPDES General Permit Compliance. The developer shall obtain project coverage under the State National Pollutant Discharge Elimination System (NPDES) General Permit for Construction Activities and shall provide the following: a. A copy of the Waste Discharge Identification Number (WDID) issued by the State Water Resources Control Board (SWRCB); b. c. The name, contact information and certification number of the Qualified SWPPP Developer (QSD) Pursuant to the State Water Resources Control water ordinance, a Storm Water Pollution Prevention Plan (SWPPP) shall be generated and submitted to the Board. Throughout the project duration, the SWPPP shall be routinely updated and readily available (onsite) to the State and City. Review www.cabmphandbooks.com for SWPPP guidelines. Refer to the following link: http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.shtml 62.Water Quality Management Plan (WQMP) and O&M Agreement. The developer shall submit a final WQMP (prepared by a registered professional engineer) with the initial grading plan submittal, based on the conceptual WQMP from the entitlement process. It must receive acceptance by Public Works. A copy of the final project-specific WQMP must be kept onsite at all times. In addition, a completed WQMP Operation and Maintenance (O&M) Agreement shall be submitted for review and approval. Upon approval from City staff, the applicant shall record the O&M agreement at the County Recorder's Office in Temecula. Refer to the WQMP template and agreement link below: www.TemeculaCA.gov/WQMP 63. Drainage. All applicable drainage shall be depicted on the grading plan and properly accommodated with onsite drainage improvements and water quality facilities, which shall be privately maintained. Alterations to existing drainage patterns or concentration and/or diverting flows is not allowed unless the developer constructs adequate drainage improvements and obtains the necessary permissions from the downstream property owners. All drainage leaving the site shall be conveyed into a public storm drain system, if possible. The creation of new cross lot drainage is not permitted. 64. Soils Report. A soils report, prepared by a registered soil or civil engineer, shall be submitted to conditions and provide recommendations for the construction of engineered structures and preliminary pavement sections. 65. Geological Report requirements, recommendations and/or proposed Conditions of Approval as identified during entitlement. 66. Letter of Permission/Easement. The developer shall obtain documents (letters of permission or directed by, and shall be submitted to, Public Works for acceptance. The document information shall be noted on the approved grading plan. 67. American Disability Act. The developer shall ensure that all frontage areas to the proposed development within the public right of way are ADA compliant. Any sidewalk within the public right of way found to be non-compliant shall be the responsibility of the property owner to be removed and replaced with ADA compliant sidewalk per the Streets and Highway Code Section 5610. Prior to Issuance of Encroachment Permit(s) 68. Public Utility Agency Work. The developer shall submit all relevant documentation due to encroaching within City right-of-way; and is responsible for any associated costs and for making arrangements with each applicable public utility agency. 69. Traffic Control Plans. A construction area traffic control plan (TCP) will be required for lane closures and detours or other disruptions to traffic circulation; and shall be reviewed and approved by Public Works. The TCP shall be designed by a registered civil or traffic engineer in conformance with the latest edition of the Caltrans Manual on Uniform Traffic Control Devices (MUTCD) and City standards. 70. Street Trenching Paving Notes. Prior to Issuance of Building Permit(s) 71. Certifications. Certifications are required from the registered civil engineer-of-record certifying -of-record certifying compaction of the building pad(s). Prior to Issuance of a Certificate of Occupancy 72. Completion of Improvements. The developer shall complete all work per the approved plans and Conditions of Approval to the satisfaction of the City Engineer. This includes all on site work (including water quality facilities), public improvements and the executed WQMP Operation and Maintenance agreement. 73. Utility Agency Clearances. The developer shall receive written clearance from applicable utility agencies (i.e., Rancho California and Eastern Municipal Water Districts, etc.) for the completion of their respective facilities and provide to Public Works. 74. Replacement of Damaged Improvements/Monuments. Any appurtenance damaged or broken during development shall be repaired or removed and replaced to the satisfaction of Public Works. Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professional Code Section 8771. 75. Certifications. All necessary certifications and clearances from engineers, utility companies and public agencies shall be submitted as required by Public Works. BUILDING AND SAFETY DIVISION General Requirements 76. Final Building and Safety Conditions. Final Building and Safety conditions will be addressed when building construction plans are submitted to Building and Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. 77. Compliance with Code. All design components shall comply with applicable provisions of the 2016 edition of the California Building, Plumbing and Mechanical Codes; 2016 California Electrical Code; California Administrative Code, 2016 California Energy Codes, 2016 California Green Building Standards, California Title 24 Disabled Access Regulations, and City of Temecula Municipal Code. If complete plans are not submitted to Building & Safety by December 20, 2019, Design components shall comply with applicable provisions of the 2019 California Building, Plumbing, Electrical, Administrative, and Mechanical Codes; 2019 California Energy Codes, and 2019 California Green Building Standards. 78. ADA Access. Applicant shall provide details of all applicable disabled access provisions and building setbacks on plans to include: a. Disabled access from the public way to the main entrance of the building. b. Van accessible parking located as close as possible to the main entrance of the building. c. Accessible path of travel from parking to the furthest point of improvement. d. Path of accessibility from parking to furthest point of improvement. e. Accessible path of travel from public right-of-way to all public areas on site, such as trash enclosures, clubhouses, and picnic areas. 79. County of Riverside Mount Palomar Ordinance. Applicant shall submit, at time of plan review, a complete exterior site lighting plan showing compliance with County of Riverside Mount Palomar Ordinance Number 655 for the regulation of light pollution. All streetlights and other outdoor lighting shall be shown on electrical plans submitted to the Building and Safety Division. Any outside lighting shall be hooded and aimed not to shine directly upon adjoining property or public rights-of-way. All exterior LED light fixtures shall be 3,000 kelvin or below. 80.Street Addressing. Applicant must obtain street addressing for all proposed buildings by requesting street addressing and submitting a site plan for commercial or multi-family residential projects or a recorded final map for single-family residential projects. 81. Clearance from TVUSD. A receipt or clearance letter from the Temecula Valley Unified School District shall be submitted to the Building and Safety Department to ensure the payment or exemption from School Mitigation Fees. 82. Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work. 83. Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards, and any block walls will require separate approvals and permits. Solid covers are required over new and existing trash enclosures. 84. Sewer and Water Plan Approvals. On-site sewer and water plans will require separate approvals and permits. 85. Hours of Construction. Signage shall be prominently posted at the entrance to the project, indicating the hours of construction, as allowed by the City of Temecula Municipal Ordinance 9.20.060, for any site within one-quarter mile of an occupied residence. The permitted hours of construction are Monday through Saturday from 7:00 a.m. to 6:30 p.m. No work is permitted on Sundays and nationally recognized Government Holidays. 86. House Electrical Meter. Provide a house electrical meter to provide power for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each building on the site. Developments with single user buildings shall clearly show on the plans how the operation of exterior lighting and fire alarm systems when a house meter is not specifically proposed. 87. Protection of drains and penetration. Protection of joints and penetrations in fire resistance-rated assemblies shall not be concealed from view until inspected for all designed fire protection. Required fire seals/fire barriers in fire assemblies at fire resistant penetrations shall be installed by individuals with classification or certification covering the installation of these systems. Provide certification for the installation of each area and certification of compliance for Building Official's approval. At Plan Review Submittal 88. Submitting Plans and Calculations. Applicant must submit to Building and Safety four (4) complete sets of plans and two (2) sets of supporting calculations for review and approval including: a. An electrical plan including load calculations and panel schedule, plumbing schematic, and mechanical plan applicable to scope of work. b. A precise grading plan to verify accessibility for persons with disabilities. c. Truss calculations that have been stamped by the engineer of record of the building and the truss manufacturer engineer. Prior to Issuance of Grading Permit(s) 89. Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted separately from the building plans, shall be submitted to Building and Safety for review and approval. Prior to Issuance of Building Permit(s) 90. Plans Require Stamp of Registered Professional. Applicant shall provide appropriate stamp of a registered professional with original signature on the plans. Prior to Beginning of Construction 91. Pre-Construction Meeting. A pre-construction meeting is required with the building inspector prior to the start of the building construction. FIRE PREVENTION General Requirements 92. Fire Hydrants. The Fire Prevention Bureau is required to set minimum fire hydrant distances per roads and adjacent public streets. For all Commercial projects hydrants shall be spaced at 350 feet apart, and shall be located no more than 210 feet from any point on the street or Fire Department access road(s) frontage to a hydrant. The required fire flow shall be available from any adjacent hydrant(s) in the system. The upgrade of existing fire hydrants may be required (CFC Appendix C and Temecula City Ordinance 15.16.020). 93. Fire Dept. Plan Review. Final fire and life safety conditions will be addressed when building plans are reviewed by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC), and related codes which are in force at the time of building plan submittal. 94. Fire Flow. The Fire Prevention Bureau is required to set a minimum fire flow for the remodel or construction of all commercial and residential buildings per CFC Appendix B. The developer shall provide for this project, a water system capable of delivering 2,500 GPM at 20-PSI residual operating pressure for a 4-hour duration for this commercial project. The fire flow as given above has taken into account all information as provided. (CFC Appendix B and Temecula City Ordinance 15.16.020). Prior to Issuance of Grading Permit(s) 95. Access Road Widths. Fire Department vehicle access roads shall have an unobstructed width of not less than 24 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches (CFC Chapter 5 and City Ordinance 15.16.020). 96. Two Point Access. This development shall maintain two points of access, via all-weather surface roads, as approved by the Fire Prevention Bureau (CFC Chapter 5). 97. All Weather Access Roads. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be with a surface to provide all-weather driving capabilities. Access roads shall be 80,000 lbs. GVW with a minimum of AC thickness of .25 feet. In accordance with Section 3310.1, prior to building construction, all locations where structures are to be built shall have fire apparatus access roads. (CFC Chapter 5 and City Ordinance 15.16.020). Prior to Issuance of Building Permit(s) 98. Required Submittals (Fire Underground Water). The developer shall furnish three copies of the water system plans to the Fire Prevention Bureau for approval prior to installation for all private water systems pertaining to the fire service loop. Plans shall be signed by a registered civil engineer, contain a Fire Prevention Bureau approval signature block, and conform to hydrant type, location, spacing and minimum fire flow standards. Hydraulic calculations will be required with the underground submittal to ensure fire flow requirements are being met for the on-site hydrants. The plans must be submitted and approved prior to building permit being issued (CFC Chapter 33 and Chapter 5). 99.Required Submittals (Fire Sprinkler Systems). Fire sprinkler plans shall be submitted to the Fire Prevention Bureau for approval. Three sets of sprinkler plans must be submitted by the installing contractor to the Fire Prevention Bureau. These plans must be submitted prior to the issuance of building permit. Each building that is equipped with fire sprinklers will require separate permits. 100. Required Submittals (Fire Alarm Systems). Fire alarm plans shall be submitted to the Fire Prevention Bureau for approval. Three sets of alarm plans must be submitted by the installing contractor to the Fire Prevention Bureau. The fire alarm system is required to have a dedicated circuit from the house panel. These plans must be submitted prior to the issuance of building permit. Each building that is equipped with fire alarm will require separate permits. Prior to Issuance of Certificate of Occupancy 101. Hydrant Verification. Hydrant locations shall be identified by the installation of reflective markers (blue dots) (City Ordinance 15.16.020). 102. Knox Box--Box shall be installed a minimum of six feet in height and be located to the right side of the fire riser sprinkler room (CFC Chapter 5). 103. Addressing. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Commercial buildings shall have a minimum of 12-inch numbers with suite numbers being a minimum of six inches in size. All suites shall have a minimum of 6-inch high letters and/or numbers on both the front and rear doors. (CFC Chapter 5 and City Ordinance 15.16.020). POLICE DEPARTMENT General Requirements 104. Previous Conditions of Approval. All previous Conditions of Approval from PA15-1572 shall remain in full effect unless superseded herein. NOTICE OF PUBLIC HEARING Notice of Public Hearing A PUBLIC HEARING has been scheduled before the City of Temecula PLANNING COMMISSION to consider the matter described below: Case No: PA18-1529 Applicant: Donnie DeWees & Randy Morine Proposal: A Modification to a previously approved Development Plan (PA15-1572) for an approximately 1,389 square foot drive-thru restaurant and an approximately 6,281 square foot retail building located on the southwest corner of Temecula Parkway and Mahlon Vail Road Environmental: In accordance with the California Environmental Quality Act (CEQA), the proposed project is exempt from further environmental review and a Notice of Exemption will be adopted in compliance with CEQA (Section 15332, Class 32, In-Fill Development Projects) Case Planner: Scott Cooper, (951) 506-5137 Place of Hearing: 41000 Main St., Temecula, CA 92590, City of Temecula, Council Chambers Date of Hearing: July 17, 2019 Time of Hearing: 6:00 p.m. The complete agenda packet (including any supplemental materials) will be available for viewing in the Main Reception area at the Temecula Civic Center (41000 Main Street, Temecula) after 4:00 p.m. the Friday before the TemeculaCA.gov and will be available for public review at the respective meeting. Any writing distributed to a majority of the Commission regarding any item on the Agenda, after the posting of the Agenda, will be available for public review in the Main Reception area at the Temecula Civic Center (41000 Main Street, Temecula), 8:00 a.m. TemeculaCA.gov and will be available for public review at the meeting. Any petition for judicial review of a decision of the Planning Commission shall be filed within time required by, and controlled by, Sections 1094.5 and 1094.6 of the California Code of Civil Procedure. In any such action or proceeding seeking judicial review of, which attacks or seeks to set aside, or void any decision of the Planning Commission shall be limited to those issues raised at the hearing or in written correspondence delivered to the City Clerk at, or prior to, the public hearing described in this notice. Questions? Please call the Community Development Department at (951) 694-6400.